Crane load charts Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Crane load charts? On this page you'll find 170 study documents about Crane load charts.

Page 2 out of 170 results

Sort by

OSHA 30 Questions and Answers  Already Passed
  • OSHA 30 Questions and Answers Already Passed

  • Exam (elaborations) • 36 pages • 2024
  • Available in package deal
  • OSHA 30 Questions and Answers Already Passed Those who work on a crane or near crane operations must be trained. Which of the following is true for this training? D. All of the above Certain inspections of crane equipment may be made by a(n) ___________ person; however, crane inspections are typically required to be made by a(n) __________ person. Competent, qualified After safety-related modifications have been made to crane equipment, the equipment must be inspected by ________...
    (0)
  • $10.99
  • + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT) Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER there is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER Separate the boom h...
    (0)
  • $13.99
  • + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT) Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER Separate the boom hoist lines How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, before it should be removed from...
    (0)
  • $14.49
  • + learn more
NCCCO Practice QUESTIONS & CORRECT ANSWERS(GRADED A)
  • NCCCO Practice QUESTIONS & CORRECT ANSWERS(GRADED A)

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • Crane configuration includes: A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction B. hoist drum speeds, line pull, wire rope size and rigging C. load charts, LMI, axle weights and center of gravity D. drum rotation indicator, anti-two block, axle lock outs, and positive house lock - ANSWER A How does the operator determine the manufacturers recommended rope for the crane? A. count the sheav...
    (0)
  • $9.99
  • + learn more
MA Hoisting License 1B Questions With Verified Answers Latest Updated 2024/2025 | Scored A+
  • MA Hoisting License 1B Questions With Verified Answers Latest Updated 2024/2025 | Scored A+

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • MA Hoisting License 1B Questions With Verified Answers Latest Updated 2024/2025 | Scored A+. Where shall the hand signals for the machine in use be posted: On the job site 2. Where is it best to connect slings to lift boom sections: End fittings 3. All manufacturers load charts and operations manual shall be kept: On the machine 4. When shall wire rope be taken out of service if used as a running line for hoisting: Six randomly distributed broken wires i...
    (0)
  • $10.49
  • + learn more
NCCCO CORE QUESTIONS AND ANSWERS
  • NCCCO CORE QUESTIONS AND ANSWERS

  • Exam (elaborations) • 15 pages • 2023
  • The term "Superstructure or Upper works" refers to the area of the crane: Above the swing circle A crane must be level within _______% for the load chart ratings to be valid? 1% On what principle is crane stability based? Leverage What would be the effect of moving the tipping axis closer to the cranes center of gravity? Reduced stability Which of the following matches the appropriate load chart to a particular crane? Serial number A durable rating chart with legi...
    (0)
  • $12.99
  • + learn more
OSHA 30 Questions & Answers Already Passed!!
  • OSHA 30 Questions & Answers Already Passed!!

  • Exam (elaborations) • 22 pages • 2024
  • Available in package deal
  • Those who work on a crane or near crane operations must be trained. Which of the following is true for this training? - Answer-D. All of the above Certain inspections of crane equipment may be made by a(n) ___________ person; however, crane inspections are typically required to be made by a(n) __________ person. - Answer-Competent, qualified After safety-related modifications have been made to crane equipment, the equipment must be inspected by __________ prior to use. - Answer-A qualified ...
    (0)
  • $7.99
  • + learn more
OECP Exam Questions With 100% Correct Answers, Latest Updated 2024/2025 (GRADED)
  • OECP Exam Questions With 100% Correct Answers, Latest Updated 2024/2025 (GRADED)

  • Exam (elaborations) • 23 pages • 2024
  • What are the four different types of crane signals? Hand Voice Audible New 2. The shaded area on a load chart indicates _______? A structural chart 3. The minimum distance to a power line of unknown voltage is ? 50' 4. When hoisting personnel and have known voltage, can you use Table A and get closer than 20'? Never! 5. What is the minimum tale swing clearance requirement 2' 6. What kind of rigger is required for A/D? Qualified Rigger 7. Signal training is now required i...
    (0)
  • $15.49
  • + learn more
NCCCO Telescopic Boom Crane- LOAD CHARTS Winter 2024 Exam Review Questions and Answers 100% Pass
  • NCCCO Telescopic Boom Crane- LOAD CHARTS Winter 2024 Exam Review Questions and Answers 100% Pass

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • NCCCO Telescopic Boom Crane- LOAD CHARTS Winter 2024 Exam Review Questions and Answers 100% Pass
    (1)
  • $14.99
  • + learn more
MA Hoisting License 1B Questions With Verified Answers Updated 2024/2025 | Rated A+.
  • MA Hoisting License 1B Questions With Verified Answers Updated 2024/2025 | Rated A+.

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • MA Hoisting License 1B Questions With Verified Answers Updated 2024/2025 | Rated A+. Where is it best to connect slings to lift boom sections: End fittings 3. All manufacturers load charts and operations manual shall be kept: On the machine 4. When shall wire rope be taken out of service if used as a running line for hoisting: Six randomly distributed broken wires in 1 lay 5. When shall wire rope be taken out of service if used as a running line for hoisting: ...
    (0)
  • $11.99
  • + learn more