Gas piping test Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Gas piping test? On this page you'll find 653 study documents about Gas piping test.

Page 4 out of 653 results

Sort by

NFPA-99: Practice Test Questions And Answers
  • NFPA-99: Practice Test Questions And Answers

  • Exam (elaborations) • 16 pages • 2024
  • NFPA-99: Practice Test Questions And Answers Under which of these conditions shall the instrument Air Reserve header cylinders be permitted to be stored with the instrument air compressor? A) the mechanical equipment room does not contain a boiler. B) the medical air compressors are in the same room. C) the only motor-driven machinery in the room is for instrument air equipment. D) the room is secured with lockable doors. - ANS C) The only motor-driven machinery in the room is for ...
    (0)
  • $13.49
  • + learn more
NFPA 99 2024 Practice Test Questions:  Worksheet 1 Already Passed
  • NFPA 99 2024 Practice Test Questions: Worksheet 1 Already Passed

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • NFPA 99 2024 Practice Test Questions: Worksheet 1 Already Passed Categories shall be determined by following and documenting a defined risk assessment procedure. a) True b) False True 4.2.2 Facility systems in which failure of such equipment is likely to cause minor injury to patients or caregivers shall be designed to meet what category __________? a) 1 b) 2 c) 3 d) 4 Category 2 4.1.2 What facility, building, or structure is used to house chambers and all auxiliary servi...
    (0)
  • $9.99
  • + learn more
LP-gas Texas bobtail exam 2024 with 100% correct answers
  • LP-gas Texas bobtail exam 2024 with 100% correct answers

  • Exam (elaborations) • 14 pages • 2024
  • required for all piping systems that serve _______ psig appliance systems. normally operated at 11 in WC pressure - correct answer 1/2 required for all piping systems that serve 1/2 psig appliance systems. normally operated at ______ in WC pressure - correct answer 11 above group LP-gas containers must not be located within ____ feet of the vertical plane beneath overhead electric power lines that are over _____ volts - correct answer 6 600 Fire Extinquishers must have minimum c...
    (0)
  • $15.49
  • + learn more
California UST Service Technician Part 1 Exam Questions and Answers UpdateDd 2024/2025 (100% SOLVED)
  • California UST Service Technician Part 1 Exam Questions and Answers UpdateDd 2024/2025 (100% SOLVED)

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • California UST Service Technician Part 1 Exam Questions and Answers UpdateDd 2024/2025 (100% SOLVED) July 1 2005, service techs shall possess or work under someone who has a current certification indicating he or she has passed the ? - correct answers California UST service technician exam ICC cert must be renewed every? - correct answers 24 months Service techs must posses or be employed by a person who has the appropriate contractors license unless? - correct answers The individual has ...
    (0)
  • $16.49
  • + learn more
MCC-NH Gas Fitters Exam
  • MCC-NH Gas Fitters Exam

  • Exam (elaborations) • 16 pages • 2024
  • MCC-NH Gas Fitters Exam What is the minimum percentage needed to pass a written test for each specialty license? 70% What is the first tier to the specialty license? Gas Piping Installer How many hours of educational training are required for the first specialty license? 60 Hours (Safemec 305.02) How many hours of on-job-training are required for the first specialty license? 1000 Hours (Safemec 305.02) What is the second tier to the specialty license? Fuel Gas I...
    (0)
  • $10.39
  • + learn more
High Pressure Steam Exam Nyc Boiler  License Exam With Verified Answers
  • High Pressure Steam Exam Nyc Boiler License Exam With Verified Answers

  • Exam (elaborations) • 20 pages • 2024
  • High Pressure Steam Exam Nyc Boiler License Exam With Verified Answers 1 The maximum blow down for a safety valve on a forced flow steam generator or high temperature water boiler shall be of what percent of the set pressure? - CORRECT ANSWER-10%. HP Code: 14-9.12 3 Who oversees the code for any plumbing installations? - CORRECT ANSWER-The NYC Plumbing Code NYC Mech: 1002.1 4 When will anchorage or guides be inspected? - CORRECT ANSWER-Annually. NYC Mech: 1210.3.1.2 5 How many bras...
    (0)
  • $15.49
  • + learn more
NFPA-99: Practice Test Questions and Answers Graded A 2024
  • NFPA-99: Practice Test Questions and Answers Graded A 2024

  • Exam (elaborations) • 15 pages • 2024
  • Under which of these conditions shall the instrument Air Reserve header cylinders be permitted to be stored with the instrument air compressor? A) the mechanical equipment room does not contain a boiler. B) the medical air compressors are in the same room. C) the only motor-driven machinery in the room is for instrument air equipment. D) the room is secured with lockable doors. - C) The only motor-driven machinery in the room is for the instrument air equipment Riser valves are those val...
    (0)
  • $12.49
  • + learn more
Plumbing Test Questions And Answers With Complete Solutions
  • Plumbing Test Questions And Answers With Complete Solutions

  • Exam (elaborations) • 24 pages • 2023
  • Available in package deal
  • Which of the following traps are permitted by special permission? A. bell B. S C. drum D. crown vented trap correct answer: C A roof mounted ari conditioner unit is condensing at the rate of 5 GPM. How much DFU? A. 4 B. 5 C. 10 D. 12 correct answer: B According to the International Plumbing Code, when plastic piping is installed in a concealed location and passing through a stud joist or rafter, the piping may not pass any closer than ___ inches from the edge of the wood member. ...
    (0)
  • $12.99
  • + learn more
Plumbing Test with complete solutions
  • Plumbing Test with complete solutions

  • Exam (elaborations) • 27 pages • 2023
  • Available in package deal
  • Plumbing Test with complete solutions Which of the following traps are permitted by special permission? A. bell B. S C. drum D. crown vented trap - ANSWER ️️ C A roof mounted ari conditioner unit is condensing at the rate of 5 GPM. How much DFU? A. 4 B. 5 C. 10 D. 12 - ANSWER ️️ B According to the International Plumbing Code, when plastic piping is installed in a concealed location and passing through a stud joist or rafter, the piping may not pass any closer than ___ inche...
    (0)
  • $12.49
  • + learn more
Nfpa 99 Practice Test Questions And  Answers 2024/2025
  • Nfpa 99 Practice Test Questions And Answers 2024/2025

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • Nfpa 99 Practice Test Questions And Answers 2024/2025 Under which of these conditions shall the instrument Air Reserve header cylinders be permitted to be stored with the instrument air compressor? A) the mechanical equipment room does not contain a boiler. B) the medical air compressors are in the same room. C) the only motor-driven machinery in the room is for instrument air equipment. D) the room is secured with lockable doors. - CORRECT ANSWER-C) The only motordriven machinery in ...
    (0)
  • $14.99
  • + learn more