Pjm generator operator Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Pjm generator operator? On this page you'll find 33 study documents about Pjm generator operator.
Page 3 out of 33 results
Sort by
![PJM Transmission Exam Study Guide | Questions with 100% Correct Answers](/docpics/4699438/65eb6173f2df9_4699438_121_171.jpeg)
-
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers
- Exam (elaborations) • 29 pages • 2024
-
- $12.99
- + learn more
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers 
During System Restoration, what is the optimal Frequency Range? ANS-59.75 - 61 Hz 
 
The 500 kV system has normal bus voltages between? ANS-500 to 550 kV 
 
When Connecting 2 islands, the operator must match? ANS-Voltage, Phase Angle and Frequency 
 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) ANS-30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV 
 
When will ...
![PJM Generation Dispatcher Sample Exam Questions and Answers](/docpics/5086919/6628011b84ff2_5086919_121_171.jpeg)
-
PJM Generation Dispatcher Sample Exam Questions and Answers
- Exam (elaborations) • 12 pages • 2024
-
- $12.49
- + learn more
PJM Generation Dispatcher Sample 
Exam Questions and Answers 
Real time transmission constraints or contingencies may be alleviated with generators 
operating : 
A. below 60 hertz 
B. on a new price curve 
C. on a new cost curve 
D. off cost ( out of merit) - Correct Answer ️️ -D. off cost ( out of merit ) 
Monitoring LMP may give insights into : 
A. system constraints 
B. system voltage 
C. system frefuency 
D. time error - Correct Answer ️️ -A. system constraints 
PJM calls for which o...
![PJM Exam Questions and Answers](/docpics/5550400/6660c9b22ea1f_5550400_121_171.jpeg)
-
PJM Exam Questions and Answers
- Exam (elaborations) • 16 pages • 2024
-
- $12.49
- + learn more
PJM Exam Questions and Answers 
What is the threshold for having a satellite phone? - Correct Answer ️️ -500 MW 
How often is reactive testing completed? - Correct Answer ️️ -5 years 
Which of the following would NOT be a cause for a sudden deviation in the balancing 
area ACE? 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4) Loss of adjacent control area generation - Correct Answer ️️ -Loss of adjacent 
control area generation 
PJM should be ...
![PJM Exam Questions and Answers](/docpics/5086852/6627ffee94d72_5086852_121_171.jpeg)
-
PJM Exam Questions and Answers
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
PJM Exam Questions and Answers 
What is the threshold for having a satellite phone? - Correct Answer ️️ -500 MW 
How often is reactive testing completed? - Correct Answer ️️ -5 years 
Which of the following would NOT be a cause for a sudden deviation in the balancing 
area ACE? 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4) Loss of adjacent control area generation - Correct Answer ️️ -Loss of adjacent 
control area generation 
PJM should be ...
![PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+](/docpics/5172596/663384bd262d2_5172596_121_171.jpeg)
-
PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+
- Exam (elaborations) • 46 pages • 2024
-
- $13.29
- + learn more
During System Restoration, what is the optimal Frequency Range? 
: 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? 
: 500 to 550 kV 
When Connecting 2 islands, the operator must match? 
: Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 
: 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV 
When will PJM issue a Minimum Generation Alert? (how many MW under normal 
operating limits) 
...
![PJM Transmission Exam Study Questions and Answers](/docpics/5086878/6628008e13ff5_5086878_121_171.jpeg)
-
PJM Transmission Exam Study Questions and Answers
- Exam (elaborations) • 35 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
PJM Transmission Exam Study 
Questions and Answers 
During System Restoration, what is the optimal Frequency Range? - Correct Answer ️️ 
-59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? - Correct Answer ️️ -500 to 
550 kV 
When Connecting 2 islands, the operator must match? - Correct Answer ️️ -Voltage, 
Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 
- Correct Answer ️️ -30 MW Gen/mile of energized...
![PJM Gen Test Questions & Answers 2024](/docpics/4135933/6595d3551baa3_4135933_121_171.jpeg)
-
PJM Gen Test Questions & Answers 2024
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
PJM Gen Test Questions & Answers 2024 
 
 
If the scheduled frequency must be adjusted for a time error correction, what would the PJM operator set the frequency schedule to for a fast clock? - ANSWER-59.98 
 
What is the PJM regulation requirement for the off-peak period? - ANSWER-525 
 
Which of the following PJM reserves are NOT synchronized? - ANSWER-Non-synchronized (quick-start) 
 
What is the margin in relationship to regulation requirement that is used by PJM for assigning or de-assignin...
![PJM Sample Test Review 2024 Questions and Answers](/docpics/5086890/66280090ef4d8_5086890_121_171.jpeg)
-
PJM Sample Test Review 2024 Questions and Answers
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
PJM Sample Test Review 2024 
Questions and Answers 
Real time transmission constraints or contingencies may be alleviated with generators 
operating ______________ - Correct Answer ️️ -off cost out of merit. 
Monitoring ___________ may give insights into system constraints. - Correct Answer ️️ 
-Monitoring LMP's 
PJM calls for _____________ reserves to recover ace so that tie line schedules are 
maintained. - Correct Answer ️️ -PJM calls on synchronized reserves 
If not cancelled by...
![PJM Generator Exam Questions and Answers](/docpics/5550388/6660c9ab7e8c5_5550388_121_171.jpeg)
-
PJM Generator Exam Questions and Answers
- Exam (elaborations) • 7 pages • 2024
-
- $11.49
- + learn more
PJM Generator Exam Questions and Answers 
The purpose of the Deploy All Resources Action is to instruct all generating resources 
to be on line and at full output _________ - Correct Answer ️️ -immediately upon 
receipt of dispatch instruction 
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. 
Generation Operators should: - Correct Answer ️️ -Ensure all unit voltage regulators 
are in service 
PJM can issue the Deploy All Resources Action for________ - Correct Answe...
![PJM Test Questions Well Answered And Graded A+.](/docpics/4766761/65f72f36c5054_4766761_121_171.jpeg)
-
PJM Test Questions Well Answered And Graded A+.
- Exam (elaborations) • 33 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
Which of the following balancing control modes is used by PJM under normal operations? - correct answer Tie-Line Bias 
 
Which of the following influences does PJM consider when performing their system load forecast? - correct answer Weather Conditions & Day of the Week 
 
All of the following are limits that must be submitted to PJM for generating units EXCEPT: 
 
1. Eco Min 
2. Eco Max 
3. Emergency Max 
4. Dynamic Instability - correct answer Dynamic Instability 
 
If PJM experienced an event...
![Verkoop je kennis op stuvia](https://www.stuvia.com/hosted-imgs/app/stock-fotos/banner_seller_big.jpg)
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia