Fuel tanks - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Fuel tanks? On this page you'll find 1541 study documents about Fuel tanks.

Page 2 out of 1.541 results

Sort by

Oil Burner License Exam 2023 Questions and Answers
  • Oil Burner License Exam 2023 Questions and Answers

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • What is the first thing a tech should do when arriving at a no combustion call? - Answer- Ask how many times the customer reset the unit. What is the best long term solution for preventing a clogged nozzle? - Answer- -Remove any underground storage tanks. -Install a quality oil filter. -Cut the suction line 10" above the tank outlet to prevent sludge. Hot water and steam valves are interchangeable. - Answer- False When in the presence of a flame, a cad cell normally reads.. - Answe...
    (2)
  • $12.49
  • 4x sold
  • + learn more
COF P-98 Practice test Exam Questions & Answers 100% Correct!
  • COF P-98 Practice test Exam Questions & Answers 100% Correct!

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • The person supervising the Fuel-Oil transfer in the building from one floor to another must hold what type of certificate of fitness - ANSWERSP-98 Certificate of Fitness In designing the fuel-Oil transfer system, such as diesel #2 oil from the lowest floor to the floor above the tank level, the following factors must be considered: - ANSWERS- Maximum inlet suction an flow-rate - Design of oil piping system and discharge pressure - Proper control strategy _______________________ fires ar...
    (0)
  • $12.99
  • 1x sold
  • + learn more
CTR 156CT Propane Final Exam Questions and Correct Answers
  • CTR 156CT Propane Final Exam Questions and Correct Answers

  • Exam (elaborations) • 5 pages • 2023
  • Available in package deal
  • CTR 156CT Propane Final Exam Questions and Correct Answers If you see an "S" next to the date on a cylinder, that means the cylinder must be requalified _________ from that date. - ANSWER 10 years ____________ control the flow of propane through the piping system of a dispenser. - ANSWER Valves At room temperature, propane is in what state? - ANSWER Gas Make sure there are no ignition sources within _______ feet of the autogas filling area. - ANSWER ...
    (2)
  • $13.39
  • 6x sold
  • + learn more
U1 UST Installation/Retrofitting|2023 LATEST UPDATE|GUARANTEED SUCCESS
  • U1 UST Installation/Retrofitting|2023 LATEST UPDATE|GUARANTEED SUCCESS

  • Exam (elaborations) • 21 pages • 2023
  • Available in package deal
  • 1. One of the significant causes of leaks in underground liquid storage systems is ____________ ________________ Improper Installation 2. Written Plans are required to obtain permits, solicit bids, and provide precise guidance for installers. 3. The plans should Describe the property, identify the size and location of the tanks, indicate the liquids to be stored and provide the location of the dispensers and piping. 4. Storage systems discussed in this recommended practic...
    (1)
  • $18.49
  • 2x sold
  • + learn more
USTs exam 2024 with 100% correct answers
  • USTs exam 2024 with 100% correct answers

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • The Hazardous and Solid Waste Amendments (HSWA) of 1984 added Subtitle I to the correct answersResource Conservation and Recovery Act (RCRA). Subtitle I established a national regulatory program for the control of underground storage tank (UST) systems used to store correct answersliquid petroleum or chemicals defined as hazardous substances. In 1985, EPA created the Office of Underground Storage Tanks to develop and implement correct answersa regulatory program for underground storage tan...
    (0)
  • $16.99
  • 1x sold
  • + learn more
Nyc high pressure boiler license Exam Questions with Correct Answers
  • Nyc high pressure boiler license Exam Questions with Correct Answers

  • Exam (elaborations) • 22 pages • 2024
  • Available in package deal
  • Nyc high pressure boiler license Exam Questions with Correct Answers The minimum blowdown for a spring loaded safety valve shall be of what percent of set pressure? - Answer-10% How is the main steam pressure gages tested? - Answer-With an inspectors gage Who is in charge of the code for any plumbing installations? - Answer-The nyc plumbing code When will anchorage or guides be inspected? - Answer-Annually How many brass washout plugs does a miniature boiler have? - Answer-3 brass wa...
    (1)
  • $13.29
  • 1x sold
  • + learn more
ICC California UST Inspector Exam Questions and Answers 100% Correct 202425 Version.
  • ICC California UST Inspector Exam Questions and Answers 100% Correct 202425 Version.

  • Exam (elaborations) • 84 pages • 2024
  • Available in package deal
  • ICC California UST Inspector Exam Questions and Answers 100% Correct 202425 Version. Which agency approves a site-specific variance which allows for an alternative method of construction or monitoring: a.) The Regional Water Quality Board b.) The State Water Resources Control Board c.) The Department of Toxic Substance Control d.) The local agency a.) The Regional Water Quality Board CCR Title 23, Sec 2681(a) The regulations to enforce compliance of underground storage tan...
    (0)
  • $15.54
  • 3x sold
  • + learn more
UPDATED 2024/2025  CETP 1.0: Module 6 Exam
  • UPDATED 2024/2025 CETP 1.0: Module 6 Exam

  • Exam (elaborations) • 3 pages • 2023
  • Available in package deal
  • Also known as NFPA 54, the __________ covers fire prevention and installation standards for fuel gases, as well as the installation of piping and appliances for residential and commercial applciations - CORRECT ANS A. Liquefied Petroleum Gas Code B. American Standards National Institute C. National Fuel Gas Code D. Unfired Boiler and Pressure Vessel Code Tanks and pressure relief valves built according to the ASME code are usually marked with a special ASME stamp. - CORRECT ANS Tru...
    (2)
  • $16.89
  • 3x sold
  • + learn more
FDNY C-14 Exam Questions And Answers 2023 Solutions RATED A+
  • FDNY C-14 Exam Questions And Answers 2023 Solutions RATED A+

  • Exam (elaborations) • 15 pages • 2023
  • FDNY C-14 Exam Questions And Answers 2023 Solutions Basement a story partly below the grade plane and having less than one-half its clear height (measured from finished floor to finished ceiling) below the grade plane Boiling point the temperature at which the vapor pressure of a liquid equals the atmospheric pressure of 14.7 PSI or 760 mm of mercury. When a boiling point is unavailable for a material, what is used? 20% evaporated point of a distillation performed in accordance with ASTM D...
    (0)
  • $9.99
  • 1x sold
  • + learn more
CETP 1.0: Module 6 Exam 2023 Questions and Answers with complete solution
  • CETP 1.0: Module 6 Exam 2023 Questions and Answers with complete solution

  • Exam (elaborations) • 3 pages • 2023
  • Also known as NFPA 54, the __________ covers fire prevention and installation standards for fuel gases, as well as the installation of piping and appliances for residential and commercial applciations - CORRECT ANS A. Liquefied Petroleum Gas Code B. American Standards National Institute C. National Fuel Gas Code D. Unfired Boiler and Pressure Vessel Code Tanks and pressure relief valves built according to the ASME code are usually marked with a special ASME stamp. - CORRECT ANS True Pro...
    (1)
  • $4.99
  • 3x sold
  • + learn more