Bmps swppp - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Bmps swppp? On this page you'll find 44 study documents about Bmps swppp.

Page 4 out of 44 results

Sort by

CESSWI, Part 1 Questions with correct Answers 2023
  • CESSWI, Part 1 Questions with correct Answers 2023

  • Exam (elaborations) • 5 pages • 2023
  • CESSWI, Part 1 Questions with correct Answers 2023 Water Quality Standards State or tribal requirements that define the water quality goals of a water body by designating the beneficial uses and setting criteria to protect those uses CWA Section 401 Regulates water quality impacts and state certification programs. Required for any permit or license issues by a federal agency for any activity that may result in a discharge to waters of the U.S. CWA Section 402 Established NPDES ...
    (0)
  • $17.99
  • + learn more
ARE – SWPPP Questions & Answers 100% UPDATED!
  • ARE – SWPPP Questions & Answers 100% UPDATED!

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • What is an SWPPP? - ANSWERS- Identifies potential sources of stormwater pollution at the construction site - Describes practices to reduce pollutants in storm water discharges from the construction site - Identifies procedures the operator will implement to comply with the terms and conditions of a construction general permit Reduction of pollutants is often achieved by: - ANSWERSControlling the volume of stormwater runoff Impervious surfaces such as buildings, homes, roads, sidewalks, ...
    (0)
  • $14.49
  • + learn more
SWM Inspector Exam Guide 2024
  • SWM Inspector Exam Guide 2024

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • Activities exempt from CBPA (p.7) - -permitted surface or deep mining, oil and gase operations -clearing of lands for agriculture, forestry, etc. -single family residential less than 1 acre (w/ exceptions) -discharges to sanitary sewer or combined sewer system -activities to turn abandon properties into agricultural -routine maintenance, etc. -land-disturbing activities in response to public emergency Construction GP Operator meets either of these two criteria (p.8) - 1. Direct operatio...
    (0)
  • $10.99
  • + learn more
CISEC Exam Solved 100 Correct
  • CISEC Exam Solved 100 Correct

  • Exam (elaborations) • 12 pages • 2024
  • CISEC Exam Solved 100% Correct. LDP NPDES CWA Penalty Types What documents are required on site? Who is the "operator"? Also the LRP. When do you need permit coverage? Large Land Development Vertical Projects Bix Box Projects Linear Projects What is erosion? What are the three types of Wind Erosion? Which method of wind erosion moves the most soil? What are the types of water erosion? Raindrop Erosion Sheet Erosion Rill and Gully Erosion What factors impact rainfall erosion? ...
    (0)
  • $12.49
  • + learn more
QSP EXAM 2023-2024 LATEST EXAM 150 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A
  • QSP EXAM 2023-2024 LATEST EXAM 150 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A

  • Exam (elaborations) • 9 pages • 2023
  • Who must file Permit Registration Documents (PRDs) prior to the commencement of construction activity? a. Qualified SWPPP Developer (QSD) b. Legally Responsible Person (LRP) or the LRP's Approved Signatory c. Qualified SWPPP Practitioner (QSP) d. The CEO - ----ANSWER>>>>>B Which regulation establishes a framework for regulating municipal and industrial storm water discharges to waters of the United States: a. Clean Water Act (CWA) b. Porter-Cologne Water Quality Control ...
    (0)
  • $9.49
  • + learn more
CEPSCI
  • CEPSCI

  • Exam (elaborations) • 11 pages • 2023
  • 1972 clean water act Administered by the US environmental protection agency (EPA) Created the NPDES 1987 Amendment to CWA CALLED WATER QUALITY ACT NPDES in south carolina South Carolina is NPDES delegated state. NPDES regulations are administered by SCDHEC CGP authorizes stormwater discharges from construction sites Who must obtain NPDES coverage land disturbing activities greater than or equal to 1 acre -land disturbance less than 1 ac within 1/2 miles ...
    (0)
  • $13.49
  • + learn more
CISEC Exam Questions With Verified Answers.
  • CISEC Exam Questions With Verified Answers.

  • Exam (elaborations) • 11 pages • 2024
  • CISEC Exam Questions With Verified Answers. When working in waterways or wetlands, which permit is required? - answer404 Permit NPDES - answerNational Pollutant Discharge Elimination System Section of CWA (Clean Water Act) to permit stormwater discharges associated with industrial activities per the permit CWA Penalty Types - answerClass I. Negligent Class II. Knowingly = Greater Fines What documents are required onsite? - answerSWPPP CGP Site Map Drawings and Key All inspection repo...
    (0)
  • $12.49
  • + learn more
CPESC Section 1 & 2 Questions and Answers 2023
  • CPESC Section 1 & 2 Questions and Answers 2023

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • CPESC Section 1 & 2 Questions and Answers 2023 What does the acronym NPDES stand for? National Pollutant Discharge Elimination System True / False: The NPDES requirements apply only to discharges of storm-water either directly or through a municipal separate storm drain system, to waters of the US. 2.1.1.6 True What does the acronym TMDL stand for? Define it? 2.1.1.10 Total Maximum Daily Load. The amount of a particular pollutant that a water body can assimilate on a daily ba...
    (0)
  • $17.99
  • + learn more
Walmart / Sam's Safety, Employment, Waste First Class Series.
  • Walmart / Sam's Safety, Employment, Waste First Class Series.

  • Exam (elaborations) • 6 pages • 2024
  • -submit the notice of intent (NOI) -submit the notice of termination (NOT) submit the notice of termination (NOT) The stormwater notice of intent (NOI) must be submitted -after the sediment discharge -after the SWPPP is prepared and before starting construction -after stormwater BMPs have been installed - after stormwater inspectors issue a violation after the SWPPP is prepared and before starting construction Potential pollutant sources stored on a construction site may include -petro...
    (0)
  • $20.36
  • + learn more
CISEC Exam Questions With Correct Answers
  • CISEC Exam Questions With Correct Answers

  • Exam (elaborations) • 14 pages • 2023
  • LDP - Answer Land Developing Projects - altering landscape for projects such as agriculture or housing ect. NPDES - Answer National Pollutant Discharge Elimination System - section of the CWA (Clean Water Act) to permit stormwater discharges associated w industrial activities PER permit CWA Penalty Types - Answer Adminstrative Class I. Neglegent Class II. Knowlingly = greater fines What documents are required on site? - Answer - SWPPP - CGP - Site Map - Drawings and Key - All...
    (0)
  • $12.99
  • + learn more