2025 nccco 2 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about 2025 nccco 2? On this page you'll find 64 study documents about 2025 nccco 2.
Page 3 out of 64 results
Sort by
-
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct) Splices in rall tracks shall have - ANSWER Smooth Joints 
Hydraulic systems should have their proper fluid level checked - ANSWER Daily 
If power fails during operations, the following shouldn't apply - ANSWER Do your best to 
finish moving load where it was designated to go 
If load is undetermined who is to find out if load weight does not exceed crane rating at radius 
at which the load is to be lifted - ANSW...
-
NCCCO CORE | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
NCCCO CORE | Questions and Correct 
Solutions | Latest Update 
2024/2025 | Graded A+ 
Before leveling a mobile crane on outriggers, an operator should 
ensure: - Answer -there is no weight of the crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what 
support condition should be considered? - Answer -Keeping 90 degree 
angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom 
point sheave? - Answer -Separate the...
-
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT) Operating a mobile crane with a long boom, on uneven ground, what support condition 
should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER 
Separate the boom hoist lines 
How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, 
before it should be removed from...
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT) When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% correct answers a. 
3. The load line of the crane you're operating contacts an energized power line. There's no sign of 
any other danger, such as fire. What should you do? 
a. Climb down carefully from the crane cab 
b. Jump down, feet...
-
NCCCO Questions Test 1 with Complete Solutions 100% Verified 2024/2025
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
NCCCO Questions Test 1 with Complete Solutions 100% Verified 2024/2025 
 Where is the best location for leveling a crane? - Correct Answer Upperworks 
 
When determining the "gross load" the best method is: - Correct Answer Get an accurate load weight and add the rigging. 
 
By order of hitch strength, which is the correct answer? - Correct Answer Basket, vertical, choker 
 
What is the purpose of using a jib? - Correct Answer Increase height 
 
When taking a side strain on a boom, what concer...
Make study stress less painful
-
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct) Hydraulic systems should have their proper fluid level checked - ANSWER Daily 
If power fails during operations, the following shouldn't apply - ANSWER Do your best to 
finish moving load where it was designated to go 
If load is undetermined who is to find out if load weight does not exceed crane rating at radius 
at which the load is to be lifted - ANSWER Person responsible for lift 
Where should climbing inst...
-
NCCCO Questions with Correct Answers 100% Verified/ Complete 2024/2025
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
NCCCO Questions with Correct Answers 100% Verified/ Complete 2024/2025 
Where is the best location for leveling a crane? - Correct Answers Upperworks 
 
When determining the Agross load@ the best method is: - Correct Answers Get an accurate load weight and add the rigging. 
 
By order of hitch strength, which is the correct answer? - Correct Answers Basket, vertical, choker 
 
1. What is the purpose of using a Jib? - Correct Answers 1. Increase height 
 
1. When taking a side strain on a boom, w...
-
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT) Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER there is 
no weight of the crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what support condition 
should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER 
Separate the boom h...
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT) What action does a signal person intend the operator to perform if he extends his arm at 
shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom correct answers c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8%...
-
NCCCO Lattice Boom General Knowledge exam | Questions and Verified Solutions | Latest Update 2024/2025 | Graded A+
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
NCCCO Lattice Boom General 
Knowledge exam | Questions and 
Verified Solutions | Latest Update 
2024/2025 | Graded A+ 
The lattice boom is designed to take winds of up to 20 mph. from the 
side plus a full rated load, plus a direct side load equal to what percent 
of the rated load? - Answer -2% 
The part of the load chart governed by stability is based on what 
percentage of capacity while a crawler crane is working over the side 
quadrant? - Answer -A. 75% 
The most unstable working quadrant f...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia