Rough lumber - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Rough lumber? On this page you'll find 133 study documents about Rough lumber.

Page 4 out of 133 results

Sort by

NOCTI Prep carpentry questions and answers
  • NOCTI Prep carpentry questions and answers

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • jack stud - Short stud on inside of opening, supports header Header - Spans opening, transfers weight around doors and windows King stud - Full length stud on outside of openings Cripple studs - short studs below sills or above headers mud sill - pressure treated lumber that connects floor frame to foundation Joists - Horizontal flooring members that make up a floor frame Rim Board - joist that goes around perimeter of floor Sub floor - Plywood that covers joists rough op...
    (0)
  • $11.39
  • + learn more
Woodshop Test Question With Correct Answers.Already Passs!!!
  • Woodshop Test Question With Correct Answers.Already Passs!!!

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • Woodshop Test Question With Correct Answers.Already Passs!!! 4 inches maintain a _____ margin of safety from the blade, This means that you must keep your hands _______ away from the saw blade. safety glasses wear ______ proper keep the blade guard in the ______ position at all times firmly, fence hold stock ____ on the table and against the ____ so it does not shift or kick out when using the miter saw complete stop after making a cut, but before raising the saw blade on the miter saw...
    (0)
  • $10.50
  • + learn more
NCCER Module 2 Exam Questions and Answers 100% pass
  • NCCER Module 2 Exam Questions and Answers 100% pass

  • Exam (elaborations) • 23 pages • 2024
  • NCCER Module 2 Exam Questions and Answers 100% pass An estimator is preparing a bid for a home remodeling project. She has determined that the new garage needs 324 feet of 2x10 lumber; the new rec room requires 430 feet; and the new upstairs bonus room needs 283 feet. How many feet of 2x10 lumber will be needed? - Answer- 1,037 feet A plumbing contractor bid the rough-in work for a new three story office building based an estimate of 850 hours of a journey-level plumber's time on the job....
    (0)
  • $12.49
  • + learn more
Lumber || A+ Verified Solutions.
  • Lumber || A+ Verified Solutions.

  • Exam (elaborations) • 4 pages • 2024
  • Lumber is divided into 3 general categories correct answers 1. Boards 2. Dimensional Lumber 3. Timber Boards correct answers Rough-cut wood 1-1 1/2 inches thick and 2 inches wide or wider Dimensional Lumber correct answers Rough-cut wood 2-4 inches thick and 2 inches wide or wider Timber correct answers Any rough-cut wood minimally 5 inches thick or thicker and 5 inches wide or wider Limber Grading correct answers All lumber is visually graded at mill after it's cut. Graders inspe...
    (0)
  • $9.99
  • + learn more
CMT 1150 Exam Questions and Answers
  • CMT 1150 Exam Questions and Answers

  • Exam (elaborations) • 6 pages • 2024
  • CMT 1150 Exam Questions and Answers what is on center - Ans:-O.C What is a door schedule? - Ans:-list of doors What is a rough opening? - Ans:-Framing size of a door or window opening what is a mark - Ans:-Door or window identification What is face of framing - Ans:-F.O.F What are king studs - Ans:-full height studs next to a door or window opening What are jack studs? - Ans:-studs that run from the sole (bottom) plate to the top of a door or window opening what is header - Ans:-Transfe...
    (0)
  • $9.99
  • + learn more
NOCTI CARPENTRY EXAM QUESTIONS (159)WITH CORRECT ANSWERS GRADED A+
  • NOCTI CARPENTRY EXAM QUESTIONS (159)WITH CORRECT ANSWERS GRADED A+

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • NOCTI CARPENTRY EXAM QUESTIONS (159)WITH CORRECT ANSWERS GRADED A+ 1. What are plywood clips used for? 2. a contractor is to excavate a Supporting roof sheathing edges between the trusses - clips are used when sheath- ing roofs framed with trusses due to be- ing 24 inch on center. The clip holds the plywood from being too weak between spans. The answer is calculated by subtracting basement containing 58,500 cu. each of the cu ft dimensions from the total. gt. she re...
    (0)
  • $9.99
  • + learn more
HBI/NOCTI TEST PREP CARPENTRY QUESTIONS AND ANSWERS WITH SOLUTIONS 2024
  • HBI/NOCTI TEST PREP CARPENTRY QUESTIONS AND ANSWERS WITH SOLUTIONS 2024

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • jack stud - ANSWER Short stud on inside of opening, supports header Header - ANSWER Spans opening, transfers weight around doors and windows King stud - ANSWER Full length stud on outside of openings Cripple studs - ANSWER short studs below sills or above headers mud sill - ANSWER pressure treated lumber that connects floor frame to foundation Joists - ANSWER Horizontal flooring members that make up a floor frame Rim Board - ANSWER joist that goes around perimeter of floor S...
    (0)
  • $9.99
  • + learn more
NOCTI PREP CARPENTRY WITH COMPLETE SOLUTIONS
  • NOCTI PREP CARPENTRY WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 3 pages • 2023
  • Available in package deal
  • jack stud Short stud on inside of opening, supports header Header Spans opening, transfers weight around doors and windows King stud Full length stud on outside of openings Cripple studs short studs below sills or above headers mud sill pressure treated lumber that connects floor frame to foundation Joists Horizontal flooring members that make up a floor frame Rim Board joist that goes around perimeter of floor Sub floor Plywood that cover...
    (0)
  • $13.49
  • + learn more
AIC AC EXAM - ENGINEERING CONCEPTS EXAM | QUESTIONS & ANSWERS  (VERIFIED) | LATEST UPDATE | GRADED  A+
  • AIC AC EXAM - ENGINEERING CONCEPTS EXAM | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • 1 AIC AC EXAM - ENGINEERING CONCEPTS EXAM | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+ Sweet's Catalog Correct Answer: compiles technical construction material advertising literature published by suppliers. It is organized by Construction Specification Institute's Master Format American Society for Testing and Materials (ASTM) Correct Answer: Organization engaged in the standardization of technical specifications and testing methods American Standards Associatio...
    (0)
  • $11.49
  • + learn more
Counterbalance forklift and Rough Terrain forklift Operator Certification Exam Questions With Complete Solutions
  • Counterbalance forklift and Rough Terrain forklift Operator Certification Exam Questions With Complete Solutions

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • Sitdown types - ANSWER--have 4 wheels -also have 3 wheel versions greater maneuverability stand up models - ANSWER-for use in tight spaces counterbalance forklift fall under - ANSWER-Class 1,4,5,7 rough terrain forklifts fall under - ANSWER-Class 7 Most common type of forks - ANSWER-ITA & Shaft Diff styles of Forks - ANSWER-- lumber - folding -gypsum -drum -block -spark retardant When does a standard fork has to be replaced? - ANSWER-As soon as the thickness of the blade...
    (0)
  • $10.99
  • + learn more