Pjm practice - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Pjm practice? On this page you'll find 68 study documents about Pjm practice.

Page 2 out of 68 results

Sort by

PJM Practice Exam 2024 Questions and Answers
  • PJM Practice Exam 2024 Questions and Answers

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • PJM Practice Exam 2024 Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of merit). - Correct Answer ️️ -off cost (out of merit) What is the minimum size for a solar park to be required to have real and reactive power telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW - Correct Answer ️️ -3 MW PJM calls for which of the following t...
    (0)
  • $12.49
  • + learn more
PJM Generation Dispatcher Exam Practice Questions and Answers
  • PJM Generation Dispatcher Exam Practice Questions and Answers

  • Exam (elaborations) • 7 pages • 2024
  • PJM Generation Dispatcher Exam Practice Questions and Answers An EXCITER on a traditional generator does what? - Correct Answer ️️ -Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - Correct Answer ️️ -Limits When synchronizing to the interconnection, what needs to be synchronized? - Correct Answer ️️ -Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedu...
    (0)
  • $11.49
  • + learn more
PJM Practice Test Q's 2 exam with complete solution
  • PJM Practice Test Q's 2 exam with complete solution

  • Exam (elaborations) • 21 pages • 2023
  • Available in package deal
  • PJM Practice Test Q's 2 exam with complete solution
    (0)
  • $7.99
  • + learn more
PJM Generation Dispatcher Exam Practice - Questions and Answers
  • PJM Generation Dispatcher Exam Practice - Questions and Answers

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • PJM Generation Dispatcher Exam Practice - Questions and Answers An EXCITER on a traditional generator does what? Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are generator _________________. Limits When synchronizing to the interconnection, what needs to be synchronized? Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedure is implemented when? 10A or greater is measured by special equipment at Mis...
    (0)
  • $13.49
  • + learn more
PJM Practice Exam 2019 Questions & Answers
  • PJM Practice Exam 2019 Questions & Answers

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • PJM Practice Exam 2019 Questions & Answers Real time transmission constraints or contingencies may be alleviated with generators operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of merit). - ANSWER-off cost (out of merit) What is the minimum size for a solar park to be required to have real and reactive power telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW - ANSWER-3 MW PJM calls for which of the following to recover the ACE so that ti...
    (0)
  • $7.99
  • + learn more
PJM Practice questions With Explanation of Answers.
  • PJM Practice questions With Explanation of Answers.

  • Exam (elaborations) • 20 pages • 2024
  • Available in package deal
  • A Heavy Load Voltage Schedule Warning is typically issued ___ prior to actual implementation. - correct answer c. 4 hours The following would be considered non-critical plant load (Select 2) - correct answer A. Office Area Air Conditioners C. Lighting During a Cold Weather Alert, PJM will take which of the actions - correct answer D. Assume an unavailability rate for schedule generation When PJM issues a High System Voltage Message, the GO should have its units operate at: - correct an...
    (0)
  • $13.99
  • + learn more
PJM Generation Dispatcher Exam Practice Questions & Answers 2024
  • PJM Generation Dispatcher Exam Practice Questions & Answers 2024

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • PJM Generation Dispatcher Exam Practice Questions & Answers 2024 An EXCITER on a traditional generator does what? - ANSWER-Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - ANSWER-Limits When synchronizing to the interconnection, what needs to be synchronized? - ANSWER-Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedure is implemented when? - ANSWER-10A or...
    (0)
  • $7.99
  • + learn more
PJM Practice Questions And Answers With Complete Study Solutions
  • PJM Practice Questions And Answers With Complete Study Solutions

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • PJM Practice Questions And Answers With Complete Study Solutions PJM Practice Questions And Answers With Complete Study Solutions
    (0)
  • $12.99
  • + learn more
PJM Practice Exam 2024 with 100% correct answers
  • PJM Practice Exam 2024 with 100% correct answers

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Real time transmission constraints or contingencies may be alleviated with generators operating________. A. below 60 Hz. B. on a new price curve. C. on a new cost curve. D. off cost (out of merit). - correct answer off cost (out of merit) What is the minimum size for a solar park to be required to have real and reactive power telemetry? A. 1 MW. B. 3 MW C. 5 MW D. 7 MW - correct answer 3 MW PJM calls for which of the following to recover the ACE so that tie line schedules are maintain...
    (0)
  • $14.49
  • + learn more