Cosc 275 exam 2 palmer Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cosc 275 exam 2 palmer? On this page you'll find 31 study documents about Cosc 275 exam 2 palmer.

Page 3 out of 31 results

Sort by

COSC 275 Exam 2 (Palmer) Questions and answers rated A+ 2024/2025
  • COSC 275 Exam 2 (Palmer) Questions and answers rated A+ 2024/2025

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 (Palmer) Questions and answers rated A+ 2024/2025
    (0)
  • $11.49
  • + learn more
COSC 275 Final Exam Palmer | Latest Version | 2024/2025 | Rated A+
  • COSC 275 Final Exam Palmer | Latest Version | 2024/2025 | Rated A+

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • COSC 275 Final Exam Palmer | Latest Version | 2024/2025 | Rated A+ (Finish x Thickness)/27 CY of Concrete 20/80 rule 80% of time is used for 20% of take-off 30 amps with 2 breakers ex. 30/2 43,560 1 acre of land = ? SF Active soil Soil that swells when it comes in contact with water. Addendum A document describing an addition, change, correction, or modification to contract documents. An addendum is issued by the design professional during the bidding period or prior to the ...
    (0)
  • $10.27
  • + learn more
COSC 275 Exam 2 (Palmer) Study Guide with Complete Solutions
  • COSC 275 Exam 2 (Palmer) Study Guide with Complete Solutions

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 (Palmer) Study Guide with Complete Solutions Hard bid low price - Answer️️ -Owner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals - Answer️️ -Involves criteria other than price when awarding contract Weight given to each criteria that will be considered Construction Manager at Risk CMAR - Answer️️ -Construction manager hired in design phase to assist designer in constructibility. Also gives the owner a go...
    (0)
  • $9.99
  • + learn more
COSC 275 Exam 2 Palmer Study Guide with Complete Solutions
  • COSC 275 Exam 2 Palmer Study Guide with Complete Solutions

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • COSC 275 Exam 2 Palmer Study Guide with Complete Solutions Measures - Answer️️ -1" = 25.40 milimeters 1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 1 kg = 2.2046 lbs Geometric Formula: Circle - Answer️️ -Circumference =2r*pi Area = pi*r^2 Geometric Formula: Triangle - Answer️️ -Area: B*1/2H Masterformat 2004: 00 - Answer️️ -Procurement and Contracting Requirements Masterformat 2004: 01 - Answer️️ -General Requirements Masterformat 2004: 02 - Answer️️ -Ex...
    (0)
  • $9.99
  • + learn more
COSC 275 Exam 2 WOD & Study  Materials- Palmer Questions and  Answers
  • COSC 275 Exam 2 WOD & Study Materials- Palmer Questions and Answers

  • Exam (elaborations) • 14 pages • 2024
    (0)
  • $11.49
  • + learn more
COSC 275 Exam 1 - TAMU Palmer Questions and Answers
  • COSC 275 Exam 1 - TAMU Palmer Questions and Answers

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • COSC 275 Exam 1 - TAMU Palmer Questions and Answers Pounds per square inch - Correct Answer️️ -PSI Not in contract - Correct Answer️️ -NIC cubic yard - Correct Answer️️ -CY Linear Foot (feet) - Correct Answer️️ -LF Unless Noted Otherwise - Correct Answer️️ -UNO Square Foot (feet) - Correct Answer️️ -SF Each - Correct Answer️️ -EA Typical - Correct Answer️️ -TYP Not to scale - Correct Answer️️ -NTS .08 - Correct Answer️️ -1" .17 - Correct Answe...
    (0)
  • $11.49
  • + learn more
COSC 275 WOD 5-6 Exam 2 Latest  Update 100% Verified
  • COSC 275 WOD 5-6 Exam 2 Latest Update 100% Verified

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • COSC 275 WOD 5-6 Exam 2 Latest Update 100% Verified Air Barrier A component of the building envelope system that prohibits air leakage into a building and reduces the risk of condensation build up. House wrap and fluid-applied air barriers are examples. Anchor Bolt A threaded bolt, usually embedded in a foundation, for securing a sill, framework, or machinery. beam A horizontal structural member, such as a girder, rafter, or purlin, that transversely supports a load and transfers...
    (0)
  • $10.27
  • + learn more
COSC 275 Final Exam Palmer Study Guide with Complete Solutions
  • COSC 275 Final Exam Palmer Study Guide with Complete Solutions

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
    (0)
  • $9.99
  • + learn more
Exam (elaborations) cosc
  • Exam (elaborations) cosc

  • Exam (elaborations) • 7 pages • 2024
  • Hard bid low price Owner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals Involves criteria other than price when awarding contract Weight given to each criteria that will be considered Criteria: (changes) - Cost - Previous experience - Qualification of staff - Financial stability - Project schedule Construction Manager at Risk CMAR Construction manager hired in design phase to assist designer in constructability. CM agrees to Gua...
    (0)
  • $7.99
  • + learn more
Exam (elaborations) cosc
  • Exam (elaborations) cosc

  • Exam (elaborations) • 6 pages • 2024
  • Hard bid low price Owner hires architect Architect designs Contractors bid Awarded to low bidder Competitive sealed proposals Involves criteria other than price when awarding contract Weight given to each criteria that will be considered Construction Manager at Risk CMAR Construction manager hired in design phase to assist designer in constructibility. Also gives the owner a good handle on the cost. Design Build Only one contract - between owner and design-build contractor May be one en...
    (0)
  • $7.99
  • + learn more