Nicet level 1 2 3 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nicet level 1 2 3? On this page you'll find 87 study documents about Nicet level 1 2 3.

Page 2 out of 87 results

Sort by

Nicet level 1 Study Guide 2023 Questions | 150 Questions and 100%Correct Answers Verified.
  • Nicet level 1 Study Guide 2023 Questions | 150 Questions and 100%Correct Answers Verified.

  • Exam (elaborations) • 13 pages • 2023
  • Nicet level 1 Study Guide 2023 Questions | 150 Questions and 100%Correct Answers Verified. When testing a water level supervisory switch serving a pressure tank a signal shall indicate if the water level _____________from the required level (NFPA 72, Table 14.4.3.2 17 (j) (4) - Answer rises or falls over 3 inches If combination audible/visible appliances are installed the location of the installed appliance shall be determined by the requirements of _______. (Nfpa 72 18.4.8.1) - Answer the...
    (0)
  • $11.49
  • + learn more
NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS
  • NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS Acceptance - Answer-The written acceptance by the Department of the Work. acceptance testing - Answer-Testing conducted by the Department to measure the degree of compliance to the Contract actual cost - Answer-The computed cost using calculations provided addendum - Answer-A Contract revision or response to a Contractor inquiry issued after advertisement and before the opening of bids. as-built quantity - Answer-The quantity ...
    (0)
  • $12.49
  • + learn more
NICET Level 1 - Water Based Layout Already Rated A+
  • NICET Level 1 - Water Based Layout Already Rated A+

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • NICET Level 1 - Water Based Layout Already Rated A+ Toggle hangers shall be permitted only for the support of pipe __________ inches or smaller in size under ceilings of hollow tile or metal lath and plaster. 1 2/2 in. (ref. NFPA 13 2016 Sec. 9.2.1.1.2. While conducting a flow test, the chosen hydrant should be ______ As close to the property where the sprinkler system is being installed. (Ref, NFPA 13 Sec. A.24.2.2. or NFPA 291) What formula is used to determine the discharge coef...
    (0)
  • $10.49
  • + learn more
Nicet Level 2: Concrete Exam Questions and Answers 2024
  • Nicet Level 2: Concrete Exam Questions and Answers 2024

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Nicet Level 2: Concrete Exam Questions and Answers 2024 What is the testing frequency for concrete? - Answer-every 50 yards When should you take cylinder samples? - Answer-Every 100 yards What are the components on a batch ticket? - Answer-1. Ticket Number 2. Plant 3. Project Number 4. Mix ID 5. Time of Batch 6. Time arrival 7. Time Discharge 8. Time Completed 9. Mix proportions When should concrete samples should not be taken? - Answer-Before 10% and 90% of truck has been discharge...
    (0)
  • $11.49
  • + learn more
NICET Fire Alarm Level 1 Exam Questions And Revised Correct Answers
  • NICET Fire Alarm Level 1 Exam Questions And Revised Correct Answers

  • Exam (elaborations) • 8 pages • 2024
  • NICET Fire Alarm Level 1 Exam Questions And Revised Correct Answers When a device is inaccessible due to excessive height, such as an atrium, what it the maximum interval for testing? - Answer -18 months When installing a wall-mounted fire telephone appliance to the public, what is the acceptable maximum mounting height from the floor? - Answer -66 inches Elevator lobby smoke detectors shall be mounted within a maximum of which distance from the center-line of the door? - Answer -21 fee...
    (0)
  • $12.99
  • + learn more
Nicet Level 2 questions and answers 100% verified
  • Nicet Level 2 questions and answers 100% verified

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • Nicet Level 2 questions and answers 100% verified Consider a room which is 40' square. How many 15cd wall mounted strobes are required to adequately cover this space? 4 What is the testing frequency of a strobe? Annually In a corridor application, visible appliances shall be rated not less than ________ cd? 15 Consider a household fire alarm system where the primary power is provided by a circuit that can be switched off by means other than a circuit breaker. The battery must be recharged i...
    (0)
  • $9.99
  • + learn more
TFM01 Exam Questions and Answers 100% Pass
  • TFM01 Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • TFM01 Exam Questions and Answers The fire marshal shall send notice to each examinee of the results of the examination no later than -Answer-30 days If the examination is conducted by a testing service the state marshal shall send notice of the results no later than -Answer-14 days If examination results will be delayed the state marshal shall send notice to the examinee no later than -Answer-90 days A renewal of a registration certificate or license is valid for a period of -Answer-2 yea...
    (0)
  • $12.49
  • + learn more
Nicet level 1 Study Guide questions and answers 100% pass
  • Nicet level 1 Study Guide questions and answers 100% pass

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • Nicet level 1 Study Guide questions and answers 100% pass When testing a water level supervisory switch serving a pressure tank a signal shall indicate if the water level _____________from the required level (NFPA 72, Table 14.4.3.2 17 (j) (4) - Answer-rises or falls over 3 inches If combination audible/visible appliances are installed the location of the installed appliance shall be determined by the requirements of _______. (Nfpa 72 18.4.8.1) - Answer-the visible appliance What is the ...
    (0)
  • $12.49
  • + learn more
TFM01 Exam Questions and Answers
  • TFM01 Exam Questions and Answers

  • Exam (elaborations) • 10 pages • 2024
  • TFM01 Exam Questions and Answers The fire marshal shall send notice to each examinee of the results of the examination no later than -Answer-30 days If the examination is conducted by a testing service the state marshal shall send notice of the results no later than -Answer-14 days If examination results will be delayed the state marshal shall send notice to the examinee no later than -Answer-90 days A renewal of a registration certificate or license is valid for a period of -Answer-2 yea...
    (0)
  • $12.49
  • + learn more