Operations mws - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Operations mws? On this page you'll find 39 study documents about Operations mws.

Page 4 out of 39 results

Sort by

Water Shuttle Operations QUESTIONS WITH COMPLETE SOLUTIONS
  • Water Shuttle Operations QUESTIONS WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 4 pages • 2023
  • Available in package deal
  • You've been asked to help prepare a pre-incident plan for water shuttle operations that may be needed at a small factory in your jurisdiction. The best choice for the route of travel between the fill site and the dump site is: correct answer: A five-mile, circular route where the leg from the fill site would be downhill and the leg from the dump site would be uphill. You've been asked to help with pre-incident planning of water shuttle operations in your jurisdiction. First, you'll need t...
    (0)
  • $11.49
  • + learn more
Practice Test NERC Questions and Correct Answers (GRADED A+)
  • Practice Test NERC Questions and Correct Answers (GRADED A+)

  • Exam (elaborations) • 48 pages • 2023
  • Available in package deal
  • A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? The phase angle will increase. When load is increased phase angle will increase. A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? 90 pf= mw/mva The high side of a delta-wye connection transformer is connected to a power s...
    (0)
  • $11.99
  • + learn more
 NERC Additional Test Questions With Correct Answers
  • NERC Additional Test Questions With Correct Answers

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • 1. Balancing Authority A is importing MW and has a tie-Iine flowing into them when the meter fails to zero. Which of the following statements is true? A) The Balancing Authority's frequency will drop B) The Balancing Authority's generators on AGC will decrease output C) The Balancing Authority's frequency will increase D) The Balancing Authority's ACE reading will decrease - Answer B) The Balancing Authority's generators on AGC will decrease output 2. Balancing Authority A has tie-li...
    (0)
  • $10.99
  • + learn more
KNOWN NERC EXAM QUESTIONS: From Class with complete solution 2023
  • KNOWN NERC EXAM QUESTIONS: From Class with complete solution 2023

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • KNOWN NERC EXAM QUESTIONS: From Class with complete solution 2023A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the ca...
    (0)
  • $10.99
  • + learn more
NERC Study Questions | ACTUAL QUESTIONS AND ANSWERS | LATEST 2023/24
  • NERC Study Questions | ACTUAL QUESTIONS AND ANSWERS | LATEST 2023/24

  • Exam (elaborations) • 56 pages • 2023
  • NERC Study Questions | ACTUAL QUESTIONS AND ANSWERS | LATEST 2023/24 1. Balancing Authority A is importing MW and has a tie-Iine flowing into them when the meter fails to zero. Which of the following statements is true? A) The Balancing Authority's frequency will drop B) The Balancing Authority's generators on AGC will decrease output C) The Balancing Authority's frequency will increase D) The Balancing Authority's ACE reading will decrease B) The Balancing Authority's generators on...
    (0)
  • $9.49
  • + learn more
MH-60R NATOPS  100% Correct Answers  Verified  Latest 2024 Version
  • MH-60R NATOPS 100% Correct Answers Verified Latest 2024 Version

  • Exam (elaborations) • 15 pages • 2024
  • MH-60R NATOPS | 100% Correct Answers | Verified | Latest 2024 Version What is the fuel dump rate - 800lbs per minute What does AVCS stand for - Active vibration control system How much of the rescue hoist cable is painted bright orange - First and last 20ft What is the minimum pressure to jettison all buoys - 1100psi When does the rescue hoist slow down to 50fpm - 10ft from full up 5ft from full down How many feet of cable does the AQS-22 have - 2550ft Fire extinguishers have a continuo...
    (0)
  • $7.99
  • + learn more
NERC STUDY QUESTIONS WITH 100% CORRECT ANSWERS ALREADY GRADED A+
  • NERC STUDY QUESTIONS WITH 100% CORRECT ANSWERS ALREADY GRADED A+

  • Exam (elaborations) • 42 pages • 2023
  • Available in package deal
  • Classic Live Checkpoint Self-study activity Flashcards Learn Test Match 1. Balancing Authority A is importing MW and has a tie-Iine flowing into them when the meter fails to zero. Which of the following statements is true? A) The Balancing Authority's frequency will drop B) The Balancing Authority's generators on AGC will decrease output C) The Balancing Authority's frequency will increase D) The Balancing Authority's ACE reading will decrease B) The Balancing Authority's ...
    (0)
  • $13.99
  • + learn more
ADDITIONAL NERC TEST QUESTIONS WITH 100% CORRECT ANSWERS.
  • ADDITIONAL NERC TEST QUESTIONS WITH 100% CORRECT ANSWERS.

  • Exam (elaborations) • 22 pages • 2023
  • Available in package deal
  • 1. Balancing Authority A is importing MW and has a tie-Iine flowing into them when the meter fails to zero. Which of the following statements is true? A) The Balancing Authority's frequency will drop B) The Balancing Authority's generators on AGC will decrease output C) The Balancing Authority's frequency will increase D) The Balancing Authority's ACE reading will decrease B) The Balancing Authority's generators on AGC will decrease output 2. Balancing Authority A has tie-line m...
    (0)
  • $14.99
  • + learn more
nerc miss question and answers latest 2023
  • nerc miss question and answers latest 2023

  • Exam (elaborations) • 8 pages • 2023
  • nerc miss question and answers latest 2023Two phase conductors of a 138kV transmission line come in contact due to a storm, creating a phase to phase fault. The distance relay at each end of the line tripped and isolated the line. What two measured parameters of the line caused the distance relay to operate? Temperature and length MWs and MVARs Voltage and current Resistance and Impedance Voltage and current What is the main cause for having low voltage on the Transmission and Dist...
    (0)
  • $15.49
  • + learn more