Cyb 210 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cyb 210? On this page you'll find 89 study documents about Cyb 210.

Page 4 out of 89 results

Sort by

CYB 210 Final Review Questions all 100% Solved Correct
  • CYB 210 Final Review Questions all 100% Solved Correct

  • Exam (elaborations) • 8 pages • 2024
  • CYB 210 Final Review Questions all 100% Solved Correct
    (0)
  • $12.49
  • + learn more
Cyb 210 Networking Exam Study Guide with Questions all 100% Solved Correct
  • Cyb 210 Networking Exam Study Guide with Questions all 100% Solved Correct

  • Exam (elaborations) • 8 pages • 2024
  • Cyb 210 Networking Exam Study Guide with Questions all 100% Solved Correct
    (0)
  • $12.79
  • + learn more
CYB 210 Module 1 Study Guide with Complete Solutions
  • CYB 210 Module 1 Study Guide with Complete Solutions

  • Exam (elaborations) • 8 pages • 2024
  • CYB 210 Module 1 Study Guide with Complete Solutions Developed by Cisco for collection/monitoring of network traffic flow data generated by NetFlow-enabled routers/switches: - Port Address Translation (PAT) - NetFlow - NetBIOS - Switching - Hosts - Answer-NetFlow A network protocol developed by Cisco for the collection and monitoring of network traffic flow data generated by NetFlow-enabled routers and switches (Rouse, 2014) Original networking protocol for DOS and Windows PCs: - Por...
    (0)
  • $9.99
  • + learn more
CYB 210 chapter 2 Study Guide with Complete Solutions
  • CYB 210 chapter 2 Study Guide with Complete Solutions

  • Exam (elaborations) • 5 pages • 2024
  • CYB 210 chapter 2 Study Guide with Complete Solutions This base system is represented through binary code - Answer-Base2 This base system is represented through decimal (standard number form we use) - Answer-Base10 Base system known as hexadecimal - Answer-Base16 Base system known as octal - Answer-Base8 Which base system goes from 1-9 and A-F - Answer-Base16 These base systems are primarily utilized to ensure that data is retained during manipulation or transportation where certain cha...
    (0)
  • $9.99
  • + learn more
SNHU CYB 210 Quizz
  • SNHU CYB 210 Quizz

  • Exam (elaborations) • 1 pages • 2024
  • SNHU CYB 210 Quizz
    (0)
  • $7.99
  • + learn more
CYB-210 Module 7 Project Two
  • CYB-210 Module 7 Project Two

  • Exam (elaborations) • 17 pages • 2023
  • Available in package deal
  • CYB-210 Module 7 Project Two. This project was a little more tricker than the other one. With this project we were given 3 networks. Networks A and B needed to be connected into one with a new network scheme. Network 3 and the new network needed to be connected together. With this being said I added a third switch to account for future expansion. I kept the two switches we were given for subnet 1 and 2 and added a third to connect the networks to that switch and then into the router. Doing ...
    (0)
  • $17.49
  • + learn more
CYB-210 Project One Computer Network Modification
  • CYB-210 Project One Computer Network Modification

  • Exam (elaborations) • 13 pages • 2023
  • Available in package deal
  • CYB-210 Project One Computer Network Modification. To place the ports, they are connected to within the appropriate VLAN 70 and 80. Figure 2 is the VLAN table showing both VLAN 70 and 80 active have been added with switch ports assigned Fa0/1, Fa0/2 and Fa0/3. This is done with the CLI command on the switch or under ConfigINTERFACEFastEthernet ports. I use the command on CLI. Click on CLIenable command, then hit enter. First, configure the appropriate ports on switch. Looking at t...
    (0)
  • $17.49
  • + learn more
CYB-210 Project One Computer Network Modification Brief
  • CYB-210 Project One Computer Network Modification Brief

  • Exam (elaborations) • 13 pages • 2023
  • Available in package deal
  • CYB-210 Project One Computer Network Modification Brief. A. Properly configure the VLAN for guest and video connections: VLANs are configure under Config tab or by CLI command. Selecting the switch and clicking on the ConfigVLAN Database, adding to VLAN 70 – Guest for wireless router and VLAN 80 – Video for camera (See Figure 1). This can be done on CLI, I choose the GUI since the function there.
    (0)
  • $18.49
  • + learn more
CYB-210 Project Two: Network Diagram and Rationale
  • CYB-210 Project Two: Network Diagram and Rationale

  • Exam (elaborations) • 12 pages • 2023
  • CYB-210 Project Two: Network Diagram and Rationale. CYB-210 Project Two: Network Diagram and Rationale
    (0)
  • $28.49
  • + learn more
CYB-210 Project Two: Network Diagram and Rationale
  • CYB-210 Project Two: Network Diagram and Rationale

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • CYB-210 Project Two: Network Diagram and Rationale. In this scenario we are tasked with combining Subnet1 and Subnet2 into NetworkA, configure static routing between NetworkA and Network3 configure DHCP and DNS services, and NAT configuration for ping capabilities and communication between the networks. To start I decide to delete Subnet2 and shut down the unused port FA0/1 on the Subnet_Router for better security. I than moved all the computers and printers from Subnet2 to Subnet1 and reco...
    (0)
  • $21.49
  • + learn more