Api 570 open book - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Api 570 open book? On this page you'll find 32 study documents about Api 570 open book.

Page 4 out of 32 results

Sort by

API 570 - Open Book - Practice Exam 2024 Already Passed
  • API 570 - Open Book - Practice Exam 2024 Already Passed

  • Exam (elaborations) • 22 pages • 2024
  • A Hydrotest is conducted on an underground line as a substitute for the external inspection. The test pressure is 200 Psig. At the end of the test, the pressure must be at least - API 570 9.8.6 190 Psig. Determine the maximum allowed pressure for a Class 300 flange that has a design temperature of 950 °F. The flange material is ASTM A217 Gr. C12 - B16.5 Table 1.1-1 375 Psig. An 8 NPS pipe is being replaced with A106 gr. B material. The pipe retirement thickness (Tmin) is 0.218" and the ...
    (0)
  • $14.49
  • + learn more
API 570 Open Book Exam Questions with Certified Solutions
  • API 570 Open Book Exam Questions with Certified Solutions

  • Exam (elaborations) • 13 pages • 2024
  • 1- A hydrotest is being conducted on an underground line as a substitute for the external inspection. The test pressure is 200 psig. At the end of the test, the pressure must be at least: C.190 psig 2- Determine the maximum allowed pressure for a class 300 flange that has a design temperature of 950 degrees F. The flange material is ASTM A217 gr.C12 B. 375 psig 3- An 8 NPS pipe is being replaced with A106 gr. B material. The pipe retirement thickness is 0.218" and the corrosion allowance ...
    (0)
  • $10.49
  • + learn more