Interception by leaves - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Interception by leaves? On this page you'll find 61 study documents about Interception by leaves.
Page 4 out of 61 results
Sort by
-
CE 391 Spring 2022 Final Exam Word Bank, CE 391 Final Exam
- Exam (elaborations) • 5 pages • 2023
-
- $10.99
- + learn more
CE 391 Spring 2022 Final Exam Word Bank, CE 391 Final Exam 
WEIRS 
Small dam built across river to control the upstream water level 
FLUMES 
Human-made channel for water, in the form of an open decline gravity chute whose walls are raised above the surrounding terrain 
STAGE DISCHARGE 
Relationship between the amount of water flowing in a river or stream and stage at any particular point 
INTERCEPTION 
The storage and subsequent evaporation of rainfall by above-ground structures 
THROUGHFALL 
Th...
-
FE Exam Concepts with 100% correct answers 2024
- Exam (elaborations) • 32 pages • 2024
-
- $7.99
- + learn more
Aquifer - answer-underground geologic unit that is saturated with water which contains sufficient permeability to yield the water to wells. 
 
Unconfined aquifer - answer-Water surface is at atmospheric pressures. 
 
Confined aquifer - answer-Aquifer that is confined by an impermeable material, such as clay or shale, resulting in the aquifer being under pressure. 
 
Permeability - answer-A measure of the ability to transmit fluids based on the material within the aquifer. 
 
Transmissivity - ans...
-
CE 391 Spring 2022 Final Exam Word Bank, CE 391 Final Exam
- Exam (elaborations) • 5 pages • 2023
-
- $9.49
- + learn more
CE 391 Spring 2022 Final Exam Word Bank, CE 391 Final Exam 
WEIRS 
Small dam built across river to control the upstream water level 
FLUMES 
Human-made channel for water, in the form of an open decline gravity chute whose walls are raised above the surrounding terrain 
STAGE DISCHARGE 
Relationship between the amount of water flowing in a river or stream and stage at any particular point 
INTERCEPTION 
The storage and subsequent evaporation of rainfall by above-ground structures 
THROUGHFALL 
Th...
-
CE 391 Spring 2022 Final Exam Word Bank, CE 391 Final Exam
- Exam (elaborations) • 5 pages • 2023
-
- $9.49
- + learn more
CE 391 Spring 2022 Final Exam Word Bank, CE 391 Final Exam 
WEIRS 
Small dam built across river to control the upstream water level 
FLUMES 
Human-made channel for water, in the form of an open decline gravity chute whose walls are raised above the surrounding terrain 
STAGE DISCHARGE 
Relationship between the amount of water flowing in a river or stream and stage at any particular point 
INTERCEPTION 
The storage and subsequent evaporation of rainfall by above-ground structures 
THROUGHFALL 
Th...
-
Pearson Edexcel Mark Scheme (Results) Summer 2022 Pearson Edexcel GCSE In Geography Spec B (l GBO) Paper 03 Mark Scheme (Results) Summer 2022 Pearson Edexcel GCSE In Geography Spec B (1GB0) Paper 03 Edexcel and BTEC Qualifications
- Exam (elaborations) • 16 pages • 2023
-
- $7.99
- + learn more
Pearson 
Edexcel 
Mark Scheme (Results) 
Summer 2022 
Pearson Edexcel GCSE 
In Geography Spec B (l GBO) Paper 03 
Mark Scheme (Results) 
Summer 2022 
Pearson Edexcel GCSE 
In Geography Spec B (1GB0) Paper 03 
Edexcel and BTEC Qualifications 
Edexcel and BTEC qualifications are awarded by Pearson, the UK’s largest awarding body. We 
provide a wide range of qualifications including academic, vocational, occupational and specific 
programmes for employers. For further information visit our qualif...
Get paid weekly? You can!
-
CE 391 Spring 2022 Final Exam Word Bank, CE 391 Final Exam
- Exam (elaborations) • 5 pages • 2023
-
- $9.49
- + learn more
CE 391 Spring 2022 Final Exam Word Bank, CE 391 Final Exam 
WEIRS 
Small dam built across river to control the upstream water level 
FLUMES 
Human-made channel for water, in the form of an open decline gravity chute whose walls are raised above the surrounding terrain 
STAGE DISCHARGE 
Relationship between the amount of water flowing in a river or stream and stage at any particular point 
INTERCEPTION 
The storage and subsequent evaporation of rainfall by above-ground structures 
THROUGHFALL 
Th...
-
CE 391 Spring 2022 Final Exam Word Bank, CE 391 Final Exam
- Exam (elaborations) • 5 pages • 2022
-
- $8.49
- + learn more
CE 391 Spring 2022 Final Exam Word Bank, CE 391 Final Exam 
WEIRS 
Small dam built across river to control the upstream water level 
FLUMES 
Human-made channel for water, in the form of an open decline gravity chute whose walls are raised above the surrounding terrain 
STAGE DISCHARGE 
Relationship between the amount of water flowing in a river or stream and stage at any particular point 
INTERCEPTION 
The storage and subsequent evaporation of rainfall by above-ground structures 
THROUGHFALL 
Th...
-
CE 391 Spring 2022 Final Exam Word Bank, CE 391 Final Exam
- Exam (elaborations) • 5 pages • 2023
-
- $17.77
- + learn more
CE 391 Spring 2022 Final Exam Word Bank, CE 391 Final Exam 
WEIRS 
Small dam built across river to control the upstream water level 
FLUMES 
Human-made channel for water, in the form of an open decline gravity chute whose walls are raised above the surrounding terrain 
STAGE DISCHARGE 
Relationship between the amount of water flowing in a river or stream and stage at any particular point 
INTERCEPTION 
The storage and subsequent evaporation of rainfall by above-ground structures 
THROUGHFALL 
Th...
-
CE 391 Spring Final Exam Word Bank, CE 391 Final Exam with Complete Verified Solution
- Exam (elaborations) • 5 pages • 2024
-
- $11.49
- + learn more
CE 391 Spring Final Exam Word Bank, CE 391 Final Exam 
WEIRS 
Small dam built across river to control the upstream water level 
FLUMES 
Human-made channel for water, in the form of an open decline gravity chute whose walls are raised above the surrounding terrain 
STAGE DISCHARGE 
Relationship between the amount of water flowing in a river or stream and stage at any particular point 
INTERCEPTION 
The storage and subsequent evaporation of rainfall by above-ground structures 
THROUGHFALL 
The pr...
-
CE 391 Spring 2022 Final Exam Word Bank, CE 391 Final Exam
- Exam (elaborations) • 5 pages • 2024
-
- $10.49
- + learn more
CE 391 Spring 2022 Final Exam Word Bank, CE 391 Final Exam 
WEIRS 
Small dam built across river to control the upstream water level 
FLUMES 
Human-made channel for water, in the form of an open decline gravity chute whose walls are raised above the surrounding terrain 
STAGE DISCHARGE 
Relationship between the amount of water flowing in a river or stream and stage at any particular point 
INTERCEPTION 
The storage and subsequent evaporation of rainfall by above-ground structures 
THROUGHFALL 
Th...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia