What are in submittals Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about What are in submittals? On this page you'll find 162 study documents about What are in submittals.

Page 4 out of 162 results

Sort by

COSC 153 Exam Questions And Answers (Verified And Updated)
  • COSC 153 Exam Questions And Answers (Verified And Updated)

  • Exam (elaborations) • 12 pages • 2024
  • COSC 153 Exam Questions And Answers (Verified And Updated) Any successful relationship relies on successful ___________ - answerCommunication ________ document prepared by a subcontractor or general contractor where they seek clarification and direction on questions related to the contract documents - answerrequest for information _______ is The first formal communication under the construction contract - answerNotice to Proceed why is cost estimating so important? - answer-Determines a ...
    (0)
  • $12.49
  • + learn more
 Procore student certification exam questions and answers 100% Verified Correct
  • Procore student certification exam questions and answers 100% Verified Correct

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • Procore student certification exam questions and answers True or False: When you delete a specification from the Specifications list page, you will delete the specification and all of its revisions. True True or False: Punch List templates are only available for use on Procore's mobile application. false Which of the following can you do when viewing a drawing on a mobile device? B and C True or False: You can create a commitment directly from an awarded bid true What d...
    (0)
  • $9.49
  • + learn more
COSC 153 Exam Questions And Answers (Verified And Updated)
  • COSC 153 Exam Questions And Answers (Verified And Updated)

  • Exam (elaborations) • 12 pages • 2024
  • COSC 153 Exam Questions And Answers (Verified And Updated) Any successful relationship relies on successful ___________ - answerCommunication ________ document prepared by a subcontractor or general contractor where they seek clarification and direction on questions related to the contract documents - answerrequest for information _______ is The first formal communication under the construction contract - answerNotice to Proceed why is cost estimating so important? - answer-Determines a ...
    (0)
  • $11.49
  • + learn more
LEED GA EXAM Certification Questions And Correct Verified Answers Graded A+.
  • LEED GA EXAM Certification Questions And Correct Verified Answers Graded A+.

  • Exam (elaborations) • 38 pages • 2024
  • Available in package deal
  • What is the first Level of LEED Certification called? a. Copper b. Certified c. Gold d. Silver e. Platinum - correct answer Certified What credit requires FTE for calculations? (Select 2) a. Outdoor Water Use Reduction b. Environmental Tobacco Smoke Control c. Bicycle Facilities d. Indoor Water Use Reduction e. Green Power and Carbon Offsets - correct answer Bicycle Facilities Indoor Water Use Reduction ...
    (0)
  • $16.49
  • + learn more
ENCE 325 Final Exam Questions and Answers 100% Correct
  • ENCE 325 Final Exam Questions and Answers 100% Correct

  • Exam (elaborations) • 9 pages • 2023
  • Available in package deal
  • ENCE 325 Final Exam Questions and Answers 100% Correct UMD is a public university that recently completed a bidding process for a new academic center. Most of the bid documents will become _____ that define the legal terms of the contract. The contracts between GC's and subcontractors typically reference these documents. Contract Documents A variety of separate documents typically comprise the contract documents. Select all of the following that are generally included General Conditions, Agre...
    (0)
  • $9.99
  • + learn more
Procore Student Questions and Answers 100% Solved
  • Procore Student Questions and Answers 100% Solved

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • Procore Student Questions and Answers 100% Solved True or False: At the Company level, users will only have access to view projects to which they have been specifically granted access to by a company/project administrator. True What information can be found in the Commitment Summary Report? A financial overview of commitments, commitment change orders, and payments What information is NOT displayed on a project's Home tab? All of the Above How do you make an uploaded file or folder private?...
    (0)
  • $9.99
  • + learn more
CQM-C Exam 40 Questions with Verified Answers,100% CORRECT
  • CQM-C Exam 40 Questions with Verified Answers,100% CORRECT

  • Exam (elaborations) • 4 pages • 2024
  • CQM-C Exam 40 Questions with Verified Answers The purpose of Construction Quality Management is to: - CORRECT ANSWER Achieve the quality established by properly developed requirements through the combined responsibility, but seperate efforts of contractpr smd government personnel. Construction Quality Management is the performance of tasks, which ensure that construction is performed. - CORRECT ANSWER According to plans and specifications, on time, within a defined budget and a safe work e...
    (0)
  • $10.99
  • + learn more
AIC EXAM | QUESTIONS & ANSWERS  (VERIFIED) | LATEST UPDATE | GRADED  A+
  • AIC EXAM | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+

  • Exam (elaborations) • 130 pages • 2024
  • Available in package deal
  • 1 AIC EXAM | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+ . What percentage of conversations do listeners remember of what they hear? A. 10% B. 30% C. 50% D. 90% Correct Answer: 10% What percentage of conversations do speakers remember of what they say and do? A. 30% B. 50% C. 70% D. 90% Correct Answer: 90% 2 When giving presentations, people should do which of the following? A. present extra information beyond their primary goal to demonstrate their expe...
    (0)
  • $18.49
  • + learn more
PROCORE PROJECT MGMT.-66 QUESTIONS AND ANSWERS
  • PROCORE PROJECT MGMT.-66 QUESTIONS AND ANSWERS

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • true or false if you have a project with more than one building or area you should enable the drawings by area feature. true true or false it's important to discuss best practices in formatting your drawings with the design team to ensure that the drawings are seamlessly processed in Pro core. true Brainpower Read More true or false when you click a projects drawings tool you should expect to see the Project's current set of drawings. Example the most recently uploaded vers...
    (0)
  • $13.99
  • + learn more
CDT Exam Questions With Correct Answers 100% Solved
  • CDT Exam Questions With Correct Answers 100% Solved

  • Exam (elaborations) • 42 pages • 2024
  • CDT Exam Questions With Correct Answers 100% Solved Which of these documents, might we find in the Project Manual but they are not contract documents? (A) The Agreement (B) Procurement Documents (C) Addendum (D) Supplemental Conditions - answerAnswer: B Reference: PDPG 11.1.6 Explanation: Procurement requirements are addressed to prospective bidders or proposers interested in the project. Although not necessarily part of a contract, the procurement requirements are usually bound wit...
    (0)
  • $14.49
  • + learn more