Estimating final exam - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Estimating final exam? On this page you'll find 655 study documents about Estimating final exam.

Page 3 out of 655 results

Sort by

 ADVANCED ESTIMATING FINAL EXAM QUESTIONS WITH VERIFIED ANSWERS ALREADY GRADED A+
  • ADVANCED ESTIMATING FINAL EXAM QUESTIONS WITH VERIFIED ANSWERS ALREADY GRADED A+

  • Exam (elaborations) • 47 pages • 2024
  • ADVANCED ESTIMATING FINAL EXAM QUESTIONS WITH VERIFIED ANSWERS ALREADY GRADED A+
    (0)
  • $8.00
  • + learn more
ARE 5.0 CONSTRUCTION & EVALUATION EXAM 2024
  • ARE 5.0 CONSTRUCTION & EVALUATION EXAM 2024

  • Exam (elaborations) • 32 pages • 2024
  • ARE 5.0 CONSTRUCTION & EVALUATION EXAM 2024 (3) ways cost estimates can be performed during Programming - correct answer 1. Unit cost system. 2. Historical data on similar types of projects. 3. Cost per square foot. Cost estimating method used during the Schematic Design - correct answer Preliminary (rough) estimates are based on pricing major elements, such as structural system selected and the MEP systems used. Cost estimating method used during the Design Development - correct ...
    (0)
  • $16.49
  • + learn more
Azure Tide 2023 Pre-Licensing Final Exam Questions & Complete Answers (With Rationale)
  • Azure Tide 2023 Pre-Licensing Final Exam Questions & Complete Answers (With Rationale)

  • Exam (elaborations) • 2 pages • 2023
  • Available in package deal
  • Azure Tide 2023 Pre-Licensing Final Exam Questions & Complete Answers (With Rationale) Azure Tide 2023 Pre-Licensing Final Exam Questions & Complete Answers (With Rationale) A Real Estate brokerage is a business where sales associates provide real estate services to clients for compensation. - ANSWER- False A Real Estate brokerage is a business where a managing broker oversees the Broker Associate/Sales Associates that work for the brokerage and provide real estate services to clients for ...
    (0)
  • $4.99
  • 2x sold
  • + learn more
Estimating Exam IV (Final Exam) 2024 Actual Questions and Answers Solved 100%
  • Estimating Exam IV (Final Exam) 2024 Actual Questions and Answers Solved 100%

  • Exam (elaborations) • 10 pages • 2024
  • Estimating Exam IV (Final Exam) 2024 Actual Questions and Answers Solved 100%
    (0)
  • $10.49
  • + learn more
Estimating Exam IV (Final Exam) UPDATED ACTUAL Questions and  CORRECT Answers
  • Estimating Exam IV (Final Exam) UPDATED ACTUAL Questions and CORRECT Answers

  • Exam (elaborations) • 10 pages • 2024
  • Estimating Exam IV (Final Exam) UPDATED ACTUAL Questions and CORRECT Answers What happens to a contractor's bid if the owner receives it five minutes after the time is due? - CORRECT ANSWER- The bid is thrown out What are two sources of common errors in the estimating process? - CORRECT ANSWER- placing numbers in wrong columns incorrect computation of numbers
    (0)
  • $9.49
  • + learn more
 CMIT Exam (200 multiple choice) Questions with Verified Answers,100% CORRECT
  • CMIT Exam (200 multiple choice) Questions with Verified Answers,100% CORRECT

  • Exam (elaborations) • 29 pages • 2023 Popular
  • Available in package deal
  • CMIT Exam (200 multiple choice) Questions with Verified Answers A CM's role and responsibilities are governed solely by the Owner/CM Agreement. True False - CORRECT ANSWER True There are two basic forms of CM, agency and at-risk. Each form provides for the basic services of construction management practice. However, there are some key differences. Which of the following do not apply to both CM forms? A) Both forms provide advice to the owner on constructibility, budget and the schedule....
    (0)
  • $11.99
  • 2x sold
  • + learn more
estimating final exam Questions With 100% Verified Answers.
  • estimating final exam Questions With 100% Verified Answers.

  • Exam (elaborations) • 13 pages • 2024
  • T or F When preparing an estimate, the importance of proper organization and structure cannot be overstated. - correct answer True T or F Labor rates for a company's employees are not overly important when estimating a project - correct answer False The ______________ views of a document set (the plans) are ideal for determining the composition of, or what is in, a wall . - correct answer Section T or F Workers' Compensation is an optional insurance that employers p...
    (0)
  • $14.49
  • + learn more
OMGT Project Management Chapter 5 pt.2 Final Exam 2024.
  • OMGT Project Management Chapter 5 pt.2 Final Exam 2024.

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • OMGT Project Management Chapter 5 pt.2 Final Exam 2024. The process of forecasting or approximating the time and cost of completing project deliverables is called A. Budgeting. B. Predicting. C. Estimating. D. Planning. E. Guesstimating. - CORRECT ANSWER c In practice, estimating processes are frequently classified as A. Top down/bottom up. B. Rough/polished. C. Precise/order of magnitude. D. Draft/final. E. Broad/Specific. - CORRECT ANSWER a What...
    (0)
  • $13.99
  • + learn more
WGU C722 Test Bank Project Management, Top Exam Questions and answers, Approved.
  • WGU C722 Test Bank Project Management, Top Exam Questions and answers, Approved.

  • Exam (elaborations) • 82 pages • 2023
  • WGU C722 Test Bank Project Management, Top Exam Questions and answers, Approved. A Guide to Project Management Body of Knowledge (PMBOK Guide) The project management standard developed by the Project Management Institute. Benefit measurement methods A type of decision model that compares the benefits obtained from a variety of new project requests by evaluating them using the same criteria and comparing the results. Co-located When team members work together at the same physical locati...
    (0)
  • $13.49
  • 2x sold
  • + learn more
COSC 153 FINAL EXAM WITH COMPLETE SOLUTIONS 100 % PASS
  • COSC 153 FINAL EXAM WITH COMPLETE SOLUTIONS 100 % PASS

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
    (0)
  • $12.99
  • + learn more