When soil is compacted - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about When soil is compacted? On this page you'll find 265 study documents about When soil is compacted.

Page 3 out of 265 results

Sort by

FDOT Earthwork Level 1 || Questions and 100% Verified Answers.
  • FDOT Earthwork Level 1 || Questions and 100% Verified Answers.

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Basics covered in Level 1 correct answers Nuclear Testing Speedy Moisture Report Forms Earthwork has to do with the roadway in what way? correct answers Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? correct answers 6" of compacted depth at full width In Earthwork what is a Lot? correct answers A lot is 1 lift at 500 ft or within compacted area. Isolated compaction operations are separate lots. Samplin...
    (0)
  • $10.29
  • + learn more
CC342 Soil Compaction... Fact and Fiction Common Questions and their Answers
  • CC342 Soil Compaction... Fact and Fiction Common Questions and their Answers

  • Exam (elaborations) • 4 pages • 2024
  • . What causes soil compaction? Compaction occurs when soil particles move closer together because of external forces exerted by humans, animals, equipment and water droplets. It can be found on the soil surface and at almost any depth. Compacting soils leads to conditions that are less than optimum for crop growth, soil water management and efficient use of agricultural chemicals. 2. How does soil compaction develop? Soil compaction can be influenced by several factors, but tillag...
    (0)
  • $15.49
  • + learn more
GEORGIA PLUMBING EXAM - MASTER UNRESTRICTED.
  • GEORGIA PLUMBING EXAM - MASTER UNRESTRICTED.

  • Exam (elaborations) • 23 pages • 2024
  • Available in package deal
  • Branch Interval A vertical measurement of distance, 8 feet (2438 mm) or more in developed length, between the connections of horizontal branches to a drainage stack. Measurements are taken down the stack from the highest horizontal branch connection. Building Drain that part of the lowest horizontal piping of a drainage system which receives the discharge from soil, waste and other drainage pipes inside the walls of the building and conveys it to the building sewer beginning 30" meter ...
    (0)
  • $14.49
  • + learn more
AZ ROC Trade Exam B-1 License Questions With Complete Solutions
  • AZ ROC Trade Exam B-1 License Questions With Complete Solutions

  • Exam (elaborations) • 32 pages • 2023
  • What is a sub grade? correct answer: A surface of earth or rock leveled off to receive a foundation. Who has the authority to change or adjust the shoring method of an excavation? correct answer: Engineer. When excavating, what problem does water in the trench create? correct answer: Unstable soil. If 45 cubic yards of excavated is 36 cubic yards when compacted back into the excavation, what is the difference? correct answer: 20%. What is the best way to compact soil? correct ans...
    (0)
  • $13.99
  • + learn more
ICC SOILS 1 – 130 QUESTIONS AND ANSWERS
  • ICC SOILS 1 – 130 QUESTIONS AND ANSWERS

  • Exam (elaborations) • 8 pages • 2023
  • Who hires the Special inspector? - Answer- The Owner or Registered Design Professional in Responsible Charge acting as the owner's agent. The Special Inspector is approved by and shall demonstrate competence to the _____. - Answer- Building Offical Registered Design Professional in Responsible Charge Upon arrival at a jobsite, the Special Inspector shall check in with the _____. - Answer- Contractor SIM p.16 Final report goes to...? - Answer- BO Who do you notify first after an ...
    (0)
  • $11.99
  • + learn more
ICC Soils 1 – 130 TEST  QUESTIONS LATELY UPDATED
  • ICC Soils 1 – 130 TEST QUESTIONS LATELY UPDATED

  • Exam (elaborations) • 17 pages • 2023
  • Available in package deal
  • ICC Soils 1 – 130 TEST QUESTIONS LATELY UPDATED Who hires the Special inspector? - ANSWER The Owner or Registered Design Professional in Responsible Charge acting as the owner's agent. The Special Inspector is approved by and shall demonstrate competence to the _____. - ANSWER Building Offical Registered Design Professional in Responsible Charge Upon arrival at a jobsite, the Special Inspector shall check in with the _____. - ANSWER Contractor SIM p.16 Final report goes to...?...
    (0)
  • $12.99
  • + learn more
ISA Arborist Chapter 13 Complete Study set Questions with Elaborated Answers
  • ISA Arborist Chapter 13 Complete Study set Questions with Elaborated Answers

  • Exam (elaborations) • 3 pages • 2024
  • ISA Arborist Chapter 13 Complete Study set Questions with Elaborated Answers Name five ways that trees can be adversely affected by construction. - CORRECT ANSWER-root injury soil compaction injury to trunk or branches grade change excavation/severing root system When soil is compacted, the _______ _______ between soil particles is reduced. - CORRECT ANSWER-pore space The phases of land development are... - CORRECT ANSWER-site clearing and demolition rough grading utility installa...
    (0)
  • $11.49
  • + learn more
Michigan Builders License Exam Questions With 100% Correct Answers | Verified | Latest Update 2024/2025
  • Michigan Builders License Exam Questions With 100% Correct Answers | Verified | Latest Update 2024/2025

  • Exam (elaborations) • 59 pages • 2024
  • Available in package deal
  • Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. - Correct Answer-IRC (International Residential Code) Administrative - Correct Answer-First 2 chapters of code book are True - Correct Answer-Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F Yes - Correct Answer-Does the building official have the authorit...
    (0)
  • $15.49
  • + learn more
FDOT Earthwork Level 1 Exam Questions and Answers
  • FDOT Earthwork Level 1 Exam Questions and Answers

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Basics covered in Level 1 -Correct Answer Nuclear Testing Speedy Moisture Report Forms Earthwork has to do with the roadway in what way? -Correct Answer Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? -Correct Answer 6" of compacted depth at full width In Earthwork what is a Lot? -Correct Answer A lot is 1 lift at 500 ft or within compacted area. Isolated compaction operations are separate lots. Sampl...
    (0)
  • $11.79
  • + learn more
EARTH SCIENCE ROCK CYCLE & 3 CLASSES OF ROCK EXAM QUESTIONS AND ANSWERS 2024|GUARANTEED SUCCESS
  • EARTH SCIENCE ROCK CYCLE & 3 CLASSES OF ROCK EXAM QUESTIONS AND ANSWERS 2024|GUARANTEED SUCCESS

  • Exam (elaborations) • 10 pages • 2023
  • rock Naturally occurring solid mixture of 1 or more minerals and organic matter. rock cycle series of process in which rock forms changes is destroyed and reforms by geological processes erosion process by which wind water ice or gravity transports soil and sediment from one location to another Deposition the process in which eroded material is laid down composition chemical make-up of a rock texture quality of a rock based on the size, shape and position...
    (0)
  • $14.99
  • + learn more