Bmps swppp - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Bmps swppp? On this page you'll find 44 study documents about Bmps swppp.

Page 3 out of 44 results

Sort by

Cesswi Exam (Questions and Answers)
  • Cesswi Exam (Questions and Answers)

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Certified erosion sediment and stormwater inspector - Answer-CESSWI Offers no mitigation - Answer-Ignorance Controls water pollution by regulating point sources that discharge pollutants into waters of the US - Answer-NPDES National pollutant discharge elimination system MS4 - Answer-Municipal Separate Storm Sewer System ESCP - Answer-Erosion and sediment control plan Has regulatory authority over the cwa - Answer-EPA Return flow from irrigated agriculture or their run off - Answer-Does n...
    (0)
  • $7.99
  • + learn more
CESSWI Certification - PART 1 Questions and Answers 2023
  • CESSWI Certification - PART 1 Questions and Answers 2023

  • Exam (elaborations) • 29 pages • 2023
  • Available in package deal
  • CESSWI Certification - PART 1 Questions and Answers 2023 CESSWI Certification Identifies Professional with a comprehensive knowledge and understanding of erosion, sediment and stormwater regulations. Certified inspectors Recognized by state and federal regulators as qualified professionals in their fields NPDES National Pollutant Discharge Elimination System Regulations Governing Erosion and Sediment Control and Stormwater The Clean Water Act (CWA) National Pollutant D...
    (0)
  • $19.99
  • + learn more
Cesswi 2 Questions with correct Answers, Graded A+
  • Cesswi 2 Questions with correct Answers, Graded A+

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • Cesswi 2 Questions with correct Answers, Graded A+ Temporary stabilization stone or plastic as a BMP to reduce erosion by stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 5 types of plans 1. SWPPP 2. erosion and sed. plan (ESCP) 3. drainage plan/grading plan 4. spill prevention control and countermeasure plan (SPCC) 5. MS4 stormwater management plan/program (SWMP) SWPPP -required by NPDES for industrial, multi sector, and cons...
    (0)
  • $18.49
  • + learn more
CESSWI PART I QUESTIONS AND ANSWERS GUARANTEED A+
  • CESSWI PART I QUESTIONS AND ANSWERS GUARANTEED A+

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • CESSWI PART I QUESTIONS AND ANSWERS GUARANTEED A+ CESSWI is qualified to preform what inspections? Construction, post construction, industrial, MS4 Clean Water Act year of creation and intent of law 1972, enacted to restore and maintain the physical, bio, chem integrity of the waters of the US Brainpower Read More Previous Play Next Rewind 10 seconds Move forward 10 seconds Unmute 0:07 / 0:15 Full screen CWA Section 402 Est. NPDES System, originally focused on ind...
    (0)
  • $17.99
  • + learn more
QSP Exam questions with complete solution
  • QSP Exam questions with complete solution

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • QSP Exam questions with complete solution When does the CGP apply? - Correct Answers-Any construction or demolition of one acre or more Activities under the CGP include: a. Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility. b. Disturbances to land surfaces solely related to agricultural operations. c. Clearing and grading 2 acres of land d. Discharges of storm water from areas on tribal lands. - Correct Answers-C TRUE OR ...
    (0)
  • $12.99
  • + learn more
CESSWI Part 2 Questions with solutions 2023
  • CESSWI Part 2 Questions with solutions 2023

  • Exam (elaborations) • 27 pages • 2023
  • Available in package deal
  • CESSWI Part 2 Questions with solutions 2023 Existing Veg, Desc/Purp temp or perm bmp desi to stab soil and remove sups part from sheet flow runoff. Existing Veg, Objectives 1) Site Plan and Mang 2) Erosi Cont 3) Sedi Cont 4) Post-Cons Mang Existing Veg, applic 1) Areas within site where no const activity is occur 2) Areas where local, state and fed govt require preservation 3) Areas where existing veg can be utilized for eros, sedi, and storm water quality. Existing...
    (0)
  • $18.49
  • + learn more
Cesswi 2 Study Questions With Complete Solutions
  • Cesswi 2 Study Questions With Complete Solutions

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • Temporary stabilization correct answer: stone or plastic as a BMP to reduce erosion by stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 5 types of plans correct answer: 1. SWPPP 2. erosion and sed. plan (ESCP) 3. drainage plan/grading plan 4. spill prevention control and countermeasure plan (SPCC) 5. MS4 stormwater management plan/program (SWMP) SWPPP correct answer: -required by NPDES for industrial, multi sector, and construction gen...
    (0)
  • $10.49
  • + learn more
CESSWI, Part 1 Questions and Answers Latest Updated 2024
  • CESSWI, Part 1 Questions and Answers Latest Updated 2024

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • CESSWI, Part 1 Questions and Answers Latest Updated 2024 Water Quality Standards State or tribal requirements that define the water quality goals of a water body by designating the beneficial uses and setting criteria to protect those uses CWA Section 401 Regulates water quality impacts and state certification programs. Required for any permit or license issues by a federal agency for any activity that may result in a discharge to waters of the U.S. CWA Section 402 Establishe...
    (0)
  • $15.99
  • + learn more
QSP ACTUAL EXAM WITH QUESTIONS AND WELL  VERIFIED ANSWERS [ALREADY GRADED A+] REAL  EXAM!! REAL EXAM!!!
  • QSP ACTUAL EXAM WITH QUESTIONS AND WELL VERIFIED ANSWERS [ALREADY GRADED A+] REAL EXAM!! REAL EXAM!!!

  • Exam (elaborations) • 15 pages • 2024
  • QSP ACTUAL EXAM WITH QUESTIONS AND WELL VERIFIED ANSWERS [ALREADY GRADED A+] REAL EXAM!! REAL EXAM!!! TRUE OR FALSE: if construction of an LUP will occur across several properties, the utility company, municipality, or other public/private company/agency that owns or operates the LUP project is responsible for obtaining coverage - ANS--True When does the CGP apply? - ANS--Any construction or demolition of one acre or more Activities under the CGP include: a. Routine maintenance t...
    (0)
  • $18.49
  • + learn more
WM Inspector OTHER Questions With 100% Correct Answers.
  • WM Inspector OTHER Questions With 100% Correct Answers.

  • Exam (elaborations) • 5 pages • 2024
  • Activities exempt from CBPA (p.7) - Answer--permitted surface or deep mining, oil and gase operations -clearing of lands for agriculture, forestry, etc. -single family residential less than 1 acre (w/ exceptions) -discharges to sanitary sewer or combined sewer system -activities to turn abandon properties into agricultural -routine maintenance, etc. -land-disturbing activities in response to public emergency Construction GP Operator meets either of these two criteria (p.8) - Answer-1. Di...
    (0)
  • $7.99
  • + learn more