Electric boiler - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Electric boiler? On this page you'll find 407 study documents about Electric boiler.

Page 2 out of 407 results

Sort by

ABSA B1 Study Bank |440Questions| with Complete Solutions
  • ABSA B1 Study Bank |440Questions| with Complete Solutions

  • Exam (elaborations) • 152 pages • 2024
  • Packaged watertube boilers capacities range from? a. 2300 kg to 65000 kg per hour b. 500 kg to 100 mg per hour c. 15 psi to 15000 kg per hour d. 65000 to 100000 kg per hour Correct Answer-A The main advantage of the packaged boiler is its a. small size b. compact design c. low cost D. quality steam Correct Answer-C Feild erected boilers have outputs of? A 75,000 kg/h B 100,000 kg/h C 100 mg/h D 150,000 kg/h or more Correct Answer-D Where electric power is used as a h...
    (0)
  • $12.99
  • + learn more
4th Class Power Engineering Unit A11: Introduction to Boiler Designs Already  Passed
  • 4th Class Power Engineering Unit A11: Introduction to Boiler Designs Already Passed

  • Exam (elaborations) • 41 pages • 2024
  • Available in package deal
  • 4th Class Power Engineering Unit A11: Introduction to Boiler Designs Already Passed This type of boiler is more tolerant of Class 1 water treatment, because they are more resistant to corrosion: Select one: a. coil type b. fire tube c. cast iron d. water tube c One disadvantage of a firetube boiler is: Select one: a. higher maintenance costs than watertube boilers b. slow response to load changes c. require very high quality feedwater d. slow to bring up to operating pre...
    (0)
  • $11.49
  • + learn more
ABSA B1 Study Bank Questions Latest Update Graded A+
  • ABSA B1 Study Bank Questions Latest Update Graded A+

  • Exam (elaborations) • 187 pages • 2024
  • Packaged watertube boilers capacities range from? a. 2300 kg to 65000 kg per hour b. 500 kg to 100 mg per hour c. 15 psi to 15000 kg per hour d. 65000 to 100000 kg per hour A The main advantage of the packaged boiler is its a. small size b. compact design c. low cost D. quality steam C Feild erected boilers have outputs of? A 75,000 kg/h B 100,000 kg/h C 100 mg/hD 150,000 kg/h or more D Where electric power is used as a heating source, the boiler rating shall be the maximum kilowat...
    (0)
  • $12.99
  • + learn more
Power engineering 4th class unit 11 chapter 4 with complete solutions
  • Power engineering 4th class unit 11 chapter 4 with complete solutions

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • Power engineering 4th class unit 11 chapter 4 with complete solutions Electric boilers a) require tall stacks for pollution dispersal b) tend not to be very compact c) require sootblowers when fuel is coal d) have energy conversion efficiencies close to 100% e) are not as safe as other boilers D Electric boilers: 1) Are low pressure boilers only 2) Do not need gauge glasses 3) Do not need a chimney 4) Are economical in power consumption 5) Are hot water boilers only ...
    (0)
  • $9.99
  • + learn more
Stationary Engineer Exam Questions With Correct Answers Latest 2024-2025 (GRADED A+)
  • Stationary Engineer Exam Questions With Correct Answers Latest 2024-2025 (GRADED A+)

  • Exam (elaborations) • 63 pages • 2024
  • Available in package deal
  • Stationary Engineer Exam Questions With Correct Answers Latest (GRADED A+) On a gas fired boiler what is the proper gas to air mixture - Answer 30%-70% and in special arrangements it can be as high as 100% . ANSWER CHAPTER 11 remember% What is the total hardness in a system that was found to have calcium hardness of 60ppm and magnesium hardness of 18ppm and carbon hardness of 12 ppm? - Answer TH=(Ca x 2.5) + (Mg x 4.1)nTH=(60 x 2.5) + (18 x 4.1)nTH= 150+73.8 =( 223.8 PPM) How often s...
    (0)
  • $14.99
  • + learn more
ABSA 5th Class Questions and Answers
  • ABSA 5th Class Questions and Answers

  • Exam (elaborations) • 31 pages • 2024
  • Available in package deal
  • Where are the return openings located regarding air distribution systems? - Answer-Return air openings are located on inner walls. The minimum temperature of the water used in a hydrostatic test of a boiler cannot be less than what temperature? - Answer-20 degrees Celsius Which of the following are causes of pressure explosions? 1. effects of corrosion 2. weak pilot flame 3. stressed material due to heating too quickly 4. insufficient purge 5. scale and sludge build-up - Answer-1, 3, 5 ...
    (0)
  • $9.69
  • + learn more
ABSA 3B1 Practice Questions and Answers with Solutions 100% Correct | updated 2024 (983 Verified Q&A)
  • ABSA 3B1 Practice Questions and Answers with Solutions 100% Correct | updated 2024 (983 Verified Q&A)

  • Exam (elaborations) • 269 pages • 2024
  • Available in package deal
  • ABSA 3B1 Practice Questions and Answers with Solutions 100% Correct | updated 2024 (983 Verified Q&A) CHAPTER 1 - Number of questions on exam - 7 Chapter 1 Packaged watertube boilers capacities range from? a. 2300 kg to 65000 kg per hour b. 500 kg to 100 mg per hour c. 15 psi to 15000 kg per hour d. 65000 to 100000 kg per hour a. 2300 kg to 65000 kg per hour The main advantage of the packaged boiler is its _____ _____. a. small size b. compact design c. low cost d. quality st...
    (0)
  • $16.99
  • + learn more
4A Power Engineering - Unit 3 - Introduction to Power Engineering and its Governance in Canada Correct 100%
  • 4A Power Engineering - Unit 3 - Introduction to Power Engineering and its Governance in Canada Correct 100%

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • why was the ASME formed? - ANSWER develop tech info, high standard of design and education, personal and professional development,ethical conduct, solutions for tech problems CSA B51 committee? - ANSWER provincial and territorial jurisdiction, boiler manufacturers, insurance companies what is the purpose of B52? - ANSWER provide safe design, construction, installation, operation, repair of refrigeration and air con. promote uniform requirements ASME 1 - ANSWER aspects of boiler design ...
    (0)
  • $13.99
  • + learn more
ABSA B1 Study Bank Questions with Complete Solutions 100% Verified Packaged watertube boilers capacities range from?
  • ABSA B1 Study Bank Questions with Complete Solutions 100% Verified Packaged watertube boilers capacities range from?

  • Exam (elaborations) • 115 pages • 2024
  • Available in package deal
  • ABSA B1 Study Bank Questions with Complete Solutions 100% Verified Packaged watertube boilers capacities range from? a. 2300 kg to 65000 kg per hour b. 500 kg to 100 mg per hour c. 15 psi to 15000 kg per hour d. 65000 to 100000 kg per hour - Correct Answer A The main advantage of the packaged boiler is its a. small size b. compact design c. low cost D. quality steam - Correct Answer C Feild erected boilers have outputs of? A 75,000 kg/h B 100,000 kg/h C 100 mg/h D 150,...
    (0)
  • $11.99
  • + learn more
Power Engineering Part A Unit 11  Rated A+
  • Power Engineering Part A Unit 11 Rated A+

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • Power Engineering Part A Unit 11 Rated A+ Air Heater Transfer heat from the flue gas, or from steam, to the combustion air entering the boiler, to improve combustion efficiency Blowoff Valve Manually operated valve connected to a boiler for the intermittent discharge of boiler sediment, for lowering a boilers water level, or for draining a boiler Blowoff Vessel Vessel that intercepts, cools, and depressurizes boiler blowoff water, on order to protect municipal sewer systems Boi...
    (0)
  • $9.99
  • + learn more