Nccer Plumbing Level 1 Exam Questions with 100% correct Answers
- Exam (elaborations) • 13 pages • 2023
-
- $10.39
- 6x sold
- + learn more
The modern word for plumber is derived from the Latin word for - ANSWER-A person who works with lead 
 
LEED applies to all areas of the profession, except - ANSWER-Renovation 
 
Water that comes from laundry and bathtubs and reused in known as - ANSWER-Graywater 
 
Suggested national plumbing standards are called - ANSWER-Model codes 
 
You are offered a job by another contractor before you have fulfilled your current obligations. The professional response is to - ANSWER-Ask the contractor to w...
-
NCIDQ IDPX Prep Exam Study Questions and Answers 2024
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
Why does the HVAC system need to be balanced at the end of a commercial project? 
 
 A. To verify that air quality levels are within the design specifications 
 B. To detect significant air leaks in the ductwork. 
 C. To adjust airflow at each device location to meet the criteria in the engineer's design 
 D. To determine that each office is receiving the amount of outside air required by the design -Answer- The correct answer is C. Balancing the HVAC system is the process of measuring air f...
-
NCIDQ IDPX Prep Exam
- Exam (elaborations) • 36 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
NCIDQ IDPX Prep Exam 
 
Why does the HVAC system need to be balanced at the end of a commercial project? 
 
A. 
To verify that air quality levels are within the design specifications 
B. 
To detect significant air leaks in ductwork 
C. 
To adjust air flow at each device location to meet the criteria in the engineer's design 
D. 
To determine that each office is receiving the amount of outside air required by the design - 
The correct answer is C. Balancing the HVAC system is the process of meas...
-
IDPX NCIDQ Prep Exam 2023 /2024 with 100% correct answers
- Exam (elaborations) • 27 pages • 2023
- Available in package deal
-
- $16.49
- + learn more
Why does the HVAC system need to be balanced at the end of a commercial project? 
 
 A. 
To verify that air quality levels are within the design specifications 
 B. 
To detect significant air leaks in ductwork 
 C. 
To adjust air flow at each device location to meet the criteria in the engineer's design 
 D. 
To determine that each office is receiving the amount of outside air required by the design - correct answer The correct answer is C. Balancing the HVAC system is the process of mea...
-
NCCER PLUMBING LEVEL 1 QUESTIONS WITH CORRECT ANSWERS ALREADY GRADED A+.
- Exam (elaborations) • 26 pages • 2024
-
- $12.49
- + learn more
NCCER PLUMBING LEVEL 1 2024 NEWEST 200 QUESTIONS AND DETAILED CORRECT HIGHLIGHTED ANSWERS ALREADY GRADED A+. Your supervisor points out that you forgot to complete a step in the assembly of a drain 
in a DWV system. One of the apprentices that you are supervising was a he person 
installing the drain. The responsible action is to - ANSWER- Take responsibility for the 
work done under your supervision 
People who develop, design, manufacture, and test mechanical devices are called - 
ANSWER- Mech...
And that's how you make extra money
-
MASTER PLUMBER PAST BOARD EXAM QUESTIONS SET 1 WITH VERIFIED ANSWERS.
- Exam (elaborations) • 24 pages • 2024
-
- $9.99
- + learn more
Of the four board subjects given for Master Plumbers examination, which of this subject was originally split into two subjects? 
 
A. Plumbing Code 
B. Design and Installations 
C. Plumbing Arithmetic 
D. Practical Problems - Answer D 
 
Copper tube and fittings used for drainage and vent piping installed aboveground shall be at least ____. 
 
A. Type DWV 
B. Type L 
C. Type K 
D. Type M - Answer A 
 
A domestic dishwasher drain shall first connect to ____. 
 
A. an approved airgap fittin...
-
ARE CE Tests with Complete Solutions | Latest Updated Graded A+
- Exam (elaborations) • 37 pages • 2024
- Available in package deal
-
- $9.49
- + learn more
ARE CE Tests with Complete Solutions | Latest Updated Graded A+ 
Parts of a weld - Leg 
Throat 
Face 
If hazardous waste discovered during construction who pays? IE underground storage tank - Contractor pays and Owner reimburses 
-A201 states owner is responsible for remediation of hazardous materials at project site 
who has discretion to decided whether or not construction meets design intent? - architect 
Costs to repair or correct work due to a design defect are payable by - the architect's...
-
NYC high pressure boiler license Exam Questions and Correct Answers 100%
- Exam (elaborations) • 23 pages • 2024
-
- $15.49
- + learn more
NYC high pressure boiler license Exam 
Questions and Correct Answers 100% 
The minimum blowdown for a spring loaded safety valve shall be of what percent of set 
pressure? - CORRECT ANSWER-10% 
How is the main steam pressure gages tested? - CORRECT ANSWER-With an 
inspectors gage 
Who is in charge of the code for any plumbing installations? - CORRECT ANSWER-The 
nyc plumbing code 
When will anchorage or guides be inspected? - CORRECT ANSWER-Annually 
How many brass washout plugs does a minia...
-
High Pressure Steam Exam Nyc Boiler License Exam With Verified Answers
- Exam (elaborations) • 20 pages • 2024
-
- $15.49
- + learn more
High Pressure Steam Exam Nyc Boiler 
License Exam With Verified Answers 
1 The maximum blow down for a safety valve on a forced flow steam generator or high 
temperature water boiler shall be of what percent of the set pressure? - CORRECT 
ANSWER-10%. HP Code: 14-9.12 
3 Who oversees the code for any plumbing installations? - CORRECT ANSWER-The 
NYC Plumbing Code NYC Mech: 1002.1 
4 When will anchorage or guides be inspected? - CORRECT ANSWER-Annually. NYC 
Mech: 1210.3.1.2 
5 How many bras...
-
NCIDQ IDPX Prep Exam
- Exam (elaborations) • 18 pages • 2023
- Available in package deal
-
- $12.49
- + learn more
Why does the HVAC system need to be balanced at the end of a commercial project? 
 
 A. 
To verify that air quality levels are within the design specifications 
 B. 
To detect significant air leaks in ductwork 
 C. 
To adjust air flow at each device location to meet the criteria in the engineer's design 
 D. 
To determine that each office is receiving the amount of outside air required by the design - Answer- The correct answer is C. Balancing the HVAC system is the process of measuring ai...