Design bid build - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Design bid build? On this page you'll find 601 study documents about Design bid build.
Page 4 out of 601 results
Sort by
-
AEC 300 EXAM 2024/2025 WITH GUARANTEED ACCURATE ANSWERS |VERIFIED
- Exam (elaborations) • 20 pages • 2024
-
- $11.99
- + learn more
AEC 300 EXAM 2024/2025 
AEC 300 EXAM 2024/2025 WITH GUARANTEED ACCURATE ANSWERS |VERIFIED 
 
 
Singular responsibility for both design and construction was first codified: 
 
In 1996. 
 
By the Master Builders. 
 
During the Industrial Revolution. 
 
By Hammurabi. - ACCURATE ANSWERBy Hammurabi. 
 
Successful Design-Build requires: 
 
Trust and flexibility between participants. 
 
An indirect relationship with the designer. 
 
An increase in change orders. 
 
Control of the design. - ACCURATE AN...
-
DBIA: Principles of Design-Build and Post Award & Contracts
- Exam (elaborations) • 8 pages • 2024
-
- $12.49
- + learn more
Miller Act 1935 - Answer-Federal Government passed bond requiring payment and performance bonds on all public works, what year? 
 
Brooks Bill 1972 - Answer-Bill directing A/E's selected on qualifications, what year? 
 
Clinger Cohen Act/Defense Procurement Reform Act 1996 - Answer-Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. 
 
Standard of Care - Answer-The level of quality that any average Design Professional would b...
-
DBIA Test Study Questions and Answers with Complete Solutions Updated 2024
- Exam (elaborations) • 14 pages • 2024
-
- $15.49
- + learn more
How team members are organized, establishes when parties engage, determines roles of parties, and determines sequence of design, procurement, and construction (db, cmar, dbb) - Project Delivery System 
 
how team members are selected (QBS, best value, low price, sole source) - Procurement Method 
 
how team members are paid (fp, gmp, cost reimbursement, target price, unit price) - contracting approach 
 
linear, sequential process, A/E selected on qualifications, GC selected on low price, design...
-
CONSTRUCTION MANAGEMENT PRACTICE TEST WITH COMPLETE SOLUTIONS 100% 2023/2024
- Exam (elaborations) • 11 pages • 2024
-
- $10.59
- + learn more
CONSTRUCTION MANAGEMENT PRACTICE TEST WITH COMPLETE SOLUTIONS 100% 2023/2024 
Based on the guide quantity of 100 CY on a bid document for rock excavation, a contractor bid a unit price of $20/CY. If the owner's representative determined that the contractor excavated 85 CY of rock during construction, how much will the contractor get paid? 
(a). $2000 
(b). $1700 
(c). $300 
(d). $1800 
(b) 
 
 
Which of the following documents are included in the bid package? 
I. Proposal Form 
II. Special Cond...
-
Construction Management 3014 Virginia Tech Exam 1 Already Passed
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Construction Management 3014 Virginia 
 
Tech Exam 1 Already Passed 
 
construction industry vs. manufacturing manufacturing produces products and then sells. 
construction starts with a customer need and the product is built to fill the need. 
 
sectors of construction industry (4) infrastructure, commercial, residential, industrial 
 
main players in construction project (3) owner, designer, constructor 
 
stages of construction lifecycle 1)need 
2)programming 
3)schematic design 
4)detailed d...
Make study stress less painful
-
CMGT 360 Final (Exam 3) Questions And Answers Well Elaborated/2024.
- Exam (elaborations) • 25 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
Design-Build - correct answer a method of project delivery in 
which one entity (design-builder) forges a 
single contract with the Owner to provide for 
architectural engineering design services 
and construction services 
 
Design-Build Entity Configurations - correct answer • Contractor Led 
• A/E Led 
• Integrated Firm 
• Developer Led 
• Joint Venture 
 
Competitive Solicitation 
& Basis ...
-
Construction Contracts Midterm Set Test Questions And Verified Solutions
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Construction Contracts Midterm 
Set Test Questions And Verified 
Solutions 
This term means the management or handling of the business 
relations between parties to a contract - ANSWER : contract 
administration 
This term refers to a much broader responsibility of relating to all 
project-related functions between the parties to a contract - 
ANSWER : construction administration 
Project delivery system is defined as... - ANSWER : an 
approach to building the project team. an organization...
-
CNST 2341 Final || with A+ Guaranteed Solutions.
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $11.29
- + learn more
3 methods of payment common in the construction industry correct answers - Lump sum 
- Unit price 
- Cost plus 
Most common 
 
Lump sum correct answers a single payment made at a particular time 
 
Unit Price correct answers the cost per unit. 
Mostly used between contractor and subcontractor 
 
Cost Plus correct answers A contract where payment is for material and labor, with a profit factor added. 
Used when you are uncertain what the price will be. 
Renovation 
 
Methods to deliver a projec...
-
Construction Contracts Midterm Study Guide (A+ Graded already)
- Exam (elaborations) • 15 pages • 2024
-
- $7.99
- + learn more
this term means the management or handling of the business relations between 
parties to a contract - CORRECT ANSWER-contract administration 
this term refers to a much broader responsibility of relating to all project-related 
functions between the parties to a contract - CORRECT ANSWER-construction 
administration 
project delivery system is defined as... - CORRECT ANSWER-an approach to 
building the project team. an organizational concept which assigns specific 
responsibilities and authoriti...
-
DBIA TEST QUESTIONS AND ANSWERS
- Exam (elaborations) • 10 pages • 2024
-
- $12.49
- + learn more
Project Delivery System - Answer-How team members are organized, establishes when parties engage, determines roles of parties, and determines sequence of design, procurement, and construction (db, cmar, dbb) 
 
Procurement Method - Answer-how team members are selected (QBS, best value, low price, sole source) 
 
contracting approach - Answer-how team members are paid (fp, gmp, cost reimbursement, target price, unit price) 
 
Design-Bid-Build (DBB) - Answer-linear, sequential process, A/E selecte...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia