Nccco test 4 exam - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco test 4 exam? On this page you'll find 29 study documents about Nccco test 4 exam.

Page 3 out of 29 results

Sort by

Nccco Core + Specialty Test Prep Exam Questions And Answers 100% Pass.
  • Nccco Core + Specialty Test Prep Exam Questions And Answers 100% Pass.

  • Exam (elaborations) • 12 pages • 2024
  • Nccco Core + Specialty Test Prep Exam Questions And Answers 100% Pass. ASME B30.5 - answerMobile and Locomotive cranes, all types ASME B30.3 - answerTower Cranes ASME B30.23 - answerPersonel Lifting Regs OSHA 29 CFR 1926.1400 Series - answerCranes & Derrick's used in Construction regs. Rotation Resistant Wire Rope - answer2 randomly broken wires in 6 diameters. 4 randomly broken wires in 30 diameters. Safety factor 5.0 Safety factor personel lifts 10-1 ASME B30.9 - answerSlings Per...
    (0)
  • $10.49
  • + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom correct answers c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% correct answers a. 3. The load line of the crane you're operating contacts ...
    (0)
  • $14.49
  • + learn more
NCCCO CORE TEST WITH QUESTIONS AND CORRECT ANSWERS [GRADED A+] REAL EXAM LATEST UPDATE 2024
  • NCCCO CORE TEST WITH QUESTIONS AND CORRECT ANSWERS [GRADED A+] REAL EXAM LATEST UPDATE 2024

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • NCCCO CORE TEST WITH QUESTIONS AND CORRECT ANSWERS [GRADED A+] REAL EXAM LATEST UPDATE 2024 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? Boom Up (Appendix A to Subpart CC of Part 1926--Standard Hand Signals) 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 1% ...
    (0)
  • $9.99
  • + learn more
NCCCO MOBILE CRANE EXAM 99 QUESTIONS AND   VERIKFIED CORRECT ANSWERS ANSWERS GUARANTEED PASS
  • NCCCO MOBILE CRANE EXAM 99 QUESTIONS AND VERIKFIED CORRECT ANSWERS ANSWERS GUARANTEED PASS

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • NCCCO MOBILE CRANE EXAM 99 QUESTIONS AND VERIKFIED CORRECT ANSWERS ANSWERS GUARANTEED PASS Under which circumstance does OSHA permits hoisting of personnel by crane? As long as the prevailing wind speed is less than 35 mph As long as there is no less hazardous or practicable way As long as all personnel have CPR training As long as no aerial work platform is available - b. Unless the manufacturer states otherwise, what crane capacity chart is appropriate when a crane is se...
    (1)
  • $28.49
  • + learn more
Tower Cranes NCCCO Study Guide Final  Exam with Verified Solutions
  • Tower Cranes NCCCO Study Guide Final Exam with Verified Solutions

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • Tower Cranes NCCCO Study Guide Final Exam with Verified Solutions T or F Very few areas in either the US or Canada require certification to operate a tower crane - CORRECT ANSWER-false T or F Self erecting tower cranes are easier to erect than a conventional tower crane, but erection time takes longer - CORRECT ANSWER-false How does the crane rotate with a fixed tower base? - CORRECT ANSWER-slewing ring beneath the jib T or F A mono type of tower can be either fixed or slewing - ...
    (0)
  • $10.49
  • + learn more
NCCCO Exam Bank Solution Manual Rated 100%
  • NCCCO Exam Bank Solution Manual Rated 100%

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • NCCCO Exam Bank Solution Manual Rated 100% Boom up - Answers What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 1% - Answers When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? Stay in the cab until the lines are de-energized - Answers The load line of the crane you're operatin...
    (0)
  • $7.99
  • + learn more