Aci field grade 1 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Aci field grade 1? On this page you'll find 621 study documents about Aci field grade 1.
All 621 results
Sort by
-
ACI Field Grade 1 Practice Test | 50 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 5 pages • 2023
- Available in package deal
-
- $7.99
- 3x sold
- + learn more
The temperature measuring device shall be cable of accurately measuring the temperature of freshly 
mixed concrete to 1°F through a range of____________________________. - 30 - 120°F 
It is acceptable to measure the temperature of freshly mixed concrete in the forms provided? - The 
sensor of the temperature measuring device has at least 3 in. of cover in all directions. 
Composite samples are required even if the only purpose for obtaining the sample is to determine 
temperature. - False 
The...
-
ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1 EXAM QUESTIONS AND VERIFIED ANSWERS WITH COMPLETE SOLUTIONS GRADED A+
- Exam (elaborations) • 43 pages • 2024 Popular
- Available in package deal
-
- $11.49
- 2x sold
- + learn more
ACI- CONCRETE FIELD-TESTING TECHNICIAN - GRADE 1 EXAM QUESTIONS AND VERIFIED ANSWERS WITH COMPLETE SOLUTIONS GRADED A+ 
 
 
Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. 
 
A. True 
B. False 
B. False 
 
ASTM C172 -Para (4.1.2) - Start molding. 
specimens for strength tests within 15 min after fabricating the 
composite sample. 
Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not e...
-
ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions and Answers 100% Pass
- Exam (elaborations) • 52 pages • 2024
- Available in package deal
-
- $14.49
- 1x sold
- + learn more
ACI- Concrete Field-Testing Technician 
- Grade 1 Exam Questions and 
Answers 100% Pass 
Q1. Start molding specimens for strength tests within 30 minutes after fabricating the 
composite sample. 
A. True 
B. False - Answer- B. False 
ASTM C172 -Para (4.1.2) - Start molding. 
specimens for strength tests within 15 min after fabricating the 
composite sample. 
Q2. The maximum allowable time between obtaining the first and last portions of the 
composite sample may not exceed 5 minutes. 
A. True 
B...
-
ACI Concrete Field Technician - Grade 1 Exam Questions with 100% correct Answers ( A+ GRADED LATEST UPDATE 2024/2025).
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $11.49
- 1x sold
- + learn more
ACI Concrete Field Technician - Grade 1 Exam Questions with 100% correct Answers ( A+ GRADED LATEST UPDATE 2024/2025).
-
Combined ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12) EXAM GUIDE
- Package deal • 5 items • 2024
-
- $27.99
- 1x sold
- + learn more
Combined ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12) EXAM GUIDE Combined ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12) EXAM GUIDE
As you read this, a fellow student has made another $4.70
-
ACI Field Grade 1 Practice Test questions and complete answers.
- Exam (elaborations) • 10 pages • 2024
-
- $17.99
- + learn more
ACI Field Grade 1 Practice Test questions and complete answers. ACI Field Grade 1 Practice Test questions and complete answers. ACI Field Grade 1 Practice Test questions and complete answers. ACI Field Grade 1 Practice Test questions and complete answers.
-
ACI Field Grade 1 Testing Exam Questions and Answers 100% Pass
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
ACI Field Grade 1 Testing Exam 
Questions and Answers 100% Pass 
It is acceptable to measure the temperature of freshly mixed concrete in the forms 
provide : 
A. The sensor of the temperature measuring device has at least 3 " of cover in all 
directions. 
B. The concrete has been properly consolidated. 
C. The sensor of the temperature measuring device is made of metal. 
D. The concrete has been wet sieved. - Answer- A. The sensor of the temperature 
measuring device has at least 3 " of cover...
-
ACI Field Grade 1 Testing Exam Questions and Answers 100% Pass
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
ACI Field Grade 1 Testing Exam 
Questions and Answers 100% Pass 
It is acceptable to measure the temperature of freshly mixed concrete in the forms 
provide : 
A. The sensor of the temperature measuring device has at least 3 " of cover in all 
directions. 
B. The concrete has been properly consolidated. 
C. The sensor of the temperature measuring device is made of metal. 
D. The concrete has been wet sieved. - Answer- A. The sensor of the temperature 
measuring device has at least 3 " of cover...
-
ACI FIELD GRADE 1 Correctly Answered Questions| UpToDate | Already Graded A+
- Exam (elaborations) • 22 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
Collecting a representative sample of concrete to be tested is as important as executing 
the test methods to obtain. ☑: Accurate Results 
This practice covers sampling from five types of equipment, which are ___________, 
___________, __________, __________, and __________. ☑: stationary mixers, paving mixers, revolving truck mixers,continuous mixers. 
The elapsed time between obtaining the first and final portions of a composite sample 
shall not exceed. ☑: 15 minutes 
Portions of a c...
-
ACI Field Grade 1 Practice Test 2024 Questions and Answers 100% Correct
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
ACI Field Grade 1 Practice Test 2024 Questions and Answers 100% Correct ACI Field Grade 1 Practice Test 2024 Questions and Answers 100% Correct ACI Field Grade 1 Practice Test 2024 Questions and Answers 100% Correct ACI Field Grade 1 Practice Test 2024 Questions and Answers 100% Correct The temperature measuring device shall be cable of accurately measuring the temperature of freshly mixed concrete to 1°F throught a range of____________________________. - ANSWER 30 - 120°F 
 
It is acceptable ...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia