Crane load charts Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Crane load charts? On this page you'll find 170 study documents about Crane load charts.

Page 3 out of 170 results

Sort by

MA Hoisting License 1B Questions With Verified Answers Updated 2024/2025 | Rated A+.
  • MA Hoisting License 1B Questions With Verified Answers Updated 2024/2025 | Rated A+.

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • MA Hoisting License 1B Questions With Verified Answers Updated 2024/2025 | Rated A+. Where is it best to connect slings to lift boom sections: End fittings 3. All manufacturers load charts and operations manual shall be kept: On the machine 4. When shall wire rope be taken out of service if used as a running line for hoisting: Six randomly distributed broken wires in 1 lay 5. When shall wire rope be taken out of service if used as a running line for hoisting: ...
    (0)
  • $11.99
  • + learn more
NCCCO Telescopic Boom Crane- Load Charts Summer 2024 Exam Review Questions and Answers 100% Pass
  • NCCCO Telescopic Boom Crane- Load Charts Summer 2024 Exam Review Questions and Answers 100% Pass

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • NCCCO Telescopic Boom Crane- Load Charts Summer 2024 Exam Review Questions and Answers 100% Pass
    (0)
  • $14.99
  • + learn more
NCCCO Practice QUESTIONS & CORRECT ANSWERS(GRADED A+)
  • NCCCO Practice QUESTIONS & CORRECT ANSWERS(GRADED A+)

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • Crane configuration includes: A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction B. hoist drum speeds, line pull, wire rope size and rigging C. load charts, LMI, axle weights and center of gravity D. drum rotation indicator, anti-two block, axle lock outs, and positive house lock - ANSWER A How does the operator determine the manufacturers recommended rope for the crane? A. count the sheav...
    (0)
  • $15.49
  • + learn more
NCCCO MOBILE CRANE / NCCCO  MOBILE CRANE EXAM 2023- 2024 ACTUAL EXAM 100  QUESTIONS AND CORRECT  DETAILED ANSWERS VERIFIED  ANSWERS GRADED A+
  • NCCCO MOBILE CRANE / NCCCO MOBILE CRANE EXAM 2023- 2024 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS VERIFIED ANSWERS GRADED A+

  • Exam (elaborations) • 29 pages • 2024
  • NCCCO MOBILE CRANE / NCCCO MOBILE CRANE EXAM 2023- 2024 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS VERIFIED ANSWERS GRADED A+ Where must the operator's manual be kept during crane operations? - ANSWER-The operator's manual must be kept in the cab at all times. According to ASME B30.5, what are the minimal requirements to meet crane operatorqualifications? - ANSWER-Physical, Written Test, Practical Test What hand signal must be obeyed at all times? - ANSWER-Stop ...
    (0)
  • $22.49
  • + learn more
NCCCO Practice Exam Questions and Answers (Graded A)
  • NCCCO Practice Exam Questions and Answers (Graded A)

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • NCCCO Practice Exam Questions and Answers (Graded A)NCCCO Practice Exam Questions and Answers (Graded A)NCCCO Practice Exam Questions and Answers (Graded A)NCCCO Practice Exam Questions and Answers (Graded A) Crane configuration includes: A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction B. hoist drum speeds, line pull, wire rope size and rigging C. load charts, LMI, axle weights and center of ...
    (0)
  • $11.49
  • + learn more
NCCCO CRANE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
  • NCCCO CRANE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 13 pages • 2024
  • Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER there is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER Separate the boom hoist lines How many randomly broken wires in a lay length must there be on a mobil...
    (0)
  • $14.49
  • + learn more
OSHA 30 study guide questions and answers 2024(updated)
  • OSHA 30 study guide questions and answers 2024(updated)

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • Those who work on a crane or near crane operations must be trained. Which of the following is true for this training? D. All of the above Certain inspections of crane equipment may be made by a(n) ___________ person; however, crane inspections are typically required to be made by a(n) __________ person. Competent, qualified After safety-related modifications have been made to crane equipment, the equipment must be inspected by __________ prior to use. A qualified person U...
    (0)
  • $14.99
  • + learn more
NCCCO Practice Test Questions and answers with 100% correct solutions | A+ Grade
  • NCCCO Practice Test Questions and answers with 100% correct solutions | A+ Grade

  • Exam (elaborations) • 8 pages • 2024
  • Crane configuration includes: A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction B. hoist drum speeds, line pull, wire rope size and rigging C. load charts, LMI, axle weights and center of gravity D. drum rotation indicator, anti-two block, axle lock outs, and positive house lock A How does the operator determine the manufacturers recommended rope for the crane? A. count the sheaves in the boom ...
    (0)
  • $8.99
  • + learn more
NCCCO MOBILE CRANE QUESTIONS AND ANSWERS | LATEST UPDATE |  2024/2025 | GRADED A+
  • NCCCO MOBILE CRANE QUESTIONS AND ANSWERS | LATEST UPDATE | 2024/2025 | GRADED A+

  • Exam (elaborations) • 26 pages • 2024
  • Available in package deal
  • NCCCO MOBILE CRANE QUESTIONS AND ANSWERS | LATEST UPDATE | 2024/2025 | GRADED A+ 1. Where must the operator's manual be kept during crane operations? a. The operator's manual must be kept in a location that is readily available b. The operator's manual must be kept in the cab at all times c. The operator's manual must be kept in the dispatch office d. The operator's manual must be kept in a secure place b. 10. What is the definition of "operating radius?" a. The distance fr...
    (0)
  • $10.33
  • + learn more
NCCCO Telescopic Core Review Questions.
  • NCCCO Telescopic Core Review Questions.

  • Exam (elaborations) • 10 pages • 2024
  • When lifting from the main boom, how is the effective weight of the fly/jib different in the erected position from that of the stowed position? A. Effective weight increases B. Effective weight decreases C. Effective weight is reduced 85% D. Effective weight is reduced 75% A. Effective weight increases Who must determine maximum speed for a mobile crane to travel with a suspended load? A. The competent person B. The job site C. The superintendent D. The craft foreman A. the ...
    (0)
  • $14.49
  • + learn more