Lare exam stuvia - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Lare exam stuvia? On this page you'll find 25 study documents about Lare exam stuvia.

Page 3 out of 25 results

Sort by

LARE Section 2 Exam Questions & Answers
  • LARE Section 2 Exam Questions & Answers

  • Exam (elaborations) • 8 pages • 2023
  • Aggradation - Answer The progressive accumulation of sediment along or within a stream. Results in elevation change. Alkaline Soils - Answer low conc of H+, high pH, found in areas rich in calcium carbonate. (Basic soils) Bearing Capacity - Answer A measure of the load/unit area that a material can withstand before failure Brownfield Site - Answer A plot of land that was previously developed and is not currently in use. May be contaminated and polluted. Chlorosis - Answer A condition...
    (0)
  • $11.49
  • + learn more
LARE EXAM 1(2023-2024)Questions & Answers 100% Correct!!
  • LARE EXAM 1(2023-2024)Questions & Answers 100% Correct!!

  • Exam (elaborations) • 34 pages • 2023
  • Available in package deal
  • Outline the business relationships between the three principal parties that are involved in a landscape construction project (Their obligations) - ANSWER1. Owner/ client - initiate the project ; signs separate contracts for completion, & responsible for funding design & construction 2. Contractor - hired by owner to combine necessary ingredients of materials , labor, equipment, and management to accomplish job 3. Landscape architect - deals w/ both. only contractual relationship is w/ own...
    (0)
  • $12.99
  • + learn more
LARE Exam 4(2023-2024)Questions & Answers 100% Correct(GRADED A+)
  • LARE Exam 4(2023-2024)Questions & Answers 100% Correct(GRADED A+)

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • These materials determine the compressive strength of concrete - ANSWERwater & cement Aggregate size in concrete should not exceed - ANSWER1/3 the depth of the slab Machine bolt assembly - ANSWERused to connect metal to metal Demo Plan must always include - ANSWER-Survey base w/ existing site elements -Limits of work -Hardscape to be removed Primary determinant of retaining wall's footing - ANSWERsoil bearing capacity Soil Bearing Capacity - ANSWERthe measure of a soil to decre...
    (0)
  • $10.99
  • + learn more
LARE Exam Prep Session 1Questions &Answers 100% Correct(SCORED A+)
  • LARE Exam Prep Session 1Questions &Answers 100% Correct(SCORED A+)

  • Exam (elaborations) • 23 pages • 2023
  • Available in package deal
  • The process of beginning a project involves an introductory phase wherein the owner presents explicit descriptive specifications for the proposed undertaking. Rather than simply indicate interest without nuance, and to avoid issuing irresponsible considerations for multiple projects, a contractor is required to submit a ______ to express their specifications (including designs and price) for the planned construction. - ANSWERA bid is an expression of plans and terms specific to the job at hand. ...
    (0)
  • $12.99
  • + learn more
LARE Exam 4 QUESTIONS & ANSWERS 100% VERIFIED!!
  • LARE Exam 4 QUESTIONS & ANSWERS 100% VERIFIED!!

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • What are the 4 distortions commonly found in board lumber? - ANSWERCupping (along the width of the board), Bowing (along face), Crooks (along the edge) and twisting occur along the length. What does "bark side up" refer to when laying decking boards? - ANSWERLaying decking boards with growth rings facing down and with the convex side up, preventing the board from entrapping water. What is the optimum moisture content for lumber stability in a structure? - ANSWER12% What 5 pieces of in...
    (0)
  • $10.99
  • + learn more