When does the cgp apply Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about When does the cgp apply? On this page you'll find 35 study documents about When does the cgp apply.
Page 2 out of 35 results
Sort by
-
CPESC Section 1 & 2 Q&A 2023
- Exam (elaborations) • 7 pages • 2023
-
- $11.99
- + learn more
What does the acronym NPDES stand for? - Answer- National Pollutant Discharge Elimination System 
 
True / False: The NPDES requirements apply only to discharges of storm-water either directly or through a municipal separate storm drain system, to waters of the US. - Answer- 2.1.1.6 
True 
 
What does the acronym TMDL stand for? Define it? - Answer- 2.1.1.10 
Total Maximum Daily Load. The amount of a particular pollutant that a water body can assimilate on a daily basis without violating appli...
-
QSP Exam Questions with 100% Correct Answers | Verified | Updated 2024
- Exam (elaborations) • 18 pages • 2024
-
- $12.99
- + learn more
QSP Exam Questions with 100% Correct Answers | Verified | Updated 2024
-
QSP EXAM LATEST UPDATE
- Exam (elaborations) • 15 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
QSP EXAM LATEST UPDATE...
-
QSP ACTUAL EXAM WITH QUESTIONS AND WELL VERIFIED ANSWERS [ALREADY GRADED A+] REAL EXAM!! REAL EXAM!!!
- Exam (elaborations) • 15 pages • 2024
-
- $18.49
- + learn more
QSP ACTUAL EXAM WITH QUESTIONS AND WELL 
VERIFIED ANSWERS [ALREADY GRADED A+] REAL 
EXAM!! REAL EXAM!!! 
TRUE OR FALSE: if construction of an LUP will occur across several properties, 
the utility company, municipality, or other public/private company/agency that 
owns or operates the LUP project is responsible for obtaining coverage - 
ANS--True 
When does the CGP apply? - ANS--Any construction or demolition of 
one acre or more 
Activities under the CGP include: 
a. Routine maintenance t...
-
QSP Exam 2023 with 100% correct answers
- Exam (elaborations) • 11 pages • 2023
-
- $16.49
- + learn more
When does the CGP apply? 
Any construction or demolition of one acre or more 
 
 
 
Activities under the CGP include: 
a. Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility. 
b. Disturbances to land surfaces solely related to agricultural operations. 
c. Clearing and grading 2 acres of land 
d. Discharges of storm water from areas on tribal lands. 
C 
 
 
 
TRUE OR FALSE: if construction of an LUP will occur across several properties,...
As you read this, a fellow student has made another $4.70
-
CPESC Section 1 & 2 Questions With Complete Solutions
- Exam (elaborations) • 12 pages • 2023
- Available in package deal
-
- $10.49
- + learn more
What does the acronym NPDES stand for? correct answer: National Pollutant Discharge Elimination System 
 
True / False: The NPDES requirements apply only to discharges of storm-water either directly or through a municipal separate storm drain system, to waters of the US. correct answer: 2.1.1.6 
True 
 
What does the acronym TMDL stand for? Define it? correct answer: 2.1.1.10 
Total Maximum Daily Load. The amount of a particular pollutant that a water body can assimilate on a daily basis wi...
-
QSP Exam Questions with Correct Answers
- Exam (elaborations) • 11 pages • 2024
-
- $9.99
- + learn more
QSP Exam Questions with Correct Answers 
When does the CGP apply? - -Any construction or demolition of one acre or more 
Activities under the CGP include: 
a. Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose 
of the facility. 
b. Disturbances to land surfaces solely related to agricultural operations. 
c. Clearing and grading 2 acres of land 
d. Discharges of storm water from areas on tribal lands. - -C 
TRUE OR FALSE: if construction of an LUP wil...
-
CPESC Section 1 & 2 Exam Questions With 100% Verified Answers
- Exam (elaborations) • 8 pages • 2024
-
- $11.49
- + learn more
CPESC Section 1 & 2 Exam Questions With 
100% Verified Answers 
What does the acronym NPDES stand for? - answerNational Pollutant Discharge Elimination 
System 
True / False: The NPDES requirements apply only to discharges of storm-water either directly or 
through a municipal separate storm drain system, to waters of the US. - answer2.1.1.6 
True 
What does the acronym TMDL stand for? Define it? - answer2.1.1.10 
Total Maximum Daily Load. The amount of a particular pollutant that a water body c...
-
QSP ACTUAL EXAM WELL ELABORATED QUESTIONS AND DETAILED ANSWERS 2O24
- Exam (elaborations) • 11 pages • 2024
-
- $25.99
- + learn more
QSP ACTUAL EXAM WELL ELABORATED QUESTIONS AND DETAILED 
ANSWERS 2O24 UPDATE ALREADY A GRADE. 
When does the CGP apply? 
Any construction or demolition of one acre or more 
Activities under the CGP include: 
a. Routine maintenance to maintain original line and grade, hydraulic capacity, or 
original purpose of the facility. 
b. Disturbances to land surfaces solely related to agricultural operations. 
c. Clearing and grading 2 acres of land 
d. Discharges of storm water from areas on tribal land...
-
QSP 2024 LATEST UPDATED EXAM CORRECTLY ANSWERED QUESTIONS 100% GUARANTEED PASS.
- Exam (elaborations) • 11 pages • 2024
-
- $25.99
- + learn more
QSP 2024 LATEST UPDATED EXAM CORRECTLY ANSWERED 
QUESTIONS 100% GUARANTEED PASS. 
A storm that produces ½ inch or more of precipitation, with a 48 hour or greater 
period between rain events is a/an... 
a. Qualifying rain event 
b. Extended storm event 
c. Inactive storm event 
d. Unsafe monitoring event 
A 
Upload photos to SMARTS that are taken during daily inspections of the LUP site 
before, during, and after every ___ storm event 
a. First 
b. Second 
c. Third 
d. Fourth 
C 
Which state...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia