Pjm generator operator Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Pjm generator operator? On this page you'll find 33 study documents about Pjm generator operator.

Page 3 out of 33 results

Sort by

PJM Transmission Exam Study Guide | Questions with 100% Correct Answers
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers

  • Exam (elaborations) • 29 pages • 2024
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers During System Restoration, what is the optimal Frequency Range? ANS-59.75 - 61 Hz The 500 kV system has normal bus voltages between? ANS-500 to 550 kV When Connecting 2 islands, the operator must match? ANS-Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) ANS-30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV When will ...
    (0)
  • $12.99
  • + learn more
PJM Generation Dispatcher Sample Exam Questions and Answers
  • PJM Generation Dispatcher Sample Exam Questions and Answers

  • Exam (elaborations) • 12 pages • 2024
  • PJM Generation Dispatcher Sample Exam Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating : A. below 60 hertz B. on a new price curve C. on a new cost curve D. off cost ( out of merit) - Correct Answer ️️ -D. off cost ( out of merit ) Monitoring LMP may give insights into : A. system constraints B. system voltage C. system frefuency D. time error - Correct Answer ️️ -A. system constraints PJM calls for which o...
    (0)
  • $12.49
  • + learn more
PJM Exam Questions and Answers
  • PJM Exam Questions and Answers

  • Exam (elaborations) • 16 pages • 2024
  • PJM Exam Questions and Answers What is the threshold for having a satellite phone? - Correct Answer ️️ -500 MW How often is reactive testing completed? - Correct Answer ️️ -5 years Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 1) Incorrect interchange number 2) Loss of a tie-line RTU 3) Loss of internal load 4) Loss of adjacent control area generation - Correct Answer ️️ -Loss of adjacent control area generation PJM should be ...
    (0)
  • $12.49
  • + learn more
PJM Exam Questions and Answers
  • PJM Exam Questions and Answers

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • PJM Exam Questions and Answers What is the threshold for having a satellite phone? - Correct Answer ️️ -500 MW How often is reactive testing completed? - Correct Answer ️️ -5 years Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 1) Incorrect interchange number 2) Loss of a tie-line RTU 3) Loss of internal load 4) Loss of adjacent control area generation - Correct Answer ️️ -Loss of adjacent control area generation PJM should be ...
    (0)
  • $12.49
  • + learn more
PJM Transmission Exam Study Questions &  Correct Answers | Latest Update |Already  Graded A+PJM Transmission Exam Study Questions &  Correct Answers | Latest Update |Already  Graded A+
  • PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+

  • Exam (elaborations) • 46 pages • 2024
  • During System Restoration, what is the optimal Frequency Range? : 59.75 - 61 Hz The 500 kV system has normal bus voltages between? : 500 to 550 kV When Connecting 2 islands, the operator must match? : Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) : 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV When will PJM issue a Minimum Generation Alert? (how many MW under normal operating limits) ...
    (0)
  • $13.29
  • + learn more
PJM Transmission Exam Study Questions and Answers
  • PJM Transmission Exam Study Questions and Answers

  • Exam (elaborations) • 35 pages • 2024
  • Available in package deal
  • PJM Transmission Exam Study Questions and Answers During System Restoration, what is the optimal Frequency Range? - Correct Answer ️️ -59.75 - 61 Hz The 500 kV system has normal bus voltages between? - Correct Answer ️️ -500 to 550 kV When Connecting 2 islands, the operator must match? - Correct Answer ️️ -Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) - Correct Answer ️️ -30 MW Gen/mile of energized...
    (0)
  • $13.49
  • + learn more
PJM Gen Test Questions & Answers 2024
  • PJM Gen Test Questions & Answers 2024

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • PJM Gen Test Questions & Answers 2024 If the scheduled frequency must be adjusted for a time error correction, what would the PJM operator set the frequency schedule to for a fast clock? - ANSWER-59.98 What is the PJM regulation requirement for the off-peak period? - ANSWER-525 Which of the following PJM reserves are NOT synchronized? - ANSWER-Non-synchronized (quick-start) What is the margin in relationship to regulation requirement that is used by PJM for assigning or de-assignin...
    (0)
  • $7.99
  • + learn more
PJM Sample Test Review 2024 Questions and Answers
  • PJM Sample Test Review 2024 Questions and Answers

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • PJM Sample Test Review 2024 Questions and Answers Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - Correct Answer ️️ -off cost out of merit. Monitoring ___________ may give insights into system constraints. - Correct Answer ️️ -Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - Correct Answer ️️ -PJM calls on synchronized reserves If not cancelled by...
    (0)
  • $12.49
  • + learn more
PJM Generator Exam Questions and Answers
  • PJM Generator Exam Questions and Answers

  • Exam (elaborations) • 7 pages • 2024
  • PJM Generator Exam Questions and Answers The purpose of the Deploy All Resources Action is to instruct all generating resources to be on line and at full output _________ - Correct Answer ️️ -immediately upon receipt of dispatch instruction A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation Operators should: - Correct Answer ️️ -Ensure all unit voltage regulators are in service PJM can issue the Deploy All Resources Action for________ - Correct Answe...
    (0)
  • $11.49
  • + learn more
PJM Test Questions Well Answered And Graded A+.
  • PJM Test Questions Well Answered And Graded A+.

  • Exam (elaborations) • 33 pages • 2024
  • Available in package deal
  • Which of the following balancing control modes is used by PJM under normal operations? - correct answer Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? - correct answer Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability - correct answer Dynamic Instability If PJM experienced an event...
    (0)
  • $13.99
  • + learn more