Osha 30 14 cranes - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Osha 30 14 cranes? On this page you'll find 58 study documents about Osha 30 14 cranes.
Page 3 out of 58 results
Sort by
-
OSHA 10 and Final Review Questions And Answers Rated A+ New Update Assured Satisfaction
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
A 30 ton crane will lift _____ pounds at a minimum radius and minimum boom length per the cranes 
load chart. - 60,000 
Can you walk in excavation area if there is sitting water? - No 
Crane safety requires a safe minimum distance of ____ feet from all power lines up to 50 KV. - 10 
Do steel toe boots need to comply with ANSI? - Yes 
Fall protection is required at how many feet? - 6 
Fall protection systems must be designed by a ____ person. - Qualified 
First scaffold step is to not exceed how ...
-
Nccco Core + Specialty Test Prep Exam Questions And Answers 100% Pass.
- Exam (elaborations) • 12 pages • 2024
-
- $10.49
- + learn more
Nccco Core + Specialty Test Prep Exam 
Questions And Answers 100% Pass. 
ASME B30.5 - answerMobile and Locomotive cranes, all types 
ASME B30.3 - answerTower Cranes 
ASME B30.23 - answerPersonel Lifting Regs 
OSHA 29 CFR 1926.1400 Series - answerCranes & Derrick's used in Construction regs. 
Rotation Resistant Wire Rope - answer2 randomly broken wires in 6 diameters. 
4 randomly broken wires in 30 diameters. 
Safety factor 5.0 
Safety factor personel lifts 10-1 
ASME B30.9 - answerSlings 
Per...
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
What action does a signal person intend the operator to perform if he extends his arm at 
shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom correct answers c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% correct answers a. 
3. The load line of the crane you're operating contacts ...
-
Advanced rigging test 2 final real exam questions and answers
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
Advanced rigging test 2 final real exam 
questions and answers 
1) What is meant by the term "two blocking - CORRECT ANSWER-The load block 
contacts the boom point sheaves. 
2) lifting 20,000lbs, with a 2-leg bridle sling at a 30 horizontal sling angle, what is force 
applied to each leg? - CORRECT ANSWER-20,000 
3) In multiple crane lifts using an equalizer beam, the weight of the beam should be 
considered: - CORRECT ANSWER-Part of the load weight 
4) What is required if there is a deviat...
-
STS-C Exam Questions With 100% Correct Answers 2024
- Exam (elaborations) • 65 pages • 2024
- Available in package deal
-
- $15.49
- + learn more
STS-C Exam Questions With 100% Correct 
Answers 2024 
AIHA - answerAmerican Industrial Hygiene Association 
ASSE - answerAmerican Society of Safety Engineers 
NFPA - answerNational Fire Protection Association 
IIE - answerInstitute of Industrial Engineers 
NSC - answerNational Safety Council 
SFPE - answerSociety of Fire Protection Engineers 
SSS - answerSystem Safety Society 
Career Paths in Safety - answerEducation 
Experience 
Certification 
STS - Safety Trained Supervisor 
STS C - answerSafe...
Want to regain your expenses?
-
NCCCO MOBILE CRANE Questions And Answers Graded A+.
- Exam (elaborations) • 12 pages • 2024
-
- $10.99
- + learn more
NCCCO MOBILE CRANE Questions And Answers Graded A+. 
 
 
 
 
 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - correct answer. c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d....
-
OSHA 10: Occupational Safety and Health Administration Final Exam| Questions with Verified Answers| (Updated 2023/ 2024)
- Exam (elaborations) • 25 pages • 2023
- Available in package deal
-
- $10.59
- + learn more
OSHA 10: Occupational Safety and Health Administration Final Exam| Questions with Verified Answers| (Updated 2023/ 2024) 
 
1.	True or False: There is usually some form of warning before a cave-in. 
 
 
~	Answer: False 
 
 
 
2.	OSHA requires that all excavations in which employees could potentially be exposed to cave-ins be protected by one or more of the following three methods: 
 
 
~	Answer: Sloping, benching, shoring and shielding (Your Answer) 
 
 
 
3.	The formula for all simple slope exc...
-
STS-C Exam Questions With Correct Answers
- Exam (elaborations) • 82 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
AIHA - Answer American Industrial Hygiene Association 
 
ASSE - Answer American Society of Safety Engineers 
 
NFPA - Answer National Fire Protection Association 
 
IIE - Answer Institute of Industrial Engineers 
 
NSC - Answer National Safety Council 
 
SFPE - Answer Society of Fire Protection Engineers 
 
SSS - Answer System Safety Society 
 
Career Paths in Safety - Answer Education 
Experience 
Certification 
 
STS - Safety Trained Supervisor 
STS C - Answer Safety certification for new safe...
-
OSHA 30 - Quiz - 14 Cranes Questions and Answers 2024 with complete solution
- Exam (elaborations) • 1 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
When it is difficult for an operator to determine power line clearance by visual means, an observer is not 
necessary. - Answer-False 
Rated load capacities, recommnended operating speeds and special hazards or instrutions may be 
posted - Answer-On all equipment 
A crane or derrick inspection must be carried out - Answer-Prior to each use 
The minimum clearance between a crane and any power line rated at 50 kV or below must be 10 feet - 
Answer-True 
A gong or other effective audible warning si...
-
Advanced rigging test 2 final real exam questions and answers
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
1) What is meant by the term "two blocking - CORRECT ANSWER-The load block 
contacts the boom point sheaves. 
2) lifting 20,000lbs, with a 2-leg bridle sling at a 30 horizontal sling angle, what is force 
applied to each leg? - CORRECT ANSWER-20,000 
3) In multiple crane lifts using an equalizer beam, the weight of the beam should be 
considered: - CORRECT ANSWER-Part of the load weight 
4) What is required if there is a deviation in the lift plan? - CORRECT ANSWER-A new 
lift plan 
5) On l...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia