Nec nfpa 70 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nec nfpa 70? On this page you'll find 49 study documents about Nec nfpa 70.

Page 2 out of 49 results

Sort by

NFPA 70 NEC 2011 Exam With 100% Correct And Verified Answers 2024
  • NFPA 70 NEC 2011 Exam With 100% Correct And Verified Answers 2024

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • NFPA 70 NEC 2011 Exam With 100% Correct And Verified Answers 2024
    (0)
  • $20.19
  • + learn more
NFPA 70 NEC 2020 Exam Questions with Answers
  • NFPA 70 NEC 2020 Exam Questions with Answers

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • NFPA 70 NEC 2020 Exam Questions with Answers Article 90 - Answer-Intro Article 100 - Answer-Definitions Article 110.26 - Answer-Working Space Article 210 - Answer-Branch Circuits Article 210.8 - Answer-GFCI Protection Article 210.12 - Answer-AFCI Protection Table 210.24 - Answer-Branch Circuit Summary Article 210.52 - Answer-Dwelling Receptacle Outlets Article 215 - Answer-Feeders Article 220 - Answer-Branch, Feeder, Service Calculations Table 220.55 - Answer-Range...
    (0)
  • $12.49
  • + learn more
NETA level 2 exam final exam 2024  updated
  • NETA level 2 exam final exam 2024 updated

  • Exam (elaborations) • 22 pages • 2024
  • NETA level 2 exam final exam 2024 updated What is the preferred method of performing primary-injection testing on a low voltage circuit breaker with ground fault protection? - CORRECT ANSWER-Use of the manufacturer's test kit or rewiring the neutral CT input is the preferred method of primary-injection testing on a low voltage circuit breaker with ground fault protection, otherwise two poles can be connected in series to provide balanced secondary currents to the trip unit. At wha...
    (0)
  • $15.49
  • + learn more
NFPA 70 NEC 2020 Exam Questions with Answers (1)
  • NFPA 70 NEC 2020 Exam Questions with Answers (1)

  • Exam (elaborations) • 6 pages • 2024
  • NFPA 70 NEC 2020 Exam Questions with Answers (1) Article 90 - Answer-Intro Article 100 - Answer-Definitions Article 110.26 - Answer-Working Space Article 210 - Answer-Branch Circuits Article 210.8 - Answer-GFCI Protection Article 210.12 - Answer-AFCI Protection Table 210.24 - Answer-Branch Circuit Summary Article 210.52 - Answer-Dwelling Receptacle Outlets Article 215 - Answer-Feeders Article 220 - Answer-Branch, Feeder, Service Calculations Table 220.55 - Answ...
    (0)
  • $13.49
  • + learn more
Master Electrician PREP  QUESTIONS WITH ANSWERS 2024/2025
  • Master Electrician PREP QUESTIONS WITH ANSWERS 2024/2025

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • Master Electrician PREP QUESTIONS WITH ANSWERS where passing through a floor, cables shall be protected from physical damage at what distance above the floor? a. 10 inches b. 6 inches c. 12 inches d. 8 inches - ANSWER 6 inches NFPA 70 : NEC 2011 : 334.15.B A company has an electrical contractors license. The Master Electrician decides to leave the company. How many days does the company (licensee) have to notify the division? a. 30 days b. 10 days c. 20 days d. 5 days - ANSWER...
    (0)
  • $12.99
  • + learn more
ELMC Master Electrician Code 251-275 Questions With Complete Solutions
  • ELMC Master Electrician Code 251-275 Questions With Complete Solutions

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • What is the MAXIMUM allowable voltage that conductors within electrical nonmetallic tubing (ENT) may carry? a. 1000 b. 2000 c. 600 d. 240 correct answer: 1000 NFPA 70 : NEC 2017 : 300.2, 362.1 Unprotected cable is to be installed in holes bored in wood studs. Each hole shall be bored so that the edge of the hole is what minimum distance for the edge of the stud? a. 2 b. 1 c. 1-1/2 d. 1-1/4 correct answer: 1-1/4 NFPA 70 : NEC 2011 : 300.4.A.1 Given: Only the following type T...
    (0)
  • $10.99
  • + learn more
NICET 1 Rev 01 Written Exam Questions & Answers.
  • NICET 1 Rev 01 Written Exam Questions & Answers.

  • Exam (elaborations) • 80 pages • 2024
  • NICET 1 Rev 01 Written Exam Questions & Answers. "A. As Built Drawings Hint: NFPA 72 - 14.6.1.1 - KEY: records sub testing, inspection and maintenance NOTE: As built drawings are drawings of record per A.7.7.2.3 - CORRECT ANSWER " "After acceptance testing, what type of drawings are required to be presented to the building owner? A. As Built Drawings B. Contract Drawings C. Point-To-Point Diagrams D. Manufacturer's Drawings " "C. 3 Hint: NFPA 72 - 10.6.11.6.3 - KEY: fuel - CO...
    (0)
  • $12.49
  • + learn more
NETA LEVEL II EXAM QUESTIONS CORRECTLY ANSWERED 2024.
  • NETA LEVEL II EXAM QUESTIONS CORRECTLY ANSWERED 2024.

  • Exam (elaborations) • 28 pages • 2024
  • NETA LEVEL II EXAM QUESTIONS CORRECTLY ANSWERED 2024. What is the preferred method of performing primary-injection testing on a low voltage circuit breaker with ground fault protection? Use of the manufacturer's test kit or rewiring the neutral CT input is the preferred method of primary-injection testing on a low voltage circuit breaker with ground fault protection, otherwise two poles can be connected in series to provide balanced secondary currents to the trip unit. At what current le...
    (0)
  • $9.99
  • + learn more
NICET 1 Questions and Answers (2022/2023) (Scored A)
  • NICET 1 Questions and Answers (2022/2023) (Scored A)

  • Exam (elaborations) • 89 pages • 2023
  • Available in package deal
  • NICET 1 Questions and Answers (2022/2023) (Scored A) If combination audible/visible appliances are installed, the location of the installed appliance shall be determined by the requirements of a. the audible appliance b. the visible appliance c. the NEC d. the AHJ b. the visible appliance What is the maximum number of 12 gauge THHN wires that can be installed in 1-inch EMT? a. 26 b. 35 c. 19 d. 32 a. 26 Two resistors are connected in parallel. R1= 300 Ohms, R2= 300 Ohms. What is their...
    (0)
  • $11.49
  • + learn more