Parametric technique Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Parametric technique? On this page you'll find 288 study documents about Parametric technique.

Page 2 out of 288 results

Sort by

IET Final Exam || very Flawless.
  • IET Final Exam || very Flawless.

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • The _________ that exists between the environments of NX ensures that any modification made in the model in one environment is automatically reflected in other environments immediately correct answers Bidirectional associativity The _____ is a file extension associated with all the files that are created in different environments of NX correct answers Prt. The ______ keeps a track of all operations that are carried out on a part correct answers Part Navigator The ______ constraint is us...
    (0)
  • $11.49
  • + learn more
MAE 1351 EXAM 1 2024 COMPLETE QUESTIONS AND ANSWERS ALREADY PASSED
  • MAE 1351 EXAM 1 2024 COMPLETE QUESTIONS AND ANSWERS ALREADY PASSED

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • Profile - CORRECT ANSWER a completed sketch that is used to create a solid Tangent - CORRECT ANSWER Touching but not intersecting Constraints - CORRECT ANSWER the geometric relationships, dimensions, or equations, that control the size, shape, and orientation and include assumptions that the CAD sketcher makes Implicitly defined - CORRECT ANSWER hidden from the sketcher Coincident - CORRECT ANSWER forces two points to coincide Concentric - CORRECT ANSWE...
    (0)
  • $13.49
  • + learn more
CDFM Module 4-Exam Questions and Answers 2022/2023
  • CDFM Module 4-Exam Questions and Answers 2022/2023

  • Exam (elaborations) • 12 pages • 2022
  • Available in package deal
  • What is JCIDS (Joint Capabilities Integration and Development System)? - ANSWER assesses gaps in military joint warfighting capabilities and recommends solutions to resolve these gaps Defense Acquisition System - ANSWER Process by which DoD acquires weapon systems and automated information systems What document provides entry into Milestone A the the Defense Acquisition System? - ANSWER Materiel Development Decision What are the two steps in pre-systems acquisition? - ANSWER Materiel so...
    (0)
  • $9.99
  • 3x sold
  • + learn more
IET 154 NX Questions || with 100% Accurate Solutions.
  • IET 154 NX Questions || with 100% Accurate Solutions.

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • The _______ that exists between the environments of NX ensures that any modification made in the model in one environment is automatically reflected in other environments immediately. correct answers bidirectional associativity The _______ is a file extension associated with all the files that are created in different environments of NX. correct answers prt The ______ keeps a track of all of the operations that are carried out on the part. correct answers part navigator The _______ cons...
    (0)
  • $11.49
  • + learn more
APM PMQ - Project Delivery Exam with Correct Answers
  • APM PMQ - Project Delivery Exam with Correct Answers

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • APM PMQ - Project Delivery Exam with Correct Answers what is estimating - ️️ uses different methods to produce a prediction of the time and resources required to complete the scope of the work to the defined quality requirements. when do estimates become more accurate - ️️ Throughout the project, it is required for the PM to produce estimates. Estimates are often described as approximations as can never be 100% accurate. The accuracy of the estimate highly depends on the amount of...
    (0)
  • $10.49
  • + learn more
ACQ 202 MODULE 1-4 FULL EXAM WITH GUARANTEED ACCURATE ANSWERS |VERIFIED
  • ACQ 202 MODULE 1-4 FULL EXAM WITH GUARANTEED ACCURATE ANSWERS |VERIFIED

  • Exam (elaborations) • 20 pages • 2024
  • There are four basic techniques used by the DoD for creating cost estimates: Analogy, Parametric, and Actual Costs are three techniques. - ACCURATE ANSWEREngineering Which appropriation category would fund the design of new equipment, material, or software? - ACCURATE ANSWERResearch, Development, Test and Evaluation What's the primary purpose of an Analysis of Alternatives (AoA)? - ACCURATE ANSWERProvide decision-making aid in selecting a cost-effective material alternative When compar...
    (0)
  • $15.49
  • + learn more
OMIS 352 FINAL EXAM ACTUAL QUESTIONS AND ANSWERS 2024-2025 SOLVED 100%
  • OMIS 352 FINAL EXAM ACTUAL QUESTIONS AND ANSWERS 2024-2025 SOLVED 100%

  • Exam (elaborations) • 37 pages • 2024
  • Available in package deal
  • OMIS 352 FINAL EXAM ACTUAL QUESTIONS AND ANSWERS SOLVED 100% _____ address where the project stands in terms of meeting scope, time, and cost goals a.Status reports b.Lessons-learned reports c.Technical reports d.Progress reports Ans- A. Status Reports Analogous estimates are also known as _____ estimates. a. parametric b. bottom-up c. top-down d. budgetary Ans- C. Top Down Which of the following is true about identifying stakeholder? a.It is not very difficult t...
    (0)
  • $16.49
  • + learn more
CAPM PRACTICE EXAM 3|197 Questions with Verified Answers,100% CORRECT
  • CAPM PRACTICE EXAM 3|197 Questions with Verified Answers,100% CORRECT

  • Exam (elaborations) • 57 pages • 2024
  • Available in package deal
  • CAPM PRACTICE EXAM 3|197 Questions with Verified Answers "QUESTION NO: 1 Power, urgency and legitimacy are attributes of which stakeholder classification model? salience influence/impact power/interest power/influence - CORRECT ANSWER Power, urgency and legitimacy are attributes of which stakeholder classification model? salience "QUESTION NO: 2 Through whom do project managers accomplish work? consultants and stakeholders stakeholders and functional managers project team...
    (0)
  • $11.99
  • + learn more
CTCM Test A Questions With Complete Solutions
  • CTCM Test A Questions With Complete Solutions

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • Project Management is defined as: correct answer: The discipline of defining and achieving specific goals and objectives for temporary and unique efforts through effective management. An individual responsible for managing the successful planning, implementation, and execution of a system, service or product to meet a need while balancing cost, schedule and performance requirements is a: correct answer: Project Manager One of the four major reasons that projects fail is: correct answer: ...
    (0)
  • $12.99
  • + learn more
WARRANT BOARD EXAM|COMPLETE QUESTIONS WITH A+ GRADED ANSWERS
  • WARRANT BOARD EXAM|COMPLETE QUESTIONS WITH A+ GRADED ANSWERS

  • Exam (elaborations) • 4 pages • 2024
  • WARRANT BOARD EXAM|COMPLETE QUESTIONS WITH A+ GRADED ANSWERS 7 Exception to competition 6.302-1 only one responsible source 6.302-2 unusual and compelling urgency 6.302-3 industrial mobilization, engineering, developmental or research capability, or expert services 6.302-4 international agreement 6.302-5 authorized or required by statute 6.302-6 national security 6.302-7 public interest 5 Exception to certified cost and pricing data 15.403-1 Adequate price competition Price set b...
    (0)
  • $10.39
  • + learn more