Steam generators - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Steam generators? On this page you'll find 136 study documents about Steam generators.

Page 3 out of 136 results

Sort by

Power Engineering 4A exam 2023 with 1005 correct answers
  • Power Engineering 4A exam 2023 with 1005 correct answers

  • Exam (elaborations) • 31 pages • 2023
  • why was the ASME formed? - correct answer develop tech info, high standard of design and education, personal and professional development,ethical conduct, solutions for tech problems CSA B51 committee? - correct answer provincial and territorial jurisdiction, boiler manufacturers, insurance companies what is the purpose of B52? - correct answer provide safe design, construction, installation, operation, repair of refrigeration and air con. promote uniform requirements ASME 1 - c...
    (0)
  • $16.49
  • + learn more
Final Assessment Correct answers| NERC EXAM| 317 QUESTIONS WITH COMPLETE SOLUTIONS
  • Final Assessment Correct answers| NERC EXAM| 317 QUESTIONS WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 77 pages • 2024
  • Available in package deal
  • Final Assessment Correct answers| NERC EXAM| 317 QUESTIONS WITH COMPLETE SOLUTIONS When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% Answer-B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine gen...
    (0)
  • $14.49
  • + learn more
Power Engineering 2A3 Final Exam Questions And Answers Already Passed 2024.
  • Power Engineering 2A3 Final Exam Questions And Answers Already Passed 2024.

  • Exam (elaborations) • 49 pages • 2024
  • Available in package deal
  • One boiler horsepower is equal to how many kW - Answer 9.809kW This is still the common measure of capacity for small boilers, where large boiler capacity is given in the number of kg of steam per hour. What are the definitions of boiler, steam generator and steam generating unit? - Answer Boiler - strictly speaking are the elements in which the change of state from water to steam takes place. Steam generator - embraces the many combinations of heating surfaces, such as water walls,...
    (0)
  • $8.29
  • + learn more
P98 Exam Questions With 100% Correct Answers, Latest Updated 2024/2025 (GRADED A+)
  • P98 Exam Questions With 100% Correct Answers, Latest Updated 2024/2025 (GRADED A+)

  • Exam (elaborations) • 24 pages • 2024
  • Available in package deal
  • P98 Exam Questions With 100% Correct Answers, Latest Updated 2024/2025 (GRADED) Fuel-oil is generally used in buildings in stationary equipment for two purposes - Correct Answer-fuel emergency generators or to fuel equipment used to heat the building. the person supervising the Fuel-Oil Transfer in the Building from one floor to another must hold - Correct Answer-P-98 Certificate of Fitness. Certificate of Fitness holders must maintain all qualifications and comply with all requirements appl...
    (0)
  • $14.99
  • + learn more
NERC Exam Final Assessment Questions and Correct Answers Graded A+
  • NERC Exam Final Assessment Questions and Correct Answers Graded A+

  • Exam (elaborations) • 79 pages • 2024
  • NERC Exam Final Assessment Questions and Correct Answers Graded A+When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% -AnswerB. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geoth...
    (0)
  • $11.49
  • + learn more
IATRA
  • IATRA

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • IATRA Speed limit below 10,000 ASL Correct Ans - 250 kias Speed limit below 3,000 AGL or 10 NM of controlled airport Correct Ans - 200 kias What are 3 ways to prevent hydro planing? Correct Ans - 1. Keep tires properly inflated 2. Use light braking don't lock the wheels 3. Use aerodynamic braking keep the weight off the wheels What is dynamic hydroplaning ? Correct Ans - When the water lifts the wheel off the runway Wh...
    (0)
  • $13.99
  • + learn more
NERC Exam Final Assessment Questions and Correct Answers Graded A+
  • NERC Exam Final Assessment Questions and Correct Answers Graded A+

  • Exam (elaborations) • 79 pages • 2023
  • Available in package deal
  • NERC Exam Final Assessment Questions and Correct Answers Graded A+ When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% -Answer B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. G...
    (0)
  • $9.49
  • + learn more
FDNY COF P-98 Exam With 100% Correct Answers Latest Updated 2024 (Already Graded!!)
  • FDNY COF P-98 Exam With 100% Correct Answers Latest Updated 2024 (Already Graded!!)

  • Exam (elaborations) • 22 pages • 2024
  • Available in package deal
  • FDNY COF P-98 Exam With 100% Correct Answers Latest Updated 2024 (Already Graded!!) Where generally *Fuel-oil is used in buildings?* What purposes?* - Correct AnswerIs used in *Stationary Equipments*, Two purposes: a) *Fuel Emergency Generators* b) *Fuel Equipment used to heat the building* 2.- What *COF is required* to supervise the *Fuel-oil transfer in the building from one floor to another?* - Correct Answer-*P-98 and maintain all qualifications and comply w/ requirements applicable to...
    (0)
  • $17.49
  • + learn more
Final Assessment Nerc  questions and verified correct  answers
  • Final Assessment Nerc questions and verified correct answers

  • Exam (elaborations) • 77 pages • 2023
  • When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% - correct answer B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geothermal generators D. Hydroelectric generators - correct a...
    (0)
  • $13.99
  • + learn more
Short questions and answers  EE1251 Electrical Machines II
  • Short questions and answers EE1251 Electrical Machines II

  • Exam (elaborations) • 16 pages • 2024
  • Short questions and answers EE1251 Electrical Machines II 1. Why almost all large size Synchronous machines are constructed with rotating field system type? The following are the principal advantages of the rotating field system type construction of Synchronous machines: • The relatively small amount of power, about 2%, required for field system via slip-rings and brushes. • For the same air gap dimensions, which is normally decided by the kVA rating, more space is availabl...
    (0)
  • $17.99
  • + learn more