Nerc Test Questions & Answers
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Nerc Test Questions & Answers 
60 minutes - ANS-According to Nerc Standards, an emergency interchange transaction can be exempt 
from tagging if it is less than_________________ 
2 business days - ANS-A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it 
to the RC within how many days 
5% - ANS-During restoration efforts load pick-ups should not exceed_____________ percentage of 
synchronized generation capacity 
load and generation - ANS-What are the two components...
-
NERC Test Questions with Correct Answers Graded A+
- Exam (elaborations) • 22 pages • 2023
- Available in package deal
-
- $9.49
- + learn more
NERC Test Questions with Correct Answers Graded A+ 
 
What percentage of load gives a 1 Hz change in an island condition? -Answer 6-10% (Think 6-10 day island vacation) 
 
If ACE is Zero but system Hz is off, what should a system operator do? -Answer Nothing! ACE bias and interchange schedule will improve frequency 
 
If ACE is Zero, why not adjust generation to help frequency? -Answer Could overload equipment, this is a NERC violation 
 
When restoring from blackout condition, what should be do...
-
NERC Test Questions and Answers 2023/2024.
- Exam (elaborations) • 23 pages • 2024
- Available in package deal
-
- $16.49
- + learn more
NERC Test Questions and Answers 2023/2024.
-
NERC Test Questions with Guaranteed Accurate Answers 2024
- Exam (elaborations) • 22 pages • 2024
-
- $14.59
- + learn more
What percentage of load gives a 1 Hz change in an island condition? - correct answer 6-10% (Think 6-10 day island vacation) 
 
If ACE is Zero but system Hz is off, what should a system operator do? - correct answer Nothing! ACE bias and interchange schedule will improve frequency 
 
If ACE is Zero, why not adjust generation to help frequency? - correct answer Could overload equipment, this is a NERC violation 
 
When restoring from blackout condition, what should be done with load? - correct ans...
-
NERC Test Questions Flashcards questions and answers verified 2024
- Exam (elaborations) • 47 pages • 2024
- Available in package deal
-
- $13.89
- + learn more
NERC Test Questions Flashcards questions and answers verified 2024
Get paid weekly? You can!
-
Nerc Test questions with correct answers
- Exam (elaborations) • 10 pages • 2023
- Available in package deal
-
- $14.99
- + learn more
According to Nerc Standards, an emergency interchange transaction can be exempt from tagging if it is less than_________________ CORRECT ANSWER 60 minutes 
 
A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to the RC within how many days CORRECT ANSWER 2 business days 
 
During restoration efforts load pick-ups should not exceed_____________ percentage of synchronized generation capacity CORRECT ANSWER 5% 
 
What are the two components that a system operator should...
-
NERC text questions & Answers(Latest Update 2024)Accurate
- Exam (elaborations) • 23 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
Operating reserve may be provided by which of the following? 
A. LTCs 
B. Capacitor banks 
C. Voltage regulators 
D. Interruptible loads - ANSWER D. Interruptible loads 
 
Which of the following is the responsibility of a reserve sharing group (RSG)? 
A. Complying with DCS as if it was a single control area 
B. Proving regulation service for neighboring RSGs 
C. Ensuring each control area in the group maintains 50% blackstart capability 
D. Complying with the control performance standards as if ...
-
NERC Test Questions With 100% Accurate Answers Review Soln
- Exam (elaborations) • 24 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
NERC Test Questions With 100% Accurate Answers Review Soln 
1. What percentage of load gives a 1 Hz change in an island condition? - ANS-6-10% (Think 6-10 
day island vacation) 
2. If ACE is Zero but system Hz is off, what should a system operator do? - ANS-Nothing! ACE bias 
and interchange schedule will improve frequency 
3. If ACE is Zero, why not adjust generation to help frequency? - ANS-Could overload equipment, 
this is a NERC violation 
4. When restoring from blackout condition, what ...
-
NERC Test Questions Flashcards with complete solution 2023
- Exam (elaborations) • 47 pages • 2023
- Available in package deal
-
- $17.49
- + learn more
NERC Test Questions Flas(REVIEW DIAGRAM #1) 
If CB-5 is closed, which of the following best describes the impact on the voltages at Stations A and B? 
A. voltage at Station B will increase and the voltage at Station A will decrease 
B. voltage at Station A will increase and the voltage at Station B will decrease 
C. voltage at Station A and B will increase 
D. voltage at Station A and B will decrease - correct answer voltage at Station A and B will decrease 
 
(REVIEW DIAGRAM #2) 
If a high v...
-
Nerc Test Questions with Correct Answers Rated A+
- Exam (elaborations) • 9 pages • 2023
- Available in package deal
-
- $8.49
- + learn more
According to Nerc Standards, an emergency interchange transaction can be exempt from 
tagging if it is less than_________________ -Answer 60 minutes 
A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to the RC 
within how many days -Answer 2 business days 
During restoration efforts load pick-ups should not exceed_____________ percentage of 
synchronized generation capacity -Answer 5% 
What are the two components that a system operator should be aware of for control...