Cslb test 4 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Cslb test 4? On this page you'll find 111 study documents about Cslb test 4.
Page 3 out of 111 results
Sort by
-
C20 Practice Test 4 Questions with 100% Correct Answers | Verified | Latest Update
- Exam (elaborations) • 53 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
C20 Practice Test 4 Questions with 100% Correct Answers | Verified | Latest Update
-
CSLB C10 TEST 1 / 120+ QUESTIONS AND CORRECT ANSWERS 2023/2024 / GRADED A+.
- Exam (elaborations) • 7 pages • 2023
-
- $10.49
- + learn more
CSLB C10 TEST 1 / 120+ 
QUESTIONS AND CORRECT 
ANSWERS 2023/2024 / 
GRADED A+. 
CSLB C10 Test 1 
1. What is the minimum working clearance from an electrical panel under 600 
V?: 36" 
2. Voltage drop in wire is a function of:: Wire gauge, Length of wire, Current flow 
in the wire 3. A 12-volt direct current, 13-watt fluorescent light is controlled by a photocell.The average daily on-time is 12 hours per day. How many watt-hours are 
consumed by the light on an average day?: 156 
4. Where may you...
-
CSLB Practice Test Questions with Complete Solutions Graded A+
- Exam (elaborations) • 5 pages • 2024
-
- $12.49
- + learn more
CSLB Practice Test Questions with Complete Solutions Graded A+ 
Abandonment of contract - Answer-abandonment of contract to cease intending or attempting to perform without legal excuse of any construction project or operation engaged in or undertaken by the licensee as a contractor shall be cause for disciplinary action 
 
Abeyance - Answer-condition in which ownership is undetermined 
 
Abstract - Answer-A summary to the history of the legal title to a piece of property; summary of a document;...
-
CSLB Concrete C8 License Practice Test #4 fully solved 2024/2025
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $17.99
- + learn more
CSLB Concrete C8 License Practice Test #4Which of the following tools is sufficient for the compacting of concrete in a small project? - correct answer Hand tamper 
 
At 50°F, how long should the concrete be protected to attain sufficient strength (normally 500 Psi)? - correct answer 48 Hours 
 
Which of the following arrangements can be used to keep the concrete at the recommended 50°F temperature for allowing proper setting? - correct answer Heaters OR Thermal blankets 
 
What is the 'Swell...
-
CSLB Practice Test | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $9.97
- + learn more
CSLB Practice Test | 100% Correct 
Answers | Verified | Latest 2024 Version 
The costs of running your business, including office expenses, etc., is called: 
 
a. Direct Costs 
b. Overhead 
c. A liability 
d. Accrual - b. Overhead 
 
Which government agency collects State Unemployment Tax? 
 
a. Employment Development Department 
b. County Unemployment Office 
c. Franchise Tax Board 
d. Internal Revenue Service - a. Employment Development Department 
 
Who does not need a California Contractor'...
Too much month left at the end of the money?
-
CSLB COMPLETE STUDY TEST WITH COMPLETE SOLUTIONS.
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
CSLB COMPLETE STUDY TEST WITH COMPLETE SOLUTIONS. 
 
 
The costs of running your business, including office expenses, etc., is called: 
 
a. Direct Costs 
b. Overhead 
c. A liability 
d. Accrual - CORRECT ANSWER b. Overhead 
 
Which government agency collects State Unemployment Tax? 
 
a. Employment Development Department 
b. County Unemployment Office 
c. Franchise Tax Board 
d. Internal Revenue Service - CORRECT ANSWER a. Employment Development Department 
 
Who does not need a California Cont...
-
CSLB Contractor's Law practice test Part 2
- Exam (elaborations) • 12 pages • 2024
-
- $11.49
- + learn more
CSLB Contractor's Law practice test Part 2 
1. B. After the con- 
tract is prepared 
but before you 
sign it 
2. B. Contractor's li- 
cense number 
3. B. The name and 
home address of 
all the personnel 
listed on the li- 
When should you let your attorney see a construction 
contract? 
A. Before you let the client see the contract 
B. After the contract is prepared but before you sign it 
C. After the building permit is obtained 
D. After the contract is signed by you and the client 
Which is...
-
CSLB EXAM QUESTIONS AND ANSWERS LATEST Update 2023/2024 (Verified Answers)
- Exam (elaborations) • 24 pages • 2023
-
- $18.49
- + learn more
CSLB EXAM QUESTIONS AND ANSWERS LATEST Update 2023/2024 (Verified Answers). A general contractor has obtained bids from several subcontractors for a private 
project. He notices that one bid is substantially lower than the rest. Is it ethical and a 
good business practice for this contractor to inform the subcontractor that the bid is 
substantially lower than the bids of the other subcontractors? - Answer Yes. If the 
contractor has reason to believe that the subcontractor has made an error in ...
-
CSLB C10 Test 1 | Latest Questions and Verified A+ Rated Answers | 2024/2025
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $9.48
- + learn more
CSLB C10 Test 1 | Latest Questions and Verified A+ Rated Answers | 2024/2025 
 
 
1. What is the minimum working clearance from an electrical panel under 600 V?: 36" 
2. Voltage drop in wire is a function of:: Wire gauge, Length of wire, Current flow in the wire 
3. A 12-volt direct current, 13-watt fluorescent light is controlled by a photocell. 
The average daily on-time is 12 hours per day. How many watt-hours are consumed by the light on an average day?: 156 
4. Where may you use nonmetal...
-
CSLB B LICENSE GENERAL CONTRACTOR COMPLETE STUDY GUIDE TEST.
- Exam (elaborations) • 44 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
CSLB B LICENSE GENERAL CONTRACTOR COMPLETE STUDY GUIDE TEST. 
 
 
If unused mortar stiffens due to hydration of cement, what must you do? - CORRECT ANSWER Discard the mortar 
 
What minimum time must you wait before caulking or grouting new tiles? - CORRECT ANSWER 24-48 Hours 
 
How long should you wait before installing tile on a shower pan? - CORRECT ANSWER 24 Hours 
 
Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than ...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia