Module 6 nccer - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Module 6 nccer? On this page you'll find 271 study documents about Module 6 nccer.
Page 2 out of 271 results
Sort by
-
Module 6 NCCER into to Basic rigging-with 100% verified solutions
- Exam (elaborations) • 9 pages • 2024
-
- $12.99
- + learn more
Module 6 NCCER into to Basic rigging-with 100% verified solutions
-
Module 6 NCCER into to Basic rigging questions with verified correct answers
- Exam (elaborations) • 6 pages • 2024
-
- $6.39
- + learn more
Module 6 NCCER into to Basic rigging questions with verified correct answers 
 
1.	During a rigging operation if an emergency happens who has the authority to give the emergency stop hand signal?:Answer: (Anyone on the ground who is in sight of the crane operator). 
2.	The recommendation when lifting a load longer then____is to use two chokerhitches.:Answer: (12 feet) 
3.	A hand-operated winching device that should never be used for vertical overhead lifting is a (:Answer: come-along
-
Module 6 NCCER Rigging Questions and Answers
- Exam (elaborations) • 5 pages • 2024
-
- $10.00
- + learn more
Module 6 NCCER Rigging Questions and Answers 
Synthetic fibers, cast iron links, and wire rope. 
Slings are commonly made out of? 
 
 
Removed from service immediately. 
If the identification tag on a synthetic sling is missing or illegible, the sling must be? 
 
 
Body 
The size of the shackle is determined by the diameter of its? 
 
 
Hoist 
A type of rigging equipment that uses a pulley system to provide a mechanical advantage for lifting a load is a? 
 
 
Choker hitch 
When a load has no at...
-
Module 6 NCCER into to Basic rigging Exam Questions And Answers
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $8.49
- + learn more
Module 6 NCCER into to Basic rigging Exam Questions And Answers 
 
During a rigging operation if an emergency happens who has the authority to give the emergency stop hand signal? - ANS (Anyone on the ground who is in sight of the crane operator). 
 
The recommendation when lifting a load longer than __________ is to use two choker hitches. - ANS (12 feet) 
 
A hand-operated winching device that should never be used for vertical overhead lifting is a ( - ANS come-along 
 
All chain hoi...
-
Module 6 NCCER into to Basic rigging|A+ Graded
- Exam (elaborations) • 5 pages • 2024
-
- $10.00
- + learn more
Module 6 NCCER into to Basic rigging|A+ Graded 
During a rigging operation if an emergency happens who has the authority to give theemergency stop hand signal? 
(Anyone on the ground who is in sight of the craneoperator). 
 
 
The recommendation when lifting a load longer then __________ is to use two chokerhitches. 
(12 feet) 
 
 
A hand-operated winching device that should never be used for vertical overhead liftingis a ( 
come-along 
 
 
All chain hoists use a ____________ to lift heavy loads...
Too much month left at the end of the money?
-
Module 6 NCCER into to Basic rigging|A+ Graded
- Exam (elaborations) • 5 pages • 2024
-
- $10.00
- + learn more
Module 6 NCCER into to Basic rigging|A+ Graded 
d. manufacturer's name or trademark 
Identification tags for slings must include the ______. 
 
a. type of protective pads to use 
b. type of damage sustained during use 
c. color of the tattle-tail 
d. manufacturer's name or trademark 
 
 
a. fiber core 
The type of wire rope core that is susceptible to heat damage at relatively low temperatures is the ______. 
 
a. fiber core 
b. strand core 
c. independent wire rope core 
d. metallic link supp...
-
MODULE 6 NCCER INTO TO BASIC RIGGING EXAM (ACTUAL EXAM) WITH QUESTIONS WITH VERY ELABORATED ANSWERS CORRECTRY WELL ORGANIZED LATEST 2024 – 2025 ALREADY GRADED A+
- Exam (elaborations) • 8 pages • 2024
-
- $13.99
- + learn more
MODULE 6 NCCER INTO TO BASIC RIGGING EXAM (ACTUAL EXAM) WITH QUESTIONS WITH VERY ELABORATED ANSWERS CORRECTRY WELL ORGANIZED LATEST 2024 – 2025 ALREADY GRADED A+
-
Module 6 NCCER into to Basic rigging|A+ Graded
- Exam (elaborations) • 1 pages • 2024
-
- $10.29
- + learn more
Module 6 NCCER into to Basic rigging|A+ Graded 
the max load weight that a sling is designed to carry is the? 
rated capacity 
 
 
most alloy steel chain slings can be used in Temps up to? 
500°F (260°c) 
 
 
when a tattle tail has been pulled into the jacket of a synthetic sling, the sling most likely has been? 
overloaded 
 
 
if a wire rope sling appears to be damaged the decision to keep it in service must be made by a? 
competent person 
 
 
because of the need for increased toughness, sh...
-
Module 6 NCCER into to Basic rigging | Questions and answers | Updated
- Exam (elaborations) • 4 pages • 2024
-
- $10.49
- + learn more
Module 6 NCCER into to Basic rigging | Questions and answers | Updated
-
Module 6 NCCER into to Basic rigging questions with correct answers
- Exam (elaborations) • 6 pages • 2024
-
- $10.99
- + learn more
During a rigging operation if an emergency happens who has the authority to give theemergency stop hand signal? - answer-(Anyone on the ground who is in sight of the craneoperator). 
 
The recommendation when lifting a load longer then __________ is to use two chokerhitches. - answer-(12 feet) 
 
A hand-operated winching device that should never be used for vertical overhead liftingis a ( - answer-come-along 
 
All chain hoists use a ____________ to lift heavy loads. - an...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia