Bottom up estimating - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Bottom up estimating? On this page you'll find 407 study documents about Bottom up estimating.

Page 4 out of 407 results

Sort by

Software Quality Assurance exam with verified solutions
  • Software Quality Assurance exam with verified solutions

  • Exam (elaborations) • 7 pages • 2024
  • Acceptance Tests Benchmark, Pilot, Parallel Benchmark tests tests ran by users using predefined test cases Previous Play Next Rewind 10 seconds Move forward 10 seconds Unmute 0:07 / 0:15 Full screen Brainpower Read More Pilot tests tests ran by users under normal or everyday situation Beta testing done at customer's site Alpha testing done at developer's site Parallel test New system operates in parallel with previous version to make trans...
    (0)
  • $14.99
  • + learn more
ISDS 351 Final Exam Questions and Answers
  • ISDS 351 Final Exam Questions and Answers

  • Exam (elaborations) • 33 pages • 2024
  • Available in package deal
  • ISDS 351 Final Exam Questions and Answers A dependency pertains to the sequencing of project activities or tasks. - Correct Answer ️️ -True After defining project activities, the next step in project time management is developing the schedule. - Correct Answer ️️ -False A(n) ...... for a project is the series of activities that determine the earliest time by which the project can be completed. - Correct Answer ️️ -Critical Path In a critical path analysis, the shortest path is...
    (0)
  • $13.49
  • + learn more
State Farm Estimatics Exam Questions With 100% Correct Answers
  • State Farm Estimatics Exam Questions With 100% Correct Answers

  • Exam (elaborations) • 17 pages • 2024
  • State Farm Estimatics Exam Questions With 100% Correct Answers Removal of shingles estimate for the actual number of squares (not square feet). No estimating or rounding Replacement of shingles a) Include waste in the calculation -10% - Composite -15% - wood b) Round up to the nearest bundle -Assume 3 bundles per SQ for composite shingles -Assume 4 bundles per SQ for wood What do wood shingle estimates always end with? fourths. .25, .5, .75, .00 What do composite shingle estimates a...
    (0)
  • $12.49
  • + learn more
Michigan Builders Exam Questions and Answers Solved 100% Graded A 2024
  • Michigan Builders Exam Questions and Answers Solved 100% Graded A 2024

  • Exam (elaborations) • 23 pages • 2024
  • Available in package deal
  • What is not a step in lead paint safety? - using a shopvac Each one gallon of water added to one yard of concrete will... - Reduce the PSI strength by 150. A construction lien can be placed on? - Residential, and Commercial property. Trench boxes are used.... - to protect workers in deeper excavation. About how much does a yard of dirt weigh? - lbs The board shall consist of _____voting members, and ______ member's shall represent the general public. - 9, 3 Who is responsible...
    (0)
  • $14.99
  • + learn more
WGU C722 FINAL EXAM!!  Q&A – PROJECT MANAGEMENT (Guaranteed Score A+)
  • WGU C722 FINAL EXAM!! Q&A – PROJECT MANAGEMENT (Guaranteed Score A+)

  • Exam (elaborations) • 46 pages • 2023
  • WGU C722 FINAL EXAM!! Q&A – PROJECT MANAGEMENT (Guaranteed Score A+) Three essential drivers that must be achieved to generate positive characteristics in project teams *** Cohesiveness, Trust, Motivation The five stages Dr. Bruce Tuckman (1965) introduced of group development *** Forming, Storming, Norming, Performing, Adjorning Forming *** In this stage, team members may be meeting for the first time. Often, no one really knows much about anyone else on the team. It may be prematur...
    (0)
  • $12.99
  • 3x sold
  • + learn more
-EBTM 443 exam 2023 with 100% correct answers
  • -EBTM 443 exam 2023 with 100% correct answers

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • The process of forecasting or approximating the time and cost of completing project deliverables is called A. Budgeting B. Predicting C. Estimating D. Planning E. Guesstimating Estimating In practice, estimating processes are frequently classified as A. Top down/bottom up B. Rough/polished C. Precise/order of magnitude D. Draft/final E. Both A and B are correct Top down/bottom up A typical statement in actual practice is that estimates should have a probability of being...
    (0)
  • $17.49
  • + learn more
Proj Mno Exam 1 Quizes Actual Questions And And Answers 100% Guaranteed Pass.
  • Proj Mno Exam 1 Quizes Actual Questions And And Answers 100% Guaranteed Pass.

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • A WBS is_________ (check all that are true) A visual representation or "picture" of the project A schedule of project activities Correct! A helpful tool for eventually developing accurate estimates Made by a project manager alone and shared with the team A to-do list of project item - correct answer A visual representation or "picture" of the project A helpful tool for eventually developing accurate estimates Communication Plan...
    (0)
  • $13.99
  • + learn more
COSC 275 Final Exam Palmer | Latest Version | 2024/2025 | Rated A+
  • COSC 275 Final Exam Palmer | Latest Version | 2024/2025 | Rated A+

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • COSC 275 Final Exam Palmer | Latest Version | 2024/2025 | Rated A+ (Finish x Thickness)/27 CY of Concrete 20/80 rule 80% of time is used for 20% of take-off 30 amps with 2 breakers ex. 30/2 43,560 1 acre of land = ? SF Active soil Soil that swells when it comes in contact with water. Addendum A document describing an addition, change, correction, or modification to contract documents. An addendum is issued by the design professional during the bidding period or prior to the ...
    (0)
  • $9.73
  • + learn more
PACT Essential Academic Skills: Tests 701, 702, 703 Graded A
  • PACT Essential Academic Skills: Tests 701, 702, 703 Graded A

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • PACT Essential Academic Skills: Tests 701, 702, 703 Graded A Descriptive writing Writing used to create detailed descriptions of people, places, and things, and/or mood and atmosphere. Can stand alone or be part of a narrative Sensory details descriptions of sight, sound, touch, smell, taste transition words words that create a sense of time and organize events in the story narrative writing writing that tells a story or describes a specific person, place, or thing. Persuasive/argumentative...
    (0)
  • $9.99
  • 1x sold
  • + learn more
HFMA SET A GRADED
  • HFMA SET A GRADED

  • Exam (elaborations) • 16 pages • 2024
  • Definition of cost - correct answer Can be the amount paid for the service. It can also be the amount paid for salaries or to other vendors Direct Cost - correct answer Are the costs that can be traced directly to a department, product, or service (Salaries, Employee benefits, medications, supplies, aging and equipment maintenance contract Direct cost in a health Plan - correct answer Would be the actual claims payments made by the plan on behalf of its members indirect costs - correct ...
    (0)
  • $12.49
  • + learn more