Rigging test 1 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Rigging test 1? On this page you'll find 375 study documents about Rigging test 1.
Page 4 out of 375 results
Sort by
-
Package deal for NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers
- Package deal • 11 items • 2024
-
- $26.49
- + learn more
NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers
NCCCO Sample Test Questions with 100% Correct Answers
NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A
NCCCO General Knowledge Practice Exam Q&A 100% A+Graded
NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers
tower Crane Practice Test Exam (questions and answers)
-
TOWER CRANE EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS RATED 100% CORRECT
- Exam (elaborations) • 15 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
TOWER CRANE EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS RATED 100% CORRECT 
OSHA 1926.550 
Which of the following osha regulations govern suspended personal platforms 
15 feet 
According to ASME B30.3 the prohibited zone for power lines that are 60KV is... 
5 to 1 
Load hoist rotation wire rope according to ASME B30.3 has a design factor of 
5 to 1 
According to ASME B30.3 when lifting a suspended personnel platform the design factor for the rigging hardware is 
5 to 1 
ASME B30.3 load ho...
-
Rigging Practices Course Questions and Answers (100% Solved) Latest.
- Exam (elaborations) • 11 pages • 2023
-
- $10.99
- + learn more
Rigging Practices Course Questions and Answers (100% Solved) Latest. 
A load chart range diagram can best be used to help identify: net capacity 
for mobile crane working at maximum radius, exceeding what percentage of the cranes capacity 
requires the radius to be verified? 80% 
the minimum depth of thread engagement for a 1/2 in eyebolt into steel object is? 3/4 in 
when tying knots in synthetic rope lashing, the rated load is increased by 50% ? false 
the size of shackle that can be used in t...
-
OSHA 500 Construction Trainer Exam with Correct Solutions
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
OSHA 500 Construction Trainer Exam with 
Correct Solutions 
3 major types of rigging hazards - Answer -falls 
struck by 
electric 
materials handling aparatus in rigging (3) - Answer -wire ropes 
chains 
synthetic (web) slings 
inspections (how often and by whom) - Answer -prior to each use by a competent person 
rigging restrictions for wire rope - Answer -less than 10% broken wires in 8 diameter 
requirements for special custom-designed accessories in relation to safe working loads for rigging...
-
Nccco Core + Specialty Test Prep Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 20 pages • 2024
-
- $12.49
- + learn more
ASME B30.5 
Correct Answer: Mobile and Locomotive cranes, all types 
ASME B30.3 
Correct Answer: Tower Cranes 
ASME B30.23 
Correct Answer: Personel Lifting Regs 
OSHA 29 CFR 1926.1400 Series 
Correct Answer: Cranes & Derrick's used in Construction regs. 
Rotation Resistant Wire Rope 
Correct Answer: 2 randomly broken wires in 6 diameters. 
4 randomly broken wires in 30 diameters. 
2 
Safety factor 5.0 
Safety factor personel lifts 10-1 
ASME B30.9 
Correct Answer: Slings 
Personel Platforms 
...
And that's how you make extra money
-
Rigging practices with 100% correct answers
- Exam (elaborations) • 9 pages • 2024
-
- $17.49
- + learn more
net capacity 
A load chart range diagram can best be used to help identify: 
 
 
 
80% 
for mobile crane working at maximum radius, exceeding what percentage of the cranes capacity requires the radius to be verified? 
 
 
 
3/4 in 
the minimum depth of thread engagement for a 1/2 in eyebolt into steel object is? 
 
 
 
false 
when tying knots in synthetic rope lashing, the rated load is increased by 50% ? 
 
 
 
equal to or greater than 
the size of shackle that can be used in the eye of a wire ...
-
NCCR BOILERMAKER TRUE QUESTIONS AND ANSWERS RATED A+
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
NCCR BOILERMAKER TRUE 
QUESTIONS AND ANSWERS RATED A+ 
- Which regulatory body mandates training for operating personal lifting equipment? OSHA 
- Where is an RTJ gasket typically utilized? High-pressure systems 
- Among the options, which is NOT an example of internal manway hardware? 
a) slide fastener 
b) half washer 
c) bellville washer Slide fastener 
- What tool measures how much a fastener is being tightened? Torque wrench 
- What fitting makes it easy to disassemble threaded piping? Unio...
-
STSC Drill Test (2024) || Complete Questions & Answers (Graded A+)
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $13.00
- + learn more
STSC Drill Test (2024) || Complete Questions & Answers (Graded A+) 
STSC Drill Test (2024) || Complete Questions & Answers (Graded A+) 
 
The strongest motivator, according to the contemporary theory is - ANSWER - Recognition of achievement for performance. 
 
when working on scaffold 20ft high who must approve the scaffold for use - ANSWER - Competent person; 
 
The major cause of serious industrial injuries is - ANSWER - struck by falling object 
 
The investigation of serious or fatal mishaps...
-
TOWER CRANE QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS
- Exam (elaborations) • 15 pages • 2024
-
- $9.99
- + learn more
TOWER CRANE QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS 
 
Which of the following OSHA regulations govern suspended personnel platforms? 
OSHA 1926.1431 
According to ASME B30.3 The prohibited zone for power lines that are 60 kV is 
15 ft 
According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of 
5 to 1 
According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging hardware is 
5 to 1 
According to ASME B30.3 Load hoist ropes t...
-
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Verified)
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
If load is undetermined who is to find out if load weight does not exceed crane rating at radius 
at which the load is to be lifted - ANSWER Person responsible for lift 
Where should climbing instructions be kept - ANSWER ON Site 
All climbing operations shall be performed under the supervision of - ANSWER Qualified 
person 
When cranes are erected, load limiting devices shall be tested for proper setting and 
operation - ANSWER Before crane is placed in service 
Hooks shall be equipped with lat...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia