What is the asme - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about What is the asme? On this page you'll find 1062 study documents about What is the asme.
Page 3 out of 1.062 results
Sort by
-
API 570 - Open Book - Practice Exam 2024 Already Passed
- Exam (elaborations) • 22 pages • 2024
-
- $10.99
- + learn more
A Hydrotest is conducted on an underground line as a substitute for the external inspection. The 
test pressure is 200 Psig. At the end of the test, the pressure must be at least - API 570 9.8.6 
190 Psig. 
Determine the maximum allowed pressure for a Class 300 flange that has a design temperature 
of 950 °F. The flange material is ASTM A217 Gr. C12 - B16.5 Table 1.1-1 
375 Psig. 
An 8 NPS pipe is being replaced with A106 gr. B material. The pipe retirement thickness (Tmin) 
is 0.218" and the ...
-
API 570 - Open Book - Practice Exam 2024 Already Passed
- Exam (elaborations) • 22 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
API 570 - Open Book - Practice Exam 
 
2024 Already Passed 
 
A Hydrotest is conducted on an underground line as a substitute for the external inspection. The 
test pressure is 200 Psig. At the end of the test, the pressure must be at least - API 570 9.8.6 
190 Psig. 
Determine the maximum allowed pressure for a Class 300 flange that has a design temperature 
of 950 °F. The flange material is ASTM A217 Gr. C12 - B16.5 Table 1.1-1 
375 Psig. 
An 8 NPS pipe is being replaced with A106 gr. B mater...
-
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Verified)
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
If load is undetermined who is to find out if load weight does not exceed crane rating at radius 
at which the load is to be lifted - ANSWER Person responsible for lift 
Where should climbing instructions be kept - ANSWER ON Site 
All climbing operations shall be performed under the supervision of - ANSWER Qualified 
person 
When cranes are erected, load limiting devices shall be tested for proper setting and 
operation - ANSWER Before crane is placed in service 
Hooks shall be equipped with lat...
-
NCCCO CORE Study Guide with complete solutions |Latest 2024/2025
- Other • 32 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
According to ASME B30.5, what do 2 audible signals made by the operator mean? Go ahead 
 
When calculating a crane's net capacity, what is the correct procedure to follow of the rating listed in the capacity chart is greater than the permissible line pull of the wire rope? Use the permissible line pull of the wire rope and make deductions 
 
When Swinging Unlevel Crane? Load Radius Increases. 
 
According to OSHA 1926 subpart cc, what is the minimum distance that must be maintained betwee...
-
NCCCO Signal Person Test with Verified Answers |Latest 2024/2025
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
When using voice signals according to asme b30.5 who must be present for the pre lift discussion lift director, signalman and operator 
 
a qualified signal person must have knowledge of the standard hand and voice signals along with a basic understanding of crane operations and limitations 
 
ASME B30.3 is what type of crane tower 
 
when signaling a personnel platform 1926.1431 states tag lines must be used when necessary to control platform 
 
ASME B30.2 overhead crane 
 
overheard ...
Too much month left at the end of the money?
-
ABSA 4TH CLASS PART A REVIEW ALREADY GRADED A
- Exam (elaborations) • 117 pages • 2024
-
- $13.49
- + learn more
When applying to write a Power Engineer certificate of competency examination, the candidate 
must: Select one: 
a. Undergo mandatory drug testing 
b. Hold the next lower class of qualification 
c. Pass a criminal records check 
d. Pass both a written and oral examination b. Hold the next lower class of qualification 
A machine lifts a load of 12kN with an applied effort of 4kN. What distance will the load move 
if the effort moves a distance of 8m and the efficiency of the machine is 70%? 
Sele...
-
Power Engineering 4a - Unit 3, 4 - Introduction to power engineering and its governance in Canada, Plant and Fire Safety Already Passed
- Exam (elaborations) • 37 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
Power Engineering 4a - Unit 3, 4 - 
Introduction to power engineering and 
its governance in Canada, Plant and Fire 
 
Safety Already Passed 
 
The pressure of a fully charged SCBA is about 
A)24 MPa 
B)1 atmosphere 
C)31 MPa 
D)3 MPa 
E)20 MPa C 
 
This group recommends updates to the learning materials of each class of Power Engineer, and 
the criteria required to ensure a Power Engineer is properly qualified when a Certificate of 
Competency is issued. 
Select one: 
a. ANSI 
 
b. ACI 
c. SOPE...
-
API 510 Latest Update Graded A+
- Exam (elaborations) • 37 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
API 510 Latest Update Graded A+ 
 
Scope of API 510 
4 in service activities 
4 construction code oddities 
what is the purpose? 
In-service inspection, repair, alteration and rerating. Pressure vessels and PRD's 
All in-service hydrocarbon and chemical process vessels. Unless voided by RBI 1.2.2 
A) Vessels constructed under a construcion code. ASME BPVC 
B) vessel constructed without a code 
C) vessel constucted under special jurisdictional acceptance 
D) vessel constructed under code but l...
-
API 653 Closed book quiz latest 2024 already passed
- Exam (elaborations) • 86 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
API 653 Closed book quiz latest 2024 
 
already passed 
 
API 653 covers which of the following types of tanks? 
A) Carbon and low alloy steel tanks built to ASME Section VIII, Div. 1 
B) Carbon and low alloy steel tanks built to ASME Section X 
C) Carbon and low alloy steel tanks built to API 650 and 12C 
D) Carbon and low alloy steel tanks built to API 510 C 
 
API 653 provides the requirements for construction of which of the following? 
A) Process pressure vessels 
B) Aboveground petroleum s...
-
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct) Splices in rall tracks shall have - ANSWER Smooth Joints 
Hydraulic systems should have their proper fluid level checked - ANSWER Daily 
If power fails during operations, the following shouldn't apply - ANSWER Do your best to 
finish moving load where it was designated to go 
If load is undetermined who is to find out if load weight does not exceed crane rating at radius 
at which the load is to be lifted - ANSW...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia