A major system repa - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about A major system repa? On this page you'll find 1 study documents about A major system repa.

All 1 results

Sort by

(Answered) EPA SECTION 608 CORE (2021-2022 revision) (Answered) EPA SECTION 608 CORE (2021-2022 revision)
  • (Answered) EPA SECTION 608 CORE (2021-2022 revision)

  • Exam (elaborations) • 20 pages • 2022
  • Available in package deal
  • EPA SECTION 608 CORE (2021-2022 revision) A disposable cylinder should be reduced to what pressure before scrapping? a. 0 psig b. 20 psig c. 50 psig d. 80 psig A major system repair is being performed on a R-22 appliance. What CANNOT be done to recharge the appliance? a. Add R-22 after the repair is complete. b. Retrofit the unit to R-407C. c. Use recovered or recycled R-22 from the same owner. d. Top off the unit with R-410a. A refillable cylinder must not be filled above what ...
    (0)
  • $9.99
  • 2x sold
  • + learn more