Ncidq lighting exam Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Ncidq lighting exam? On this page you'll find 33 study documents about Ncidq lighting exam.
Page 3 out of 33 results
Sort by
-
NCIDQ Practice Exam Questions - IDPX
- Exam (elaborations) • 9 pages • 2023
- Available in package deal
-
- $9.99
- + learn more
NCIDQ Practice Exam Questions – IDPX Questions and Answers Already Passed 
 
 Which event triggers the issuance of a certificate of occupancy? 
A. Construction work is complete except for fire alarm testing. 
B. The contractor sends you a pay request for 100% complete work. 
C. The owner wants to move into part of the space before the rest is finished. 
D. The city inspector has inspected and finalized the job. Answer: D 
 
What factors are MOST important in determining the locations of indivi...
-
NCIDQ Practice Exam Questions – IDPX with 100% Correct Answers
- Exam (elaborations) • 8 pages • 2024
-
- $12.49
- + learn more
NCIDQ Practice Exam Questions – IDPX 
with 100% Correct Answers 
Which event triggers the issuance of a certificate of occupancy? 
A. Construction work is complete except for fire alarm testing. 
B. The contractor sends you a pay request for 100% complete work. 
C. The owner wants to move into part of the space before the rest is finished. 
D. The city inspector has inspected and finalized the job. - ️️ Answer: D 
What factors are MOST important in determining the locations of individual w...
-
NCIDQ Practice Exam Questions – IDPX with complete solutions 2023
- Exam (elaborations) • 6 pages • 2023
- Available in package deal
-
- $9.99
- + learn more
NCIDQ Practice Exam Questions – IDPX with complete solutions 2023Which event triggers the issuance of a certificate of occupancy? 
A. Construction work is complete except for fire alarm testing. 
B. The contractor sends you a pay request for 100% complete work. 
C. The owner wants to move into part of the space before the rest is finished. 
D. The city inspector has inspected and finalized the job. - correct answer Answer: D 
 
What factors are MOST important in determining the locations of in...
-
NCIDQ Exam with 100% Correct Answers 2023
- Exam (elaborations) • 25 pages • 2023
- Available in package deal
-
- $11.99
- + learn more
In addition to analyzing space needs, the requirements for a client's work flow or 
business process should be compared with the available space. 
Which workflow type does not have strict organized method of work flow? 
a. departmental 
b. cooperative 
c. network 
d. linear - Correct answer-c. network 
With a network workflow organization, there is no strictly organized method of workflow 
A building that has a platinum rating has been designed and certified under which of the 
following system...
-
NCIDQ Exam Building Code Requirements
- Exam (elaborations) • 4 pages • 2024
-
- $9.99
- + learn more
NCIDQ Exam Building Code Requirements 
Common Path of Egress Travel 
The portion of the exit access [access to an exit] that must be traversed BEFORE two separate and distinct paths of travel to two exits are available. Common path of egress travel 
shall be included within the permitted travel distance. 
Travel Distance 
The distance measured from the most remote point within a story to the entrance to an exit along the natural and unobstructed path of egress travel. 
MUST be 1-hour fire rated ...
Too much month left at the end of the money?
-
NCIDQ Exam Building Code Requirements (Answered) Graded A+ 2022?2023
- Exam (elaborations) • 4 pages • 2022
- Available in package deal
-
- $9.49
- + learn more
NCIDQ Exam Building Code Requirements 
Common Path of Egress Travel 
The portion of the exit access [access to an exit] that must be traversed BEFORE two separate and distinct paths of travel to two exits are available. Common path of egress travel 
shall be included within the permitted travel distance. 
Travel Distance 
The distance measured from the most remote point within a story to the entrance to an exit along the natural and unobstructed path of egress travel. 
MUST be 1-hour fire rated ...
-
NCIDQ - IDFX EXAM STUDY SET QUESTIONS & ANSWERS
- Exam (elaborations) • 55 pages • 2024
-
- $44.82
- + learn more
NCIDQ - IDFX EXAM STUDY SET 
 
. The partial floor plan given shows the subdivision of one side of an existing building into five offices with the architectural dimensions given on the outside of the building. Why is office #305 not dimensioned? 
(A) It is the same width as office #304. 
(B) Dimension strings are left incomplete. 
(C) There may be a potential conflict with the existing overall dimension. 
(D) The dimensions can be calculated by subtraction from the existing architectural dimensi...
-
NCIDQ IDPX Model Exam Questions (175 QA)
- Exam (elaborations) • 31 pages • 2024
-
- $13.99
- + learn more
NCIDQ IDPX Model Exam Questions (175 QA) 
1. An interior designer has determined the required gross occupant area required for a client planning to lease space in an office building. Using the Building Owners and Managers Association (BOMA) standard ANSI/BOMA Z65.1, Office Buildings: Standard Methods of Measurement, which of the following would be used to determine the amount of lease space the client will be paying for? 
(A) building efficiency ratio 
(B) building load factor 
(C) R/U ratio 
(D...
-
NCIDQ IDPX Model Exam Questions (175 QA)
- Exam (elaborations) • 31 pages • 2024
-
- $13.49
- + learn more
NCIDQ IDPX Model Exam Questions (175 QA) 
1. An interior designer has determined the required gross occupant area required for a client planning to lease space in an office building. Using the Building Owners and Managers Association (BOMA) standard ANSI/BOMA Z65.1, Office Buildings: Standard Methods of Measurement, which of the following would be used to determine the amount of lease space the client will be paying for? 
(A) building efficiency ratio 
(B) building load factor 
(C) R/U ratio 
(D...
-
NCIDQ – IDPX(rated A+ ALREADY PASSED!)
- Exam (elaborations) • 79 pages • 2022
- Available in package deal
-
- $20.49
- + learn more
NCIDQ – IDPX(rated A+ ALREADY PASSED!)A: Door Schedule 
Where would it be best to call out the frame material on an entry door? 
 
A. door schedule 
 
B. finish schedule 
 
C. hardware schedule 
 
D. finish plan 
 
 
 
A: 'I' should be used for interior design sheets when an architect's drawings are included as part of the drawing set 
 
'I' is most commonly used when architectural drawings are also included in a drawing set, as a means to easily distinguish between architectural and inte...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia