Yellow belt stuvia 2024 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Yellow belt stuvia 2024? On this page you'll find 25 study documents about Yellow belt stuvia 2024.
Page 2 out of 25 results
Sort by
-
Lean Six Sigma Yellow Belt Questions & Answers 100% Correct
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
Solutions are implemented in which stage of DMAIC? - ANSWERImprove and Control 
 
What does DMAIC stand for? - ANSWERDefine, Measure, Analyze, Improve, Control 
 
pareto chart - ANSWERcategorical x vs categorical y 
 
run chart - ANSWERcontinuous y vs time 
 
boxplot - ANSWERcontinuous y vs categorical x 
 
scatter plot - ANSWERcontinuous y vs continuous x 
 
what information does a dotplot provide? - ANSWERthe spread of the data 
 
spaghetti diagrams - ANSWERvisual representation of the work un...
-
judo yellow belt Correct 100%
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
hiza guruma - ANSWERknee wheel throw 
 
o goshi - ANSWERmajor hip throw 
 
kesa gatame - ANSWERscarf hold 
 
shizen hentai - ANSWERbasic natural posture 
 
ippon seio nage - ANSWERshoulder throw 
 
morote seio nage - ANSWERshoulder throw (lapel hand low) 
 
yoko shio gamtame - ANSWERside hold 
 
who was the founder of judo - ANSWERjigoro kano 
 
what was the name of the school he founded? - ANSWERthe kodokan 
 
what is the date of the founding of judo? - ANSWER1882 
 
what was unarmed combat cal...
-
Yellow Belt Study Guide Questions & Answer(RATED A+)
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
Quality Function Deployment (QFD) (p.157) - ANSWERDescribes a method for translating customer requirements into functional design. 
QFD involves developing a matrix that includes customer preferences and engineering product attributes. A QFD matrix allows a firm to analyze quantitatively the relationship between customer needs and design attributes. 
 
FMEA (p.171) - ANSWERsystematically considers each component of a system—identifying, analyzing, and documenting the possible failure modes wit...
-
Lean Six Sigma Yellow Belt Questions & Answers (RATED A)
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
Features that set SS apart from previous quality improvement initiatives include - ANSWERa clear focus on achieving measurable and quantifiable financial returns 
 
Six sigma is a - ANSWERdata driven, problem solving methodology 
 
Jane, a Black Belt, is in the process of finding reasons for embarking on an improvement project. She is checking if the improvement project is linked to the company's key success factors and objectives. She also is looking into which key process output measure(s) wi...
-
IASSC Certified Lean Six Sigma Yellow Belt (ICYB) Practice Exam Questions & Answers(GRADED A+)
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
Which is a purpose and use of data visualization? - ANSWERAllows conclusions to be drawn from graphical data analysis 
 
Which of the following are examples of continuous data? 
1. Number of features 
2. Size in centimeters 
3. Weight in kilograms 
4. Pressure per square centimeter - ANSWER2, 3, 4 
 
What is 'Little's' formula for calculating Average Lead Time? - ANSWERNumber of units required, divided by production capacity 
 
All of the following are benefits of control plans except? - ANSW...
Too much month left at the end of the money?
-
SSGI Yellow Belt Group 1 Questions 100% Solved!!
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
Motorola - ANSWERThe company most associated with the development and early implementation of Six Sigma 
 
Jack Welch at General Electric - ANSWERThe most notable salesperson who introduced and popularized Six Sigma to major corporations. 
 
Automotive - ANSWERThe history of Six Sigma can be traced to this industry. 
 
Black Belt - ANSWERThe highest level of certification in Six Sigma 
 
Green Belt - ANSWERThe Six Sigma Belt that is positioned above the Yellow Belt. 
 
Black Belt - ANSWERThe Six...
-
Lean Six Sigma Yellow Belt Accurate 100%
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
What percent of problems can be solved using the four tools in yellow belt? - ANSWER80% 
 
Lean six sigma Green belt is worth how many industrial Credential Points? - ANSWER6 
 
A student needs ______ points to graduate - ANSWER12 
 
what are the 3 types of work - ANSWERDaily work, Improvement work, Strategic work 
 
__% of all work is Non-value added - ANSWER65 
 
What does DMAIC stand for? - ANSWERDefine, Measure, Analyze, Improve, Control 
 
The Project purpose, Organizational Impact, and the...
-
Lean Six Sigma: Yellow Belt Accurate 100%
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
DOWNTIME - ANSWERDefects 
Overproduction 
Waiting 
Non-Utilized Talent 
Transportation 
Inventory 
Motion 
Extra-Processing 
 
Defects - ANSWERinformation, products, and services that are inaccurate and/or incomplete. Ex: 
-errors that occur over and over 
-customer dissatisfaction in a process 
-fixing paperwork that is not completely filled in or tracking down the right person to get the information 
-entry errors that cause the wrong actions, like shipping too many or too few to the wrong add...
-
Lean Six Sigma Yellow Belt Quizzes &Answers(RATED A+)
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
End of process outcome measures (Qs) should be identified from and linked to: - ANSWERCritical customer requirements 
 
In-process measures (Ps) should be "drivers" and predictors of: - ANSWEREnd-of-process outcomes measures (Qs) 
 
Three (3) key elements necessary for managing a process include a flow chart or procedure, outcome measures, and in-process measures: True or false - ANSWERTrue 
 
In-process P measures enable us to proactively control the Q, or outcome measures: True or false - AN...
-
Lean Six Sigma Yellow Belt Accurate 100%
- Exam (elaborations) • 1 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
Process Mapping - ANSWERthe mapping of specific activities required to provide a specific service to the patient. Also referred to as Value Stream Mapping. 
 
Waste - TIMWOOD - ANSWERAny expenditure of time, money, or resources that does not add value. 
 
(T)imwood - ANSWERTransportation - orders being taken to kitchen for processing 
 
t(I)mwood - ANSWERInventory - month's worth of meat in freezer that expires in 1 week 
 
ti(M)wood - ANSWERMotion - waiter at restaurant walking to your table 
...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia