Hvac chapter 5 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Hvac chapter 5? On this page you'll find 49 study documents about Hvac chapter 5.
Page 3 out of 49 results
Sort by
-
ACG CxA Exam (CH 4: Cx Team)-correctly answered questions
- Exam (elaborations) • 6 pages • 2023
-
- $14.49
- + learn more
Identify typical team member of the Cx Tct answer1. Owner 
2. End user 
3. architect 
4. electrical engineer 
5. mechanical engineer 
6. commissioning authority 
7. controls contractor 
8. mechanical contractor 
9. electrical contractor 
10. sheet metal contractor 
11. TAB agency 
12. General or construction manager 
13. owners O&M staff 
 
Comprehensive Commissioningcorrect answer1. commissioning starts at the inception of a building project during the pre-design phase, and continues through th...
-
BOMI: Air Handling, Water Treatment & Plumbing Systems Exam Questions With Verified Answers
- Exam (elaborations) • 40 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
BOMI: Air Handling, Water Treatment & 
Plumbing Systems Exam Questions With 
Verified Answers 
BOMI - answerAir Handling, Water Treatment & Plumbing System 
Chapter 1 - answerHuman Comfort 
Review Quiz 1 - answer 
1 - The rate of exchange of fresh air for returned air in an air conditioning-system is based on the 
period of time covered and the number of building: - answerOccupants 
2 - All of the 3 following are methods of heat - answerRadiation 
Convection 
Conduction 
NOT Reduction 
3 - Which...
-
Electricity for HVAC: Check Your Knowledge Ch 1-5 Rated A
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $9.49
- + learn more
Electricity for HVAC: Check Your Knowledge Ch 1-5 Rated A 
Chapter 1 
A heating and air-conditioning service technician usually requires _____ to troubleshoot heating and air 
conditioning systems. ️voltage being supplied to the equipment 
A live electrical circuit is _____. ️one that is being supplied with energy 
_____ is used to operate most fan motors in gas furnaces. ️120 volts 
240 volts is usually used to operate _____. ️compressors in residential condensing units 
Electric...
-
Chapter 26 Fire Detection, Suppression, and Smoke Control Systems Questions and Answers 100% Pass
- Exam (elaborations) • 23 pages • 2024
-
- $12.49
- + learn more
Chapter 26 Fire Detection, Suppression, and 
Smoke Control Systems Questions and 
Answers 100% Pass 
1. How can an ionization smoke detector be identified? 
A) Low-profile, pancake shape 
B) Label stating that it contains radioactive material 
C) Lack of air vents 
D) Label stating that it contains carcinogenic material - Correct Answer️️ -B) Label 
stating that it contains radioactive material 
2. How is the tamper alarm on a pull-station connected to the fire alarm system? 
A) Through shar...
-
HVAC Chapter 7 Practice Exam Questions 2024.
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
HVAC Chapter 7 Practice Exam Questions 2024. 
is a hollow pipe or conduit that conveys and transfers air in a heating, ventilating, and cooling system. - CORRECT ANSWER Duct 
 
A duct system, frequently called ______________, is a network of ducts that confines and channels air and serves as the distribution system in a heating, ventilating, and cooling air system. - CORRECT ANSWER Ductwork 
 
type ductwork is typically used to connect diffusers, mixing boxes and other terminals. - CORRECT ANSWE...
Make study stress less painful
-
Fire alarm lesson 5&6 Questions and Answers 100% Correct
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $17.49
- + learn more
Fire alarm lesson 5&6 Questions and Answers 100% Correct 
Which article of the NEC covers burglary system wiring? 
Article 725 Correct 
 
 
 
Non-power-limited circuits operate with voltages up to ? . 
600 V 
 
 
 
 
Previous 
Play 
Next 
Rewind 10 seconds 
Move forward 10 seconds 
Unmute 
0:08 
/ 
0:15 
Full screen 
Brainpower 
Read More 
Tables ? and ? provide limitations for power-limited circuits. 
12A and 12B 
 
 
 
Generally speaking, power-limited fire alarm circuits operate at ? . 
less ...
-
Construction Materials, Methods, and Techniques Chapter 24
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $10.19
- + learn more
Construction Materials, Methods, and Techniques Chapter 
24 
WHAT TYPE OF INSULATION IS MADE FROM RECYCLED NEWSPRINT AND OTHER PAPER STOCK THAT HAS 
BEEN TREATED FOR FIRE AND PEST RESISTANCE? ️️CELLULOSE 
IF ONE WANTS A SEMI PERMEABLE VAPOR RETARDER, YOU WOULD SELECT ONE WITH A PERM RATING 
OF _____. ️️Vapor semi-permeable vapor retarders have a perm rating of 1.1 to 10. 
HEAT TRANSFER BY _____ INVOLVES THE TRANSFER OF HEAT BY THE CIRCULATION OR MOVEMENT OF 
HEATED LIQUIDS OR GASE...
-
WELL AP STUDY QUESTIONS AND ANSWERS
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
WELL AP STUDY QUESTIONS AND ANSWERS 
 
The WELL Building Standard is organized into________ major categories of wellness called concepts. - Answer-Seven 
 
A feature is one of the _________ sections of the WELL Building Standard with a specific health intent. - Answer-105 
 
A(n) _________ is a requirement of a feature that dictates certain parameters or metrics to be met. - Answer-part 
 
The aim of the _________ is to promote the continuous advancement of WELL and allow project teams to achiev...
-
Chapter 9 Career Planning and Development 2023/2024 already passed
- Exam (elaborations) • 3 pages • 2023
- Available in package deal
-
- $9.99
- + learn more
Chapter 9 Career Planning and DevelopmentOccupation - correct answer A task or series of tasks that is performed to provide a good service. People are hired to fill occupations, and they are paid for the work they perform. 
 
Career - correct answer A goal for work that is fulfilled through an occupation or series of occupations. 
 
Career Planning - correct answer The process of studying careers, assessing yourself in terms of careers, and making decisions about a future career. 
 
Career Plann...
-
HVAC JOURNEYMAN PREP TEST EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED LATEST UPDATE
- Exam (elaborations) • 17 pages • 2024
-
- $8.19
- + learn more
HVAC JOURNEYMAN PREP TEST EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED LATEST UPDATE 
 
 
A listed smoke damper designed to resist the passage of smoke shall be provided at each point in a duct or air transfer opening penetrates a: (A)smoke barrier wall (B)fire rated wall (C)interior wall (D)corridor wall 
Corridor wall (IMC 607.5.4) 
Flexible air duct may be what length? (A)10' (B)2' (C)14' (D)6' 
14' (IMC 603.6.1.1) 
The maximum vertical distance between the front lower lip...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia