Mobile cranes no 1 exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Mobile cranes no 1 exam? On this page you'll find 49 study documents about Mobile cranes no 1 exam.
Page 4 out of 49 results
Sort by
-
ASSOCIATE CONSTRUCTOR EXAM | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+
- Exam (elaborations) • 47 pages • 2024
-
- $15.49
- + learn more
1 
ASSOCIATE CONSTRUCTOR EXAM | 
QUESTIONS & ANSWERS (VERIFIED) | 
LATEST UPDATE | GRADED A+ 
AIC Stands For? 
Correct Answer: American Institute of Constructors 
AICCCC Stands For? 
Correct Answer: AIC Constructor Certification Commission 
Associate Constructor Exam an individual will be awarded the _______ credential. 
Correct Answer: Associate Constructor (AC) 
Associate Constructors can only maintain their designation for ____ years. 
Correct Answer: 10 
Oral communication is the exchange...
-
General crane safety Exam Questions And Answers Solved 100 Correct
- Exam (elaborations) • 29 pages • 2024
-
- $12.49
- + learn more
General crane safety Exam Questions And Answers Solved 100% Correct. 
The minimum crane team for a mobile crane on outriggers would consist of- 
A) The Crane Operator, Rigger Supervisor, and Crane Rigger 
B) The Crane Operator, Crane Supervisor, Rigger Supervisor, and 
Crane Rigger 
C) The Crane Operator, Crane Supervisor, and Crane Rigger 
D) The Crane Operator and Rigger-in-Charge 
E) The Crane Operator, Crane Walker, and Crane Rigger 
When operating floating cranes, you must start swinging or...
-
GENERAL CRANE SAFETY EXAM 2024-2025 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES
- Exam (elaborations) • 40 pages • 2024
-
- $12.49
- + learn more
GENERAL CRANE SAFETY EXAM ACTUAL 
EXAM 100 QUESTIONS AND CORRECT DETAILED 
ANSWERS WITH RATIONALES 
The minimum crane team for a mobile crane on outriggers would consist of- 
A) The Crane Operator, Rigger Supervisor, and Crane Rigger 
B) The Crane Operator, Crane Supervisor, Rigger Supervisor, and 
Crane Rigger 
C) The Crane Operator, Crane Supervisor, and Crane Rigger 
D) The Crane Operator and Rigger-in-Charge 
E) The Crane Operator, Crane Walker, and Crane Rigger - Answer️️ -C) The Crane...
-
OSHA 10: Occupational Safety and Health Administration Final Exam| Questions with Verified Answers| (Updated 2023/ 2024)
- Exam (elaborations) • 25 pages • 2023
- Available in package deal
-
- $10.59
- + learn more
OSHA 10: Occupational Safety and Health Administration Final Exam| Questions with Verified Answers| (Updated 2023/ 2024) 
 
1.	True or False: There is usually some form of warning before a cave-in. 
 
 
~	Answer: False 
 
 
 
2.	OSHA requires that all excavations in which employees could potentially be exposed to cave-ins be protected by one or more of the following three methods: 
 
 
~	Answer: Sloping, benching, shoring and shielding (Your Answer) 
 
 
 
3.	The formula for all simple slope exc...
-
OECP Test Exam Questions With Correct And Revised Answers
- Exam (elaborations) • 26 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
©THEBRIGHTSTARS 2024 
OECP Test Exam Questions With Correct 
And Revised Answers. 
The offset of the jib has been changed from 25 degree to 15 degree. The capacity of the jib will? 
A. Stay the same 
B. Decrease 
C. Offset can't change 
D. Increase - answerD. Increase 
When lifting near capacity with a crawler, the lowest ground pressure between center pin and the 
load will be? 
A. Over the front 
B. Over the corner 
C. Over the side 
D. Over the rear - answerC. Over the side 
A Truck mounted...
Want to regain your expenses?
-
General crane safety EXAM Sample Questions And Solutions
- Exam (elaborations) • 21 pages • 2024
-
- $12.49
- + learn more
General crane safety EXAM Sample 
Questions And Solutions 
 
 
 All of the following require a license to operate EXCEPT a(n)- 
A) Cab-operated category 3 bridge crane 
B) Mobile hydraulic truck crane 
C) Non-cab operated category 3 bridge crane 
D) Articulating boom category 4 crane 
E) Floor-operated category 2 bridge crane - ANSWER C) Non-cab operated category 3 
bridge crane 
 
 Which of the following lift types would NOT be considered a complex lift? 
A) Multiple-crane lifts 
...
-
Mass 1A Hoisting Study Guide Exam Questions And Answers. Verified And Updated.
- Exam (elaborations) • 23 pages • 2024
-
- $12.49
- + learn more
Mass 1A Hoisting Study Guide Exam 
Questions And Answers. Verified And 
Updated. 
Where should a license or temporary permit be located during time of operation of equipment - 
answerShall be carried ON the person at all times; in the case of a temporary permit the 
person shall also carry their drivers license 
Whats the fine for violating section 53, 53a or 54 - answerNo less than $500 and no more 
than $3,000, or by imprisonment of no more than 3 months, or both fine and imprisonment 
Whats t...
-
AIC EXAM | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+
- Exam (elaborations) • 130 pages • 2024
- Available in package deal
-
- $18.49
- + learn more
1 
AIC EXAM | QUESTIONS & ANSWERS 
(VERIFIED) | LATEST UPDATE | GRADED 
A+ 
. What percentage of conversations do 
listeners remember of what they hear? 
A. 10% 
B. 30% 
C. 50% 
D. 90% 
Correct Answer: 10% 
What percentage of conversations do 
speakers remember of what they say and 
do? 
A. 30% 
B. 50% 
C. 70% 
D. 90% 
Correct Answer: 90% 
2 
When giving presentations, people should do 
which of the following? 
A. present extra information beyond their 
primary goal to demonstrate their 
expe...
-
NCCCO MOBILE CRANE EXAM QUESTIONS WITH CORRECT ANSWERS
- Exam (elaborations) • 11 pages • 2024
-
- $9.49
- + learn more
NCCCO MOBILE CRANE 
EXAM QUESTIONS WITH 
CORRECT ANSWERS 
 
1. What action does a signal person intend the operator to perform if he extends his arm 
at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - Answer-c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom 
crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - Answer-a. 
3. The l...
-
NCCCO RIGGING 1 & 2 Exam Questions with Correct Answers
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $12.89
- + learn more
NCCCO RIGGING 1 & 2 Exam Questions with Correct Answers 
OSHA 1910 - Answer-General Industry Standards 
 
OSHA 1926 - Answer-Construction Industry Standards 
 
OSHA 1910.180 - Answer-Crawler, Locomotive and Truck Cranes 
 
OSHA 1910.184 - Answer-Slings 
 
OSHA 1926.251 - Answer-Rigging Equipment used for material handling 
 
OSHA 1926.1400 - Answer-Cranes and Derricks used in construction 
 
ASME B30.3 - Answer-Tower Cranes 
 
ASME B30.5 - Answer-Mobile and Locomotive Cranes 
 
ASME B30.9 - Ans...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia