ASME SECTION 9 EXAM QUESTIONS WITH CORRECT ANSWERS
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
ASME SECTION 9 EXAM QUESTIONS WITH CORRECT ANSWERS...
-
API 570 Exam Questions With 100% Correct Answers.
- Exam (elaborations) • 12 pages • 2024
-
- $12.49
- + learn more
API 570 Exam Questions With 100% 
Correct Answers. 
Code to follow when performing an internal inspection on pipe - answer"API 510" 
Positive material identification (PMI) - answer"API 578" 
Fitness for service - answer"API 579" 
Risked based inspection (RBI) - answer"API 580" 
Valve inspection and testing - answer"API 598" 
Cathodic protection - answer"API 651" 
Welding on in-service equipment containing the flammables - answer"API 2201" 
NDE procedure guidelines - answer"ASME SE...
-
API 570 EXAM QUESTIONS AND ANSWERS
- Exam (elaborations) • 14 pages • 2023
- Available in package deal
-
- $12.49
- + learn more
Code to follow when performing an internal inspection on pipe - Answer- "API 510" 
 
Positive material identification (PMI) - Answer- "API 578" 
 
Fitness for service - Answer- "API 579" 
 
Risked based inspection (RBI) - Answer- "API 580" 
 
Valve inspection and testing - Answer- "API 598" 
 
Cathodic protection - Answer- "API 651" 
 
Welding on in-service equipment containing the flammables - Answer- "API 2201" 
 
NDE procedure guidelines - Answer- "ASME SECTION V" 
 
Design co...
-
API 570 Closed Book Test Exam Questions With Verified And Reviewed Answers | Already Passed!!
- Exam (elaborations) • 55 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
API 570 Closed Book Test Exam 
Questions With Verified And 
Reviewed Answers 
| Already Passed!! 
1) A welding operator is to be qualified by radiography using his 1st 
production weld, what is the minimum length of the radiograph to be 
performed on his weld? - ANSWER 
6" Sec. IX QW-305.1 
2) A welder makes performance test on pipe in the 1G position, How many 
bend test are required to qualify his performance? - ANSWER 
(2) 1 
Face bend and 1-Root bend Sec. IX QW-302.3 F...
-
Massachusetts 2a Hoisting License Questions And Answers Latest Updated 2024/2025 | Scored A+
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
Massachusetts 2a Hoisting License Questions And Answers Latest Updated 2024/2025 | Scored A+. What is the purpose of the swing gear on an excavator: answer- It 
connects the car body to the tracks 
2. Who is responisble for inspecting a trench before anyone goes in it: 
answer- The equipment operator 
3. What is the prefered sling angle: answer- 60* 
4. The top of the spoil pile is called: answer- The crown 
5. A four footbdeep trench requires an additional ladder for each _ of open 
trench: ans...
Get paid weekly? You can!
-
Fundamentals of Geometric Dimensioning and Tolerancing 3 rd Edition
- Exam (elaborations) • 15 pages • 2024
-
- $14.49
- + learn more
undamentals of GD&T, 3rd Edition, by Alex Krulikowski – Answer Guide 11JUN12 
Copyright © 2012 Effective Training Inc. Page 3 of 15 
Chapter 1 
True / False Multiple Choice Application Problems 
1. T 
2. F 
3. F 
4. T 
5. T 
6. T 
7. T 
1. C 
2. D 
3. D 
4. D 
5. D 
1. ASME Y14.5-2009 
2. Yes; it may be used as part of a contract, to resolve product 
acceptance disputes, or to prove compliance with regulations 
3. It will cost a company in the form of money, time, materials, or ...
-
API 570 Open Book Exam Questions with Certified Solutions
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
API 570 Open Book Exam Questions 
 
with Certified Solutions 
 
1- A hydrotest is being conducted on an underground line as a substitute for the external 
inspection. The test pressure is 200 psig. At the end of the test, the pressure must be at least: 
C.190 psig 
 
2- Determine the maximum allowed pressure for a class 300 flange that has a design temperature 
of 950 degrees F. The flange material is ASTM A217 gr.C12 B. 375 psig 
 
3- An 8 NPS pipe is being replaced with A106 gr. B material. Th...
-
ASNT VT LEVEL II EXAMS QUESTIONS AND VERIFIED ANSWERS GRADED A++
- Exam (elaborations) • 24 pages • 2024
-
- $9.49
- + learn more
ASNT VT LEVEL II EXAMS QUESTIONS AND VERIFIED ANSWERS GRADED A++ 
 
B. every 3 years by retraining and retesting 
1. Per ASNT Section XI, NDE personnel shall be recertified:A. every 5 years by re-examination 
B. every 3 years by retraining and retesting 
C. every 3 years based on continuing satisfactory performance 
D. annually by retraining 
B. his certification is automatically terminated 
2. Per SNT-TC-1A, when an employee leaves his employer:A. his certification automatically transfers to hi...
-
Massachusetts 2a Hoisting License Questions With Verified Answers Latest Updated 2024/2025 | Scored A+
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
Massachusetts 2a Hoisting License Questions With Verified Answers Latest Updated 2024/2025 | Scored A+. What is the prefered sling angle: answer- 60* 
4. The top of the spoil pile is called: answer- The crown 
5. A four footbdeep trench requires an additional ladder for each _ of open 
trench: answer- 25ft 
6. Materials mist be kept back from the edge of the trenxh a minimum of: 
answer- Two feet 
7. When can inspector revoke a hoistinf licence: answer- Failure to pay excise 
tax 
8. Who develop...
-
API-510 Closed Book (Verified on test) Questions and Answers 2024
- Exam (elaborations) • 38 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
If a welder has qualified in the shielded metal arc welding, submerged arc welding, and gas tungsten arc welding processes but has welded in only one of them, qualification for the other 2 processes remains valid: 
A: for 6 months 
B: for 1 year 
C: for 2 years 
D: Indefinitely - A: for 6 months 
 
One purpose of reviewing previous inspection reports is to ensure that: 
A: Estimated corrosion rates for new equipment are accurate 
B: Pressure relief valves have been installed prior to placing the...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia