Essential wastewater - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Essential wastewater? On this page you'll find 89 study documents about Essential wastewater.
Page 3 out of 89 results
Sort by
-
AMT2 — AMT2 Task 3- Service Line Development Questios and answers
- Exam (elaborations) • 11 pages • 2024
-
- $9.99
- + learn more
Q: Why should you plan a good maintenance program for your treatment plant? - corect answer-A: A good maintenance program is essential for a wastewater treatment plant to operate continuously at peak design efficiency. 
 
Q: What general items would you include in your maintenance program? - corect answer-A: The most important item is maintenance of the mechanical equipment-pumps, valves, scrapers, and other moving equipment. Other items include plant grounds, buildings, and structures. 
 
Q...
-
Wastewater treatment ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+
- Exam (elaborations) • 19 pages • 2024
-
- $10.89
- + learn more
Wastewater treatment ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+ 
 
 
As an operator, you are responsible to your employer for maintaining an economical and efficient operating facility. - ANSWER- TRUE 
 
An operator has an obligation to the great numbers of people who rely on down stream water supplies and are totally dependent on the operator's competence and trust worthiness for their welfare - ANSWER- TRUE 
 
Today, the natural purificat...
-
CWEA Environmental Compliance Exam Questions With Correct Answers
- Exam (elaborations) • 30 pages • 2023
- Available in package deal
-
- $12.99
- + learn more
An industry operating an 8-hour shift, 5 days per week, generates 100,000 gallons of wastewater per shift. Their pretreatment system has a capacity of 150 gallons per minute. How long must the pretreatment facility operate to process the wastewater generated each day? - Answer 11.1 hours 
 
An industry has five sewer connections with the following discharge rates: 1) 300 gpd, 2) 75 gpd, 3) 725 gpd, 4) 1,200 gpd, 5) 200 gpd A flow-weighted composite sample of 5 liters is desired. How many millili...
-
Wastewater Treatment Operator Certification Exam With Complete Questions And Answers 2024
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
Wastewater Treatment Operator Certification Exam With Complete Questions And Answers 2024 
 
 
 
 
 
 
 
 
1 mg/l is the same as 1 part per billion (ppb) 
 
True or False - correct answer.False (v.1 pg 468) 
 
A SCADA system is capable of monitoring and controlling equipment from a remote location 
 
True or False - correct answer.True (v.2 pg 627) 
 
A Discharge Monitoring Report is typically submitted to the regulatory agency on a daily basis 
 
True or False - correct answer.False 
 
A mecha...
-
CWEA Environmental Compliance Inspector Grade 1 Questions with Correct Solutions
- Exam (elaborations) • 19 pages • 2023
- Available in package deal
-
- $10.99
- + learn more
Floatable solids are easy to measure. True or False? 
False 
 
 
A well operated digester normally receives sludge at about __________% volatile solid and reduces it to about ________________% volatile solids. 
70-75%, 25-30% 
 
 
According to OSHA, which of the following oxygen in air concentration is the lowest safe concentration for humans to breathe in order to avoid the hazard of oxygen deficiency? 
19.5% oxygen 
 
 
The population equivalent factor for BOD is 
0.17 lb/day/BOD/person 
 
 
W...
Too much month left at the end of the money?
-
CWEA Environmental Compliance Questions with Correct Solutions
- Exam (elaborations) • 34 pages • 2023
- Available in package deal
-
- $10.99
- + learn more
An industry operating an 8-hour shift, 5 days per week, generates 100,000 gallons of wastewater per shift. Their pretreatment system has a capacity of 150 gallons per minute. How long must the pretreatment facility operate to process the wastewater generated each day? - 11.1 hours 
 
An industry has five sewer connections with the following discharge rates: 1) 300 gpd, 2) 75 gpd, 3) 725 gpd, 4) 1,200 gpd, 5) 200 gpd A flow-weighted composite sample of 5 liters is desired. How many milliliters...
-
Grade 2 Wastewater Treatment Operator Practice Exam (Complete with questions and correct answers) 2024/2025
- Exam (elaborations) • 6 pages • 2024
-
- $7.99
- + learn more
1 mg/l is the same as 1 part per billion - CORRECT ANSWER-F 
A scada system is capable of monitoring and controlling equipment from where? - 
CORRECT ANSWER-remote location 
A Discharge Monitoring Report is typically submitted to the regulatory agency on daily 
basis - CORRECT ANSWER-False = Monthly 
A mechanical seal is used to prevent leaks between where? - CORRECT ANSWERbetween the pump casing and shaft 
Alkalinity is the capacity of a liquid to neutralize base - CORRECT ANSWER-False = 
Al...
-
Water Purification Exam Questions and Answers 100% Solved
- Exam (elaborations) • 5 pages • 2024
-
- $8.99
- + learn more
Water Purification Exam Questions and 
Answers 100% Solved 
Water - The most important potential common source of infectious 
disease (i.e., Cholera, Shigellosis, Typhoid fever, etc); Can also be a 
source for chemically induced intoxications 
Public health - Ensuring water purity is essential for _______ 
Microorganisms - Treatment and purification schemes use _____ to 
identify, remove and degrade pollutants 
Wastewater - Domestic sewage or liquid industrial waste 
Wastewater treatment - Relie...
-
Grade 2 Wastewater Treatment Operator Practice Exam (Complete with questions and correct answers) 2024/2025
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
Grade 2 Wastewater Treatment Operator 
Practice Exam (Complete with questions 
and correct answers) 2024/2025 
1 mg/l is the same as 1 part per billion - CORRECT ANSWER-F 
A scada system is capable of monitoring and controlling equipment from where? - 
CORRECT ANSWER-remote location 
A Discharge Monitoring Report is typically submitted to the regulatory agency on daily 
basis - CORRECT ANSWER-False = Monthly 
A mechanical seal is used to prevent leaks between where? - CORRECT ANSWERbetween t...
-
TEXAS WASTEWATER LICENSE (TREATMENT) QUESTIONS AND ANSWERS
- Exam (elaborations) • 28 pages • 2023
- Available in package deal
-
- $15.49
- + learn more
Important factors that determine the type of treatment scheme that will be used include ________. 
Select one: 
 area available 
ent quality required 
ting costs 
 of the above 
d. 
all of the above 
 
 
 
Causes of sludge bulking include ________. 
Select one: 
 DO and presence of sulfides 
 supply too low 
ic loading rate too high 
ent imbalance 
 the above 
 the above 
 
 
 
A rotating biological contactor is ________. 
Select one: 
ced treatment rarely found in Texas 
b.a centrifuge for micr...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia