Cmgt 410 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cmgt 410? On this page you'll find 65 study documents about Cmgt 410.

Page 3 out of 65 results

Sort by

CMGT 410 - WEEK 5 - Apply: Post-Test EXAM
  • CMGT 410 - WEEK 5 - Apply: Post-Test EXAM

  • Exam (elaborations) • 38 pages • 2024
  • . All of the following are included in an Agile project charter, except for which one? a) Detailed project scope b) Expected ROI c) Signature and date d) Project goals and objectives: a) Detailed project scope 2. Agile team members have identified a risk in a project and are not able to resolve it due to lack of expertise. You, as a Agile project manager, decided to contract with a third party for resolving the risk. Which of the following risk response strategies have you applied? a) Accept b) ...
    (0)
  • $12.00
  • + learn more
CMGT 410 Midterm #2 100% Correct!!
  • CMGT 410 Midterm #2 100% Correct!!

  • Exam (elaborations) • 2 pages • 2024
  • Soldier Pile Walls are very strong and so they never require tiebacks - ANSWERFalse Soil nails are typically mechanically tensioned. - ANSWERFalse Helical, or mechanical, tieback anchors are usually the most economical retaining wall tieback. - ANSWERFalse Ground freezing is an effective way of cutting off water. - ANSWERTrue Triple fluid jet grouting systems use air and water to erode the soil and yield a higher quality of soil-cement mix. - ANSWERTrue Thru-point / tie-point conn...
    (0)
  • $10.99
  • + learn more
CMGT 410: Temp Structures Mid Term Questions & Answers 100% Correct!
  • CMGT 410: Temp Structures Mid Term Questions & Answers 100% Correct!

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • True - ANSWERTemporary structures are generally considered means and methods and so the engineer of record is almost always responsible for the design of the temporary structure. True - ANSWERIf Federal OSHA regulations and State OSHA regulations are inconsistent with each other, you can choose to follow whichever one is most convenient for your project. False - ANSWERAll parts of a temporary structure must be removed at the end of a project. True - ANSWERWhen it comes to installing tem...
    (0)
  • $15.49
  • + learn more
CMGT 410: Temp Structures Mid Term Questions & Answers 100% Correct!
  • CMGT 410: Temp Structures Mid Term Questions & Answers 100% Correct!

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • True - ANSWERTemporary structures are generally considered means and methods and so the engineer of record is almost always responsible for the design of the temporary structure. True - ANSWERIf Federal OSHA regulations and State OSHA regulations are inconsistent with each other, you can choose to follow whichever one is most convenient for your project. False - ANSWERAll parts of a temporary structure must be removed at the end of a project. True - ANSWERWhen it comes to installing tem...
    (0)
  • $14.99
  • + learn more
CMGT 410 - WEEK 5 - Apply: Post-Test EXAM 100+ QUESTIONS AND COMPLETE SOLUTIONS 2023.
  • CMGT 410 - WEEK 5 - Apply: Post-Test EXAM 100+ QUESTIONS AND COMPLETE SOLUTIONS 2023.

  • Exam (elaborations) • 41 pages • 2024
  • CMGT 410 - WEEK 5 - Apply: Post-Test EXAM 100+ QUESTIONS AND COMPLETE SOLUTIONS 2023. CMGT 410 - Wk 5 - Apply: Post-Test 1. All of the following are included in an Agile project charter, except for which one? a) Detailed project scope b) Expected ROI c) Signature and date d) Project goals and objectives: a) Detailed project scope 2. Agile team members have identified a risk in a project and are not able to resolve it due to lack of expertise. You, as a Agile project manager, decided to contract ...
    (0)
  • $12.00
  • + learn more
CMGT 410 Exams Questions & Answers 100% Correct!!
  • CMGT 410 Exams Questions & Answers 100% Correct!!

  • Exam (elaborations) • 2 pages • 2024
  • Scrum - ANSWERA framework within which people can address complex adaptive problems, while productively and creatively delivering products of the highest possible value. Agile - ANSWERThe ability to adapt and change directions as needed. Self-organization model - ANSWERA model that optimizes the flexibility of decision making and the courage to be creative Product Owner - ANSWERA Scrum team member whose main job is to maximize the value of the product and the value of the work of the de...
    (0)
  • $10.99
  • + learn more
CMGT 4100 Final Exam Questions and Answers 100% Verified
  • CMGT 4100 Final Exam Questions and Answers 100% Verified

  • Exam (elaborations) • 1 pages • 2024
  • CMGT 4100 Final Exam Questions and Answers 100% Verified advantages of bar charts ( - CORRECT ANSWER-simple to prepare) (simple to read) • Crert how many durations - CORRECT ANSWER-one
    (0)
  • $12.49
  • + learn more
CMGT 4100 Test 1 Questions & Answers(RATED A+)
  • CMGT 4100 Test 1 Questions & Answers(RATED A+)

  • Exam (elaborations) • 4 pages • 2024
  • What info is addressed in the planning and scheduling process? - ANSWER-Planning- "what" is going to be done, "how", "where", and by "whom" -Scheduling- determining time needed to complete a project Who developed the bar chart - ANSWERHenry Gantt Is A-O-A (or ADM) a version of CPM scheduling? - ANSWERYes What is the difference in determinist and probabilistic durations? Which does A-O-A use? Which does PERT use? - ANSWER-Deterministic schedules - specific durations dates, and t...
    (0)
  • $11.99
  • + learn more
CMGT 4100- Test 1 - Ch: 1,2,3,4,5 Questions & Answers 100% Correct
  • CMGT 4100- Test 1 - Ch: 1,2,3,4,5 Questions & Answers 100% Correct

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • What is a project? - ANSWERA temporary endeavor undertaken to create a unique product, service, or result Every project has: - ANSWER- A start and finish point -A deliverable Project Planning: - ANSWERthe process of choosing the one method and order of work to be adopted for a project from all the various ways and sequences in which it could be done." Project planning elements include: - ANSWERscope, design and alternate designs, cost, time, finance, land, procurement, operations, e...
    (0)
  • $14.99
  • + learn more
CMGT 410: Temp Structures Mid Term Questions & Answers 100% Correct!!
  • CMGT 410: Temp Structures Mid Term Questions & Answers 100% Correct!!

  • Exam (elaborations) • 3 pages • 2024
  • True - ANSWERTemporary structures are generally considered means and methods and so the engineer of record is almost always responsible for the design of the temporary structure. True - ANSWERIf Federal OSHA regulations and State OSHA regulations are inconsistent with each other, you can choose to follow whichever one is most convenient for your project. False - ANSWERAll parts of a temporary structure must be removed at the end of a project. True - ANSWERWhen it comes to installing tem...
    (0)
  • $10.99
  • + learn more