Nccco 5 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco 5? On this page you'll find 180 study documents about Nccco 5.

Page 4 out of 180 results

Sort by

NCCCO 5 Questions Answers 2024
  • NCCCO 5 Questions Answers 2024

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • NCCCO 5
    (0)
  • $14.49
  • + learn more
NCCCO MOBILE CRANE / NCCCO  MOBILE CRANE EXAM 2023- 2024 ACTUAL EXAM 100  QUESTIONS AND CORRECT  DETAILED ANSWERS VERIFIED  ANSWERS GRADED A+
  • NCCCO MOBILE CRANE / NCCCO MOBILE CRANE EXAM 2023- 2024 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS VERIFIED ANSWERS GRADED A+

  • Exam (elaborations) • 29 pages • 2024
  • NCCCO MOBILE CRANE / NCCCO MOBILE CRANE EXAM 2023- 2024 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS VERIFIED ANSWERS GRADED A+ 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - ANSWER-c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gro...
    (0)
  • $22.99
  • + learn more
NCCCO TWR Practice Test Study Guide  Exam with 100% Verified Answers
  • NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers

  • Exam (elaborations) • 11 pages • 2024
  • NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers 1. Which of the following OSHA regulations govern suspended personnel platforms? - CORRECT ANSWER-OSHA 1926.550(g) 2. According to ASME B30.3, the prohibited zone for power lines that are 60kV is? - CORRECT ANSWER-15ft 3. According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of? - CORRECT ANSWER-5 to 1 4. According to ASME B30.3, when lifting a suspended personnel platform the design fa...
    (0)
  • $13.49
  • + learn more
Nccco Core + Specialty Test Prep | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
  • Nccco Core + Specialty Test Prep | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • Nccco Core + Specialty Test Prep | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+ ASME B30.5 - Answer -Mobile and Locomotive cranes, all types ASME B30.3 - Answer -Tower Cranes ASME B30.23 - Answer -Personel Lifting Regs OSHA 29 CFR 1926.1400 Series - Answer -Cranes & Derrick's used in Construction regs. Rotation Resistant Wire Rope - Answer -2 randomly broken wires in 6 diameters. 4 randomly broken wires in 30 diameters. Safety factor 5.0 Safety factor perso...
    (0)
  • $11.99
  • + learn more
NCCCO Overhead Crane Exam (2023/ 2024) Questions and 100% Correct Verified Answers| Grade A
  • NCCCO Overhead Crane Exam (2023/ 2024) Questions and 100% Correct Verified Answers| Grade A

  • Exam (elaborations) • 20 pages • 2023
  • Available in package deal
  • NCCCO Overhead Crane Exam (2023/ 2024) Questions and 100% Correct Verified Answers| Grade A Q: According to OSHA, the rated capacity of all overhead cranes shall be? Answer: clearly marked on the side of the crane Q: When attaching spreaders to any load, you must keep in mind of what? Answer: the lower the spreader angle the greater the tension Q: What is the order of hitch strength? Answer: basket, vertical, choker Q: According to OSHA, the maximum hook...
    (0)
  • $10.49
  • + learn more
NCCCO Overhead Crane Questions and 100%Correct Answers.
  • NCCCO Overhead Crane Questions and 100%Correct Answers.

  • Exam (elaborations) • 8 pages • 2024
  • NCCCO Overhead Crane Questions and 100%Correct Answers. Overhead cranes with more than one hoisting unit shall have? correct answers Its rated load marked on it. How often does O.S.H.A. require a written wire rope inspection? correct answers Once a month What is the purpose of the "E" (Emergency) stop on an overhead crane? correct answers Removes power to entire crane. Most loads should be rigged to within how many degrees of level? correct answers 5 According to ASME B30.2, what is the...
    (0)
  • $12.99
  • + learn more
NCCCO Overhead Crane Questions and 100%Correct Answers.
  • NCCCO Overhead Crane Questions and 100%Correct Answers.

  • Exam (elaborations) • 8 pages • 2024
  • NCCCO Overhead Crane Questions and 100%Correct Answers. Overhead cranes with more than one hoisting unit shall have? correct answers Its rated load marked on it. How often does O.S.H.A. require a written wire rope inspection? correct answers Once a month What is the purpose of the "E" (Emergency) stop on an overhead crane? correct answers Removes power to entire crane. Most loads should be rigged to within how many degrees of level? correct answers 5 According to ASME B30.2, what is the...
    (0)
  • $12.99
  • + learn more
NCCCO MOBILE CRANE EXAM | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
  • NCCCO MOBILE CRANE EXAM | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • NCCCO MOBILE CRANE EXAM | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+ 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - Answer -c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1%...
    (0)
  • $12.49
  • + learn more
NCCCO Overhead Crane Exam Questions with 100% Verified Correct Answers Rated A+
  • NCCCO Overhead Crane Exam Questions with 100% Verified Correct Answers Rated A+

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • NCCCO Overhead Crane Exam Questions with 100% Verified Correct Answers Rated A+ Overhead cranes with more than one hoisting unit shall have what? - Correct Answer its rated load marked on it What is the purpose of the "E" (Emergency) stop on an overhead crane? - Correct Answer removes power to entire crane How often does O.S.H.A. require a written wire rope inspection? - Correct Answer once a month Most loads should be rigged to within how many degrees of level? - Correct Answer five...
    (0)
  • $10.49
  • + learn more
NCCCO CORE EXAM QUESTIONS WITH COMPLETE SOLUTIONS 2024/2025
  • NCCCO CORE EXAM QUESTIONS WITH COMPLETE SOLUTIONS 2024/2025

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • NCCCO CORE EXAM QUESTIONS WITH COMPLETE SOLUTIONS 2024/2025 Before leveling a mobile crane on outriggers, an operator should ensure: - Correct Answer there is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - Correct Answer Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - Correct Answer Separate the boo...
    (0)
  • $11.49
  • + learn more