Vadose zone - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Vadose zone? On this page you'll find 99 study documents about Vadose zone.
Page 4 out of 99 results
Sort by
-
WA UST Site Assessor Exam| 85 Questions| With Complete Solutions
- Exam (elaborations) • 10 pages • 2023
- Available in package deal
-
- $10.49
- + learn more
What is the hold time for soil and preserved GW GRO samples? correct answer: 14 days 
 
Is an ICC certification needed to install an AST? correct answer: No 
 
Flammability limits of gasoline correct answer: 1.4 to 7.6% 
 
How many days do you have from a tank closure to report/provide the UST checklist to ECY? correct answer: 30 days 
 
MTCA Method A lead CUL, soil correct answer: 250 mg/kg 
 
MTCA Method A lead CUL, GW correct answer: 15 ug/L 
 
Is the vadose zone saturated or unsaturate...
-
REHS Study Exam– Water.
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
REHS Study Exam– Water. 
 
 
Saturated zone - CORRECT ANSWER all pore spaces filled with water 
allows water to travel 
 
Water table - CORRECT ANSWER top of saturated zone 
 
Vadose zone - CORRECT ANSWER part of unsaturated zone 
 
Flowing artesian well - CORRECT ANSWER pressure causes water to rise above ground level 
 
Aquaclude - CORRECT ANSWER Confining layer, rock or clay 
 
Confined aquifer - CORRECT ANSWER groundwater below layer of solid rock or clay 
 
Aquitard - CORRECT ANSWER retar...
-
WA UST Site Assessor Exam Questions With Complete Solutions Latest Updated 2024/2025 (Graded A+)
- Exam (elaborations) • 8 pages • 2024
-
- $14.99
- + learn more
WA UST Site Assessor Exam Questions With Complete Solutions Latest Updated 2024/2025 (Graded A+) What is the hold time for soil and preserved GW GRO samples? - 14 days 
Is an ICC certification needed to install an AST? - No 
Flammability limits of gasoline - 1.4 to 7.6% 
How many days do you have from a tank closure to report/provide the UST checklist to ECY? - 30 
days 
MTCA Method A lead CUL, soil - 250 mg/kg 
MTCA Method A lead CUL, GW - 15 ug/L 
Is the vadose zone saturated or unsaturated? -...
-
WA UST Site Assessor Exam Study Guide | 85 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 8 pages • 2023
-
- $10.49
- + learn more
What is the hold time for soil and preserved GW GRO samples? - 14 days 
Is an ICC certification needed to install an AST? - No 
Flammability limits of gasoline - 1.4 to 7.6% 
How many days do you have from a tank closure to report/provide the UST checklist to ECY? - 30 
days 
MTCA Method A lead CUL, soil - 250 mg/kg 
MTCA Method A lead CUL, GW - 15 ug/L 
Is the vadose zone saturated or unsaturated? - Unsaturated 
List in order of most mobile to least mobile: Bunker C, heating oil, diesel, gasoli...
-
WA UST Site Assessor Exam |80| Questions With Verified Answers
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
WA UST Site Assessor Exam |80| Questions With Verified Answers 
What is the hold time for soil and preserved GW GRO samples? ANS-14 days 
 
Is an ICC certification needed to install an AST? ANS-No 
 
Flammability limits of gasoline ANS-1.4 to 7.6% 
 
How many days do you have from a tank closure to report/provide the UST checklist to ECY? ANS-30 days 
 
MTCA Method A lead CUL, soil ANS-250 mg/kg 
 
MTCA Method A lead CUL, GW ANS-15 ug/L 
 
Is the vadose zone saturated or unsaturated? ANS-Unsatur...
Get paid weekly? You can!
-
WA UST SITE ASSESSOR EXAM |GUARANTEED PASS!!
- Exam (elaborations) • 12 pages • 2024
-
- $11.49
- + learn more
What is the hold time for soil and preserved GW GRO samples? - ACCURATE ANSWERS 14 days 
 
Is an ICC certification needed to install an AST? - ACCURATE ANSWERS No 
 
Flammability limits of gasoline - ACCURATE ANSWERS 1.4 to 7.6% 
 
How many days do you have from a tank closure to report/provide the UST checklist to ECY? - ACCURATE ANSWERS 30 days 
 
MTCA Method A lead CUL, soil - ACCURATE ANSWERS 250 mg/kg 
 
MTCA Method A lead CUL, GW - ACCURATE ANSWERS 15 ug/L 
 
Is the vadose zone saturated o...
-
WA UST Site Assessor Exam 2024 (A+ GRADED)
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $9.69
- + learn more
What is the hold time for soil and preserved GW GRO samples? correct answers 14 days 
 
Is an ICC certification needed to install an AST? correct answers No 
 
Flammability limits of gasoline correct answers 1.4 to 7.6% 
 
How many days do you have from a tank closure to report/provide the UST checklist to ECY? correct answers 30 days 
 
MTCA Method A lead CUL, soil correct answers 250 mg/kg 
 
MTCA Method A lead CUL, GW correct answers 15 ug/L 
 
Is the vadose zone saturated or unsaturated? cor...
-
WA UST SITE ASSESSOR EXAM | QUESTIONS & 100% CORRECT ANSWERS (VERIFIED) | LATEST UPDATE | GRADEA+
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
WA UST SITE ASSESSOR EXAM | 
QUESTIONS & 100% CORRECT ANSWERS 
(VERIFIED) | LATEST UPDATE | GRADEA+ 
What is the hold time for soil and preserved GW GRO samples? 
Correct Answer: 14 days 
Is an ICC certification needed to install an AST? 
Correct Answer: No 
Flammability limits of gasoline 
Correct Answer: 1.4 to 7.6% 
How many days do you have from a tank closure to report/provide the UST checklist to 
ECY? 
Correct Answer: 30 days 
MTCA Method A lead CUL, soil 
Correct Answer: 250 mg/kg 
M...
-
WA UST Site Assessor Exam 1. What is the hold time for soil and preserved GW GRO samples?: 14 days 2. Is an ICC certification needed to install an AST?: No 3. Flammability limits of gasoline: 1.4 to 7.6% 4. How many days do you have from a tank closure to
- Exam (elaborations) • 5 pages • 2023
-
- $10.49
- + learn more
WA UST Site Assessor Exam 
1. What is the hold time for soil and preserved GW GRO samples?: 14 days 
2. Is an ICC certification needed to install an AST?: No 
3. Flammability limits of gasoline: 1.4 to 7.6% 
4. How many days do you have from a tank closure to report/provide the UST 
checklist to ECY?: 30 days 
5. MTCA Method A lead CUL, soil: 250 mg/kg 
6. MTCA Method A lead CUL, GW: 15 ug/L 
7. Is the vadose zone saturated or unsaturated?: Unsaturated 
8. List in order of most mobile to least m...
-
WA UST Site Assessor Exam Questions With Complete Solutions | Latest 2024/2025 | 100% Correct | Graded A+
- Exam (elaborations) • 8 pages • 2024
-
- $13.49
- + learn more
WA UST Site Assessor Exam Questions With Complete Solutions | Latest 2024/2025 | 100% Correct | Graded A+. What is the hold time for soil and preserved GW GRO samples? - 14 days 
Is an ICC certification needed to install an AST? - No 
Flammability limits of gasoline - 1.4 to 7.6% 
How many days do you have from a tank closure to report/provide the UST checklist to ECY? - 30 
days 
MTCA Method A lead CUL, soil - 250 mg/kg 
MTCA Method A lead CUL, GW - 15 ug/L 
Is the vadose zone saturated or unsa...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia