Metal framing - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Metal framing? On this page you'll find 334 study documents about Metal framing.
Page 3 out of 334 results
Sort by
-
American Home Inspectors Training AHIT Exam Questions and Answers
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
American Home Inspectors Training AHIT 
Exam Questions and Answers 
Flashings are metal or plastic sheets used at interfaces between building components primarily to 
- Answer-Prevent water penetration 
Flashings are most comply made of - Answer-Sheet metal 
Flashings are commonly used in all of the following locations EXCEPT - Answer-beneath 
windows 
Oriented strand board (OSB) is - Answer-Plywood sheathing 
Platform framing is considered to be better than ballon framing in all of the followin...
-
Michigan Residential Builder's Law practice exam with 100% correct answers already graded A+
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
Scope 
Range of project 
 
 
 
Cornice 
Molding at the top of a building 
 
 
 
Soffit 
The underside of a roof overhang 
 
 
 
Closed valley 
No metal flashing, intersecting shingles 
 
 
 
Open valley 
A valley at which shingles or slates are not laid to the intersection, exposing a lining of sheet metal or roll roofing 
 
 
 
Ridge Board 
A heavy horizontal board, set on edge at the apex of the roof, to which the rafters are attached 
 
 
 
Hip Roof 
A pitched roof with sloping sides and ends...
-
Michigan Residential Builder's License Test With Correct Solution
- Exam (elaborations) • 114 pages • 2023
- Available in package deal
-
- $11.49
- 2x sold
- + learn more
What is the 1st offense penalty for engaging in the practice of residential building without a license? - Answer Not less than $5K and not more than $25K and/or 1 year 
 
What is the penalty for engaging in the practice of residential building, resulting in a death? - Answer Not less than $5K and not more than $50K and/or 4 years 
 
On your individual builder's license application, what should you write as your "business address"? - Answer Your personal address 
 
What is the cost of the indi...
-
Va Contractors License exam 2024 with 100% correct answers
- Exam (elaborations) • 13 pages • 2024
-
- $15.49
- + learn more
What is the minimum distance from exposed ground for a wood framing member that is in contact with?? correct answers24 inches 
 
What is the maximum allowed slope for the top surface of a footing? correct answersNone 
 
Where should a drip edge be used? correct answersBeneath the underlayment 
 
What is the minimum height for guard rails for balcony? correct answers36 inches 
 
What test is performed to determine the drainage capacity of a soil? correct answersPerculation test- Perc Test 
 
What...
-
Professional Home Inspector state Exam Guide final 2024 tested and verified
- Exam (elaborations) • 45 pages • 2024
- Available in package deal
-
- $17.99
- + learn more
Professional Home Inspector state Exam 
Guide final 2024 tested and verified 
The inspector is not required to determine ____ ___ of any system or component. - 
CORRECT ANSWER--Years of age 
-Life expectancy 
-Make model 
Horizontal waste pipe should slope ____ inch per foot - CORRECT ANSWER-1/4" per 
foot if < 3 inch pipe. 
1/8" per foot if > or = to 3 inch pipe 
Drip screed - CORRECT ANSWER-Also called weep screed. 
Used at the base/bottom of stucco walls to release moisture. 
Pressur...
As you read this, a fellow student has made another $4.70
-
CDT Exam Questions and Answers Already Passed
- Exam (elaborations) • 38 pages • 2023
- Available in package deal
-
- $10.99
- + learn more
CDT Exam Questions and Answers Already Passed 
1. The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: 
a) Agreement. 
b) Conditions of the Contract. 
c) Division 01. d) Instructions to Bidders. b) Conditions of the Contract. 
2. General Requirements are part of: 
a) Supplementary Conditions. 
b) Bidding Requirements. 
c) Specifications. d) Summary of Work. c) Specifications. 
3. The three essen...
-
American Home Inspectors Training AHIT Questions & Answers(RATED A+)
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
Flashings are metal or plastic sheets used at interfaces between building components primarily to - ANSWER Prevent water penetration 
 
Flashings are most comply made of - ANSWER Sheet metal 
 
Flashings are commonly used in all of the following locations EXCEPT - ANSWER beneath windows 
 
Oriented strand board (OSB) is - ANSWER Plywood sheathing 
 
Platform framing is considered to be better than ballon framing in all of the following ways EXCEPT - ANSWER Platform framing results in more stable...
-
COSC 275 - Exam 2 | Latest Update | 2024/2025 | Graded A+
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $10.32
- + learn more
COSC 275 - Exam 2 | Latest Update | 
 
2024/2025 | Graded A+ 
 
Metal joist weight is given by ____, _____ does not give weight 
Manufacturer, Designation 
Metal Decking 
 
Metal decking is used for ___ and ___ applications 
Floor and Roof 
 
What 3 things can Metal decking have installed on top of it? 
(1) Concrete poured , (2) Insulation, (3) Built up roofing 
Metal decking is taken off by ____ or ____ 
Square foot or Square 
One square of roofing is how many square feet? 
100 square feet 
Est...
-
COSC 153 Midterm Exam Questions With Verified Solutions
- Exam (elaborations) • 19 pages • 2024
-
- $12.49
- + learn more
COSC 153 Midterm Exam Questions With 
Verified Solutions 
Aggregate - answerMixture of sand and stone & is a major component of concrete 
Architect - answerOne who has completed a course of study in building and design and 
draws up plans 
Backing - answerFrame lumber or metal installed between the wall studs to give additional 
support for drywall or an interior trim related item (such as handrail brackets, cabinets, towel 
bars). Items are screwed and mounted into solid wood or metal rather th...
-
BOMI - Design and Op I Key Concepts Chapters 1-8 Questions And Answers With Verified Solutions
- Exam (elaborations) • 31 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
0-20 DB Sound Level - Loudness: Very Faint 
Source: Whisper (5) 
100-200 DB Sound Level - Loudness: Deafening 
Source: Generator (5) 
20-40 DB Sound Level - Loudness: Faint 
Source: Quiet Conversation (5) 
4 Primary Project Delivery Methods - - Design Bid Build 
- Design Build 
- CMAR 
- Multiple Prime Contracts (2) 
4 Types of Shifting - Settlement, Upheaval, Sliding, Liquefaction. (4) 
40-60 DB Sound Level - Loudness: Moderate 
Source: Average Conversation (5) 
60-80 DB Sound Level - Loudness:...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia