Voltage drop limits - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Voltage drop limits? On this page you'll find 152 study documents about Voltage drop limits.
Page 2 out of 152 results
Sort by
-
NERC PREP TEST 101 Questions With Correct Answers
- Exam (elaborations) • 57 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - Answer a. Generator MVAR output would increase 
 
2. When system conditions are such that emergency procedures are expected to be implemented, which of ...
-
Practice Test NERC Questions and Correct Answers (GRADED A+)
- Exam (elaborations) • 48 pages • 2023
- Available in package deal
-
- $11.99
- + learn more
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? 
The phase angle will increase. When load is increased phase angle will increase. 
 
 
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? 
90 pf= mw/mva 
 
 
The high side of a delta-wye connection transformer is connected to a power s...
-
NERC Practice Test Questions With Verified Answers
- Exam (elaborations) • 24 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? - Answer The phase angle will increase. When load is increased phase angle will increase. 
 
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? - Answer 90 pf= mw/mva 
 
The high side of a delta-wye connection transformer is connected ...
-
SOS NERC RELIABILITY EXAM QUESTIONS WITH ANSWERS LATEST 2023-2024
- Exam (elaborations) • 69 pages • 2023
- Available in package deal
-
- $16.49
- + learn more
Metered Data included in the calculation of ACE are: dynamic schedules, pseudo 
ties, actual frequency, and all __________. 
A) Tie lines readings 
B) Generators output 
C) Scheduled frequency indications 
SOS NERC RELIABILITY EXAM QUESTIONS & 
ANSWERS LATEST GRADED A+ 
D) Transformer load - A) Tie lines readings 
Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net 
Actual Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If 
Balancing Authority...
-
Practice Test NERC Questions And Answers 2024
- Exam (elaborations) • 26 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
Practice Test NERC Questions And Answers 2024 
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending 
Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle 
difference will be? - ANSWER-The phase angle will increase. When load is increased phase angle will 
increase. 
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? - ANSWER90 pf= mw/mva 
The high side of...
Want to regain your expenses?
-
ACET study guide Exam 174 Questions with Verified Answers,100% CORRECT
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
ACET study guide Exam 174 Questions with Verified Answers 
 
Binary is in vaules of? - CORRECT ANSWER 1 , 2, 4, 8...... so on incressed by *2 each following 
 
Octal place vaules? - CORRECT ANSWER 0-7 each digit holds a place vaule of 3 binargy digits 
 
Hex - CORRECT ANSWER 0-9 followed by A-F. A=10 
each digit holds 4 in binary 
 
Binary divide by rule - CORRECT ANSWER When you divide, no remainder =0, remainder =1 
Don't carry foward the remainder. 
Revese the reminders when translating to ...
-
SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A
- Exam (elaborations) • 109 pages • 2023
- Available in package deal
-
- $11.99
- + learn more
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
 
A) Increase Net Interchange Schedule by 20 MWs. 
 
B) Inform the Reliability Coordinator that you cannot participate in the time error correction. 
 
C) Decrease Net Interchange Schedule by 20 MWs. 
 
D) Increase Net Interchange Sche...
-
NERC RELIABILITY EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATED 2024 (GRADED A+)
- Exam (elaborations) • 69 pages • 2024
-
- $17.49
- + learn more
NERC RELIABILITY EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATED 2024 (GRADED A+) The Reliability Coordinator just informed you of a slow time error correction 
which will begin at the top of the next hour. Your EMS system will not let you 
change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. 
What action should you take? 
A) Increase Net Interchange Schedule by 20 MWs. 
B) Inform the Reliability Coordinator that you cannot participate in the time error 
correction. 
...
-
NERC SOS quiz Questions and Answers (Already GRADED A)
- Exam (elaborations) • 60 pages • 2023
- Available in package deal
-
- $11.49
- + learn more
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? 
Regulation of other services related to control performance 
 
 
1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection 
Burden 
 
 
A Balancing Authority is performing Overlap Regul...
-
Test Bank For Computerized Engine Controls 10th Edition by Steve V. Hatch
- Exam (elaborations) • 66 pages • 2023
-
- $34.43
- + learn more
Name Clas Dat : s: e: 
Chapter 3 
Common Components for Computerized Engine Control Systems 
 1. What type of sensor is a throttle position sensor? 
a. 
c. 
ANSWER: POINTS: 
Potentiometer Piezoelectric diaphragm 
b. NTC thermistor 
d. Piezoresistive diaphragm 
2. What voltage will be produced by a zirconium dioxide O2 sensor when the air-fuel ratio is on the rich side of stoichiometric? 
ANSWER: POINTS: 
d 1 
b 1 
c 1 
a. 0 mV 
c. 450 mV 
b. 100 mV to 450 mV d. 450 mV to 900 mV 
3. What scale ...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia