PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.

  • Exam (elaborations) • 39 pages • 2024
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024. During System Restoration, what is the optimal Frequency Range? 59.75 - 61 Hz The 500 kV system has normal bus voltages between? 500 to 550 kVRead More When Connecting 2 islands, the operator must match? Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energi...
    (0)
  • $12.99
  • + learn more
PJM Generation Dispatch Exam - Questions and Answers (Complete Solutions)
  • PJM Generation Dispatch Exam - Questions and Answers (Complete Solutions)

  • Exam (elaborations) • 40 pages • 2024
  • Available in package deal
  • PJM Generation Dispatch Exam - Questions and Answers (Complete Solutions) Which of the following statements is correct concerning PJM assuming frequency control of the restoration process? A) PJM assumes control once an external transmission tie has been established. B) Once an Area Control Error can be calculated, PJM will assume control. C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO D) Whenever the Transmission Owners within the RTO agree to let PJ...
    (0)
  • $27.49
  • + learn more
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified | Latest Update 2024 | 30 Pages
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified | Latest Update 2024 | 30 Pages

  • Exam (elaborations) • 29 pages • 2024
  • Available in package deal
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified | Latest Update 2024 | 30 Pages During System Restoration, what is the optimal Frequency Range? - Correct Answer 59.75 - 61 Hz The 500 kV system has normal bus voltages between? - Correct Answer 500 to 550 kV When Connecting 2 islands, the operator must match? - Correct Answer Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) - Correct ...
    (0)
  • $13.99
  • + learn more
PJM cert: TO final| 180 Questions With 100% Correct Answers|49 Pages
  • PJM cert: TO final| 180 Questions With 100% Correct Answers|49 Pages

  • Exam (elaborations) • 49 pages • 2024
  • Available in package deal
  • Which of the following would not be an action to take for low voltages A. Increase generator MW output B. Remove reactors from the system C. Increase generator MVAR output D. Place capacitors in service - ️️A. Increase generator MW output PJM operates it's 500 KV system so that no post contingency voltage drop will exceed what minimum value A. 1% B. 3% C. 5% D. 7% - ️️C. 5% The PJM system operator finds that a 230 KV transmission line is over its normal limit. How long do...
    (0)
  • $8.49
  • + learn more
PJM Exam Questions & Answers 2024
  • PJM Exam Questions & Answers 2024

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • PJM Exam Questions & Answers 2024 What is the threshold for having a satellite phone? - ANSWER-500 MW How often is reactive testing completed? - ANSWER-5 years Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 1) Incorrect interchange number 2) Loss of a tie-line RTU 3) Loss of internal load 4) Loss of adjacent control area generation - ANSWER-Loss of adjacent control area generation PJM should be made aware of any fuel shortage tha...
    (0)
  • $8.99
  • + learn more
PJM Transmission Exam Study Questions and Answers
  • PJM Transmission Exam Study Questions and Answers

  • Exam (elaborations) • 35 pages • 2024
  • Available in package deal
  • PJM Transmission Exam Study Questions and Answers During System Restoration, what is the optimal Frequency Range? - Correct Answer ️️ -59.75 - 61 Hz The 500 kV system has normal bus voltages between? - Correct Answer ️️ -500 to 550 kV When Connecting 2 islands, the operator must match? - Correct Answer ️️ -Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) - Correct Answer ️️ -30 MW Gen/mile of energized...
    (0)
  • $13.49
  • + learn more
PJM Sample Test Review 2024 Questions and Answers
  • PJM Sample Test Review 2024 Questions and Answers

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • PJM Sample Test Review 2024 Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - Correct Answer ️️ -off cost out of merit. Monitoring ___________ may give insights into system constraints. - Correct Answer ️️ -Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - Correct Answer ️️ -PJM calls on synchronized reserves If not cancelled by...
    (0)
  • $12.49
  • + learn more
An EXCITER on a traditional generator does what? -  correct answer  Voltage regulation (AVR) if you change the excitation current, you change the voltage.  ECO Min, ECO Max, and EMERG Max are genrator _________________. -  correct answer  Limits  When syn
  • An EXCITER on a traditional generator does what? - correct answer Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - correct answer Limits When syn

  • Exam (elaborations) • 4 pages • 2024
  • If the scheduled frequency must be adjusted for a time error correction, what would the PJM operator set the frequency schedule to for a fast clock? - correct answer 59.98 What is the PJM regulation requirement for the off-peak period? - correct answer 525 Which of the following PJM reserves are NOT synchronized? - correct answer Non-synchronized (quick-start) What is the margin in relationship to regulation requirement that is used by PJM for assigning or de-assigning regulation?...
    (0)
  • $16.49
  • + learn more
PJM Questions & Correct Answers | Latest  Update |Already Graded A+
  • PJM Questions & Correct Answers | Latest Update |Already Graded A+

  • Exam (elaborations) • 47 pages • 2024
  • During System Restoration, what is the optimal Frequency Range? : 59.75 - 61 Hz The 500 kV system has normal bus voltages between? : 500 to 550 kV When Connecting 2 islands, the operator must match? : Voltage, Phase Angle and Frequency What are the Minimum Source Requirements-(500kV+) for a 500 kV? : 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV When will PJM issue a Minimum Generation Alert? : When expected generation levels fall within 2500 MW of normal op...
    (0)
  • $13.49
  • + learn more
PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified
  • PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified

  • Exam (elaborations) • 15 pages • 2024
  • PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified | Latest Update 2024 Real time transmission constraints or contingencies may be alleviated with generators operating ______________ ANS-off cost out of merit. Monitoring ___________ may give insights into system constraints. ANS-Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. ANS-PJM calls on synchronized reserves If not cancelled by PJM, the mini...
    (0)
  • $12.99
  • + learn more