CMGT 4100 Final Exam Correct 100%(RATED A+)
- Exam (elaborations) • 1 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
CMGT 4100 Final Exam Correct 100%(RATED A+)CMGT 4100 Final Exam Correct 100%(RATED A+)CMGT 4100 Final Exam Correct 100%(RATED A+)CMGT 4100 Final Exam Correct 100%(RATED A+)CMGT 4100 Final Exam Correct 100%(RATED A+)CMGT 4100 Final Exam Correct 100%(RATED A+)CMGT 4100 Final Exam Correct 100%(RATED A+)CMGT 4100 Final Exam Correct 100%(RATED A+)
-
CMGT 410 - WEEK 5 - Apply: Post-Test EXAM 100+
- Exam (elaborations) • 38 pages • 2024
-
- $13.00
- + learn more
CMGT 410 - WEEK 5 - Apply: Post-Test EXAM 100+
-
CMGT 410 Midterm #2 Questions & Answers 100% Correct!!
- Exam (elaborations) • 2 pages • 2024
-
- $11.19
- + learn more
Three Safety Considerations when working with cofferdams. - ANSWER1. People working inside the cofferdam 
2. Areas surrounding jobsite that would be affected by spillage 
3. Falls into the cofferdam 
 
Scour - ANSWERErosion of banks and earth surrounding a cofferdam from excess flows and differing water conditions due to the cofferdam being built. 
 
Steel Sheet Piling - ANSWER 
 
Soldier Pile and Lagging - ANSWER 
 
Soil Nails - ANSWER 
 
Secant Pile - ANSWER 
 
T or F: Soldier Pile Walls are v...
-
CMGT 410 Midterm #2 100% Correct!!
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
Soldier Pile Walls are very strong and so they never require tiebacks - ANSWERFalse 
 
Soil nails are typically mechanically tensioned. - ANSWERFalse 
 
Helical, or mechanical, tieback anchors are usually the most economical retaining wall tieback. - ANSWERFalse 
 
Ground freezing is an effective way of cutting off water. - ANSWERTrue 
 
Triple fluid jet grouting systems use air and water to erode the soil and yield a higher quality of soil-cement mix. - ANSWERTrue 
 
Thru-point / tie-point conn...
-
CMGT/410: Project Planning and Implementation Post Test | Questions with 100% Correct Answers | Latest Update 2024 | Verified
- Exam (elaborations) • 19 pages • 2024
-
- $9.99
- + learn more
CMGT/410: Project Planning and Implementation Post Test | Questions with 100% Correct Answers | Latest Update 2024 | Verified
Make study stress less painful
-
CMGT 410: Project Planning and Implementation Post Test | 105 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 12 pages • 2024
-
- $11.49
- + learn more
Which of the following is not a part of active listening? - Thinking about what you are going to do or 
say next 
All of the following are examples of special causes, except for which one? - Measurement errors 
Is Scrum an Agile methodology? - No. Scrum is a framework. 
When the customer is thinking and explaining something one way and the team takes it in a different 
way. This is referred to as which of the following? - The gulf of misunderstanding 
Which of the following are parts of the 13 c...
-
CMGT 4100 Final Exam Correct 100%
- Exam (elaborations) • 1 pages • 2024
-
- $11.09
- + learn more
· advantages of bar charts ( - ANSWERsimple to prepare) (simple to read) 
 
· what advantages does a network diagram have over a bar chart - ANSWER- logic or relationships of activities 
 
· purpose of resource allocation- - ANSWERties back to efficiency making sure each activity get the needed resources 
 
· Whats something we haven't leveled- - ANSWERtime you can level equipment materials labor but not really time 
 
· When you accelerate a project what happens to - ANSWERdirect cost- in...
-
CMGT 410 Midterm #2 Questions & Answers 100% Correct
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
Three Safety Considerations when working with cofferdams. - ANSWER1. People working inside the cofferdam 
2. Areas surrounding jobsite that would be affected by spillage 
3. Falls into the cofferdam 
 
Scour - ANSWERErosion of banks and earth surrounding a cofferdam from excess flows and differing water conditions due to the cofferdam being built. 
 
Steel Sheet Piling - ANSWER 
 
Soldier Pile and Lagging - ANSWER 
 
Soil Nails - ANSWER 
 
Secant Pile - ANSWER 
 
T or F: Soldier Pile Walls are v...
-
CMGT 410 Exams Questions & Answers 100% Correct
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $16.99
- + learn more
Scrum - ANSWERA framework within which people can address complex adaptive problems, while productively and creatively delivering products of the highest possible value. 
 
Agile - ANSWERThe ability to adapt and change directions as needed. 
 
Self-organization model - ANSWERA model that optimizes the flexibility of decision making and the courage to be creative 
 
Product Owner - ANSWERA Scrum team member whose main job is to maximize the value of the product and the value of the work of the de...
-
CMGT 4100 Test 1 Questions & Answers(RATED A+)
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $15.49
- + learn more
What info is addressed in the planning and scheduling process? - ANSWER-Planning- "what" is going to be done, "how", "where", and by "whom" 
-Scheduling- determining time needed to complete a project 
 
Who developed the bar chart - ANSWERHenry Gantt 
 
Is A-O-A (or ADM) a version of CPM scheduling? - ANSWERYes 
 
What is the difference in determinist and probabilistic durations? Which does A-O-A use? Which does PERT use? - ANSWER-Deterministic schedules - specific durations dates, and t...